Farag Farag I El-hamaky

Sr. Electrical Engineer,building Electrical system

EXPERIENCE PROFILE
 I have wide experience in construction industry and Infrastructure for more than
16 years , supervision and execution of electrical field as ( Consultant and
Contractor Eng.) in positions :
 Senior Site Electrical Engineer ,Site MEP Eng & Site Electrical Eng. Also, have
Experience in design , shopedrawing in construction field .
 I am a member of Saudi and Egyptian Council of Engineers. I am detail oriented,
efficient and organized professional with extensive experience, being a self-
motivated good team player with excellent communication skills, highly
trustworthy, discreet and ethical, I possesses strong analytical , problem solving
skills, resourceful in the completion of projects and effective at multitasking.
 additional experience especially in installation & troubleshooting of machines
,control, Electronic boards repairing (Maintenance & troubleshooting, Control &
Installation) of machines, Low Current and Experience of developing electrical
controlled test equipment and manufacturing, Experience in using electrical
YEARS OF EXPERIENCE
apparatus testing, vibration analysis, and electrical control systems , Excellent in
Total Years: 16 developing and application of electricity & electronics, Proficient in
Middle East: 13 troubleshooting problems associated with systems such as power transmission
With Parsons: 2+ and electrical machines and other fields of Electrical engineering.
Having strong skills such as:
EDUCATION
 Hardworking and determined professional with over 16 years of experience in
BSc. In Electrical Engineering, building electrical systems .
Faculty of Engineer, Tanta  management such as allocation and monitoring of resources, design
University, 2004 criteria,scheduling,control estimate and rate analysis.
 Thorough knowledge of materials and quality control.
PROFESSIONAL  Review and assessment of Shop and as-built Drawings. Storm pump station,
MEMBERSHIP potable pump station and irrigation pump station power supply, generator set
Membership of Saudi counsel and controls MCC PANEL, MCP, PLC & SCADA system and fire alarm system
of Engineers ,Membership of pluse MV &LV and communications networks.
Egyptian counsel of Engineers  Excellent analytical ability and ability to prepare technical Statements and
Reports.
OTHERS  Excellent interpersonal and managerial skills,as negotiating and advisory skills,
to coordinate projects implementation with projects owners, clients,consultant
Nationality: Egyptian
and related municipal and government officials and authorities.
Language: Arabic &English  Highly experience in MV &LV ,Street lighting networks and buildings Electrical
systems,PMS system.
Year of Birth: 1977  Ability to manage and lead a team to work on the site.
Transferable IQAMA, Saudi  Ability to work independently and in team Ability to take instructions. 
Arabia
RELEVANT PROJECT EXPERIENCE
Driving Iicence:
Saudi Archen Engineering Consultant, Saudi Arabia
Egyptian Sr. Electrical Engineer April 2017 - Present

Project: Salwa Infrastructure & Constructions Project :


Project consists of MV network and 54 Apartment, 77 Villa,
Contact Details: Adminstrationbuilding, Preliminary-Intrmrdiate & secondary Boys & girls
Mobile:+966561145822 schools, fire fighting building ,female –Men &officers Recreation building,
Emial:farag.asec@gmail.com Clinic building ,Shopping Center, Boyes & Girls Kindergaten and 2 Masjid
building with responsibility As below :
Current location and contact
number : Egypt  Communicate with client,third party and head office Concerned
Department continuously regarding Project Progress and areas of concern
00201150988626 of in progress and under constructions work.
 Coordinat with client and technical team for Material,IFC & Shop drawing
approval.

