Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

CIVIL .

ENG / Kareem Aly


Address : Sharkia - Egypt
Mobile : +201145577533
E-mail : Hamozanono2@gmail.com
I have Egyptian, Saudi&Egyptian driving license.

Career objectives:
● I am 12 years’ experience Civil Engineer Seeking for a challenging job in the
domains of Construction and Contracting where I can utilize my experience
and enhance my skills.
● I hope that I work with work entity that estimate my abilities and help me and
guide me to everything that brings me to succeed and excel in that and be a
reason for their success and advancement.

Experience &Projects:
✰BARCO MISR COSTRUCTION COMPANY
From APR 2018 till NOW
Add: NEW GIZA– EGYPT
Project: SAMCRETE (30 villas)
Client: SAMCRETE
Budget:52 Million LE
Position: CONSTRUCTION MANAGER
Job Description:

● Manage and control the overall construction supervision of the project


effectively.
● Manage to implement the project within the required time, budget and at a high
level of technical quality
● Supervision and monitoring of the construction duties on site such as civil and
structural to ensure that the work is progressing in accordance with the plans,
specifications, schedule, budget and quality standard.
● Corrective actions to be implemented.
● Prepares cost estimate. Weekly−& monthly progress report.
✰ACTIVE BRAINS CONSULTANT GROUP.
From May 2016 till Mar 2018
Add: MATROUH – EGYPT
Project: ceaser bay (158 villas)
Client: SODIC
Budget:178 Million LE
Position: civil engineer
Job Description:
● Manage and control the overall construction supervision of the project
effectively.
● Manage to implement the project within the required time, budget and at a high
level of technical quality
● Supervision and monitoring of the construction duties on site such as civil and
structural to ensure that the work is progressing in accordance with the plans,
specifications, schedule, budget and quality standard.
● Corrective actions to be implemented.
● Prepares cost estimate. Weekly−& monthly progress report.
● Provides input to site inspection, cost and schedule controls and field
engineering support. Material receiving and reporting, prepares site
construction progresses−& measurement. Review progress report and
recommends for progress payment.
● Coordination and provide inputs to the Design Engineers−& Architects
regarding the status of the project & the implementation of the Approved for

Construction Plan.
● Implements communicating accurately and timely information to the Client
and project team regarding the status and progress of the project.
● Direct, coordinate and monitors the day to day activities of the site supervision
team.
● Ensure that all the work is performed strictly in accordance with its Drawings,
Specifications and Contract Conditions.
● coordination of other projects requirements and partially managing
the Company as well,
-----------------------------------------------------------------------------------
✰YARD CONSULTANT ENGINEERING OFFICE (YCEO ).
FromDec 2014To Mar 2016
Add: MAKKAH – KSA
Project: contract 18 c ( 2 ground water tanks – 15 km main water line).
Client: Nation Water Company
Budget:178 Million SAR
Position: Project Manager
Job Description:
● Manage and control the overall construction supervision of the project
effectively.
● Manage to implement the project within the required time, budget and at a high
level of technical quality
● Supervision and monitoring of the construction duties on site such as civil and
structuralto ensure that the work is progressing in accordance with the plans,
specifications, schedule, budget and quality standard.
● Prepare project schedule, update and revise according to project requirements
and parameters

● Conducts meetings with the Clients and Project Teams, identify possible
problems that might occur during the course of construction and its
recommendation and corrective actions to be implemented.
● Prepares cost estimate. Weekly−& monthly progress reports.
● Provides input to site inspection, cost and schedule controls and field
engineering support. Material receiving and reporting, prepares site
construction progresses & measurement. Review progress report and
recommends for progress payment.
● Coordination and provide inputs to the Design Engineers−& Architects
regarding the status of the project & the implementation of the Approved for

Construction Plan.
● Implements communicating accurately and timely information to the Client
and project team regarding the status and progress of the project.
● Direct, coordinate and monitors the day to day activities of the site supervision
team.
● Ensure that all the work is performed strictly in accordance with its Drawings,
Specifications and Contract Conditions.
● coordination of other projects requirements and partially managing
the Company as well,
-----------------------------------------------------------------------------------
✰YARD CONSULTANT ENGINEERING OFFICE ( YCEO ).
From April 2014ToDec 2014
Add : Riyadh– KSA
Project : sewage networks and lift pump stations of the west of Riyadh
Client : Nation Water Company
Budget : 280 Million SAR
Position : project engineer
Job Description:
● Manage and control the overall construction supervision of the project
effectively.
● Manage to implement the project within the required time, budget and at a high
level of technical quality
● Supervision and monitoring of the construction duties on site such as civil and
structural to ensure that the work is progressing in accordance with the plans,
specifications, schedule, budget and quality standard.
● Prepare project schedule, update and revise according to project requirements
and parameters
● Conducts meetings with the Clients and Project Teams, identify possible
problems that might occur during the course of construction and its
recommendation and corrective actions to be implemented.
● Prepares cost estimate. weekly−& monthly progress report.
● Provides input to site inspection, cost and schedule controls and field
engineering support. Material receiving and reporting, prepares site
Construction progresses−& measurement. Review progress report and
recommends for progress payment.
● Coordination and provide inputs to the Design Engineers−& Architects
regarding the status of the project & the implementation of the Approved for

Construction Plan.
● Implements communicating accurately and timely information to the Client
and project team regarding the status and progress of the project.

● Direct, coordinate and monitors the day to day activities of the site supervision
team.
● Ensure that all the work is performed strictly in accordance with its Drawings,
Specifications and Contract Conditions.
✰YARD CONSULTANT ENGINEERING OFFICE ( YCEO ).
FromJune 2011ToApril 2014
Add: BAQAA- HAIL– KSA
Project: contract A(sewage lift pump stations),
Client: Water and Electric Ministry
Budget:58 Million SAR
Position:siteEngineer
Job Description:
● Manage and control the overall construction supervision of the project
effectively.
● Manage to implement the project within the required time, budget and at a high
level of technical quality.
● Supervision and monitoring of the construction duties on site such as civil,
structural and architectural to ensure that the work is progressing in accordance
with the plans, specifications, schedule, budget and quality standard.
● Conducts meetings with the Clients and Project Teams, identify possible
problems that might occur during the course of construction and its
recommendation and corrective actions to be implemented.
● Prepares weekly−& monthly progress report.
● Provides input to site inspection, cost and schedule controls and field
engineering support. Material receiving and reporting, prepares site
construction progresses−& measurement. Review progress report and
recommends for progress payment.
● Coordination and provide inputs to the Design Engineers−& Architects
regarding the status of the project & the implementation of the Approved For
Construction Plan.
● Direct, coordinate and monitors the day to day activities of the site supervision
team.
Ensure that all the work is performed strictly in accordance with its Drawings,
Specifications and Contract Conditions.
● Maintain effective and on-going communications with construction and
contractor management teams.
✰Egyptian Contracting Company (Mokhtar Ibrahim).
FromMay 2010ToMay 2011
Add:Ash Sharqiyah – Egypt
Project: Menia El-Kamh( water high tanks)
Client:sewage and water company
Position:site engineer
Job Description:
● Implementation of the construction duties on site such as civil, structural and
architectural to ensure that the work is progressing in accordance with the
plans, specifications, schedule, budget and quality standard.
● Prepares weekly−& monthly progress report.
● Reviewing shop drawing, as built drawing and monitor the progress in site.
● Direct, coordinate and monitors the day to day activities of the site supervision
team.
● Ensure that all the work is performed strictly in accordance with its Drawings,
Specifications and Contract Conditions.
-----------------------------------------------------------------------------------
✰Alexandria contracting company(TMG)
FromSep 2007ToApril 2010
Add : Cairo – Suez high way
Project: Madinaty Main sewege, water, storm drainage and irrigation networks
Client: Talaat Mustafa Group
Budget: 300 Million EGP
Position: Site Engineer
Job Description:
● Implementation of the construction duties on site such as civil, structural and
architectural to ensure that the work is progressing in accordance with the
plans, specifications, schedule, budget and quality standard.
● Prepares weekly & monthly progress report.
● Provides input to site inspection, field engineering support. Material receiving

and reporting, prepares site construction progresses& measurement.
● Direct, coordinate and monitors the day to day activities of the site supervision
team.
● Following up on material delivery at site.
● Meeting daily, weekly and monthly milestones.
● Ensure that all the work is performed strictly in accordance with its Drawings,
Specifications.
Educational Qualifications:
✰Bsc in Civil engineering from Zigzag University July2007
Graduation Project: the effect of admixtures on concrete resistance
Project general estimate: excellent
Engineering capabilities:
• Ability to manage projects technically,financially.etc.and dealing with government
entities
• Ability to make shop drawings and time scheduling and planning.
• Ability to work on surveying Instruments.
• Ability to work under pressure.
• I have team spirit, always enthusiastic, willing to support andcollaborate with
others.

Personal Skills:
Languages:
Language Writing Reading speaking
Arabic Mother language
English Fluent Fluent Fluent
Computer:
Ms Office Excellent

Personal Info:
● Nationality : Egyptian
● Religion : Moslem
● Date of birth : 8 - 5 - 1984
● Marital status : Married
● Military status: Exemption
● Syndicate : Engineers syndicate
● Syndicate no : 34 / 2021

You might also like