1
Farag Farag I El-hamaky
Sr. Electrical Engineer,building Electrical system

 Advice PM on any potential variation to the CONTRACTOR's /Scope of work that may generate cost or
time impact .
 Review and initial PM assessment of daily ,weekly and monthly progress invoices.
 Co-ordinate and review staff performance and ensure compliance with requirements and project
management good practice.
 Review weekly and monthly reports as presented by Contractor's .
 Review/approved by Senior MEP and present to MOI comments of non-compliance , and I or of concern
and corrective action.
 Review and inspect all requests (MIR,WIR, RFI,QTP,MS,…….) as submitted by Contractor and prepare
relevant reports and client with recommendations.
 Attend Executive meetings, weekly progress meeting, Quality meetings, Safety meetings and make
sure that weekly technical meetings are attended by all relevant parties.
 Make internal weekly meetings for my staff to disscuss Obstacles to work at the site,coordinations with
other deciplain, progress, Quality, Safety and make sure they follow last approval
updates,specifications,standared,contract documents to fast and push work for progress.
 Make sure that all staff is aware of the project approved procedures, scope of work and drawings.
 Issue and/or comment Contractor proposed site organization.
 Review and monitor in timely manner, the Contractor's proposed construction equipments and manpower
histogram and advice PM of any shortage.
 Review all shop drawing and material submittals for all building electrical system (MV ,LV & LC) used at
buildings (power supply, generator set and controls MCC Panel, MCP, PLC & SCADA system and fire
alarm system which submit and install by other sub contractors.
 Regular visit to Project site for monitoring of site activities in respect of Quality, Safety and Progress and
advice PM representatives of finding and support Engineers and inspectors , areas of concern and
corrective action.
 Study All request for information (RFI) as submitted by the CONTRACTOR in timely manner. Then
prepare the response to the CONTRACTOR without delay .
 Ensure supervision staff involvement and implementation of field Quality Control Procedures, Safety and
Progress aspects.

Saudi Arabian Parsons Limited, Saudi Arabia


MEP Engineer ,building electrical system ,September 2014 – January 2017

Project: AL-HASA Infrastructure Project :

Infrastructure of MV,LV ,Coomunications networks, street lighting for 1572 Villa, Adminstrationbuilding,
Preliminary-Intrmrdiate & secondary Boys & girls schools,bublic parks, and 2 Masjid building with
construction of three stations Irrigation,potable & sweage with responsibility As below :
 Review all shop drawing and material submittals for all electrical work (MV &LV) systems and pumping
stations: Storm pump station, potable pump station and irrigation pump station (power supply, generator
set and controls MCC PANEL, MCP, PLC & SCADA system and fire alarm system.
 Co-ordinate and review staff performance and ensure compliance with requirements and project
management good practice.
 Review and monitor in timely manner, the Contractor's proposed construction equipments and manpower
histogram and advice MOH of any shortage.
 Regular visit to Project site for monitoring of site activities in respect of Quality, Safety and Progress and
advice MOH representatives of finding , areas of concern and corrective action.
 Review and initial Senior MEP assessment of monthly progress invoices.
 Communicate with MOH Concerned Department continuously regarding Project Progress and areas of
concern.
 Propose construction staff to comply with AGREEMENT requirements and COMPANY procedures.
 Establish and maintain specific project procedures for Construction Supervision Management.
 Advice MOH representative on any potential variation to the CONTRACTOR's /Scope of work that may
generate cost or time impact and present Senior MEP assessment.
 Advise MOH of any foreseen slippage of Progress and propose corrective actions.
 Present feed back to MOH internal auditing and any other third party auditing hired by MOH.
 Review weekly and monthly reports as presented by Contractor's.

2
Farag Farag I El-hamaky
Sr. Electrical Engineer,building Electrical system

 Assess change request as submitted by Contractor after reviewed and recommended by Senior MEP and
prepare relevant reports and MOH with recommendations.
 Attend Executive meetings, weekly progress meeting, Quality meetings, Safety meetings and make sure
that weekly technical meetings are attended by all relevant parties.
 Make sure that all staff is aware of the project approved procedures, scope of work and drawings.
 Ensure contractors compliance with its contractual obligations concerning Design changes, Tender
Notices etc.
 Study All request for information (RFI) as submitted by the CONTRACTOR in timely manner. Then
prepare the response to the CONTRACTOR without delay .
 Ensure supervision staff involvement and implementation of field Quality Control Procedures, Safety and
Progress aspects.
 Area of project 1455421.274 m².

AL-MUTLAQ&BU-NUHAYAH Consulting Engineers Co, Saudia Arabia


Site Electrical Engineer (Supervision Department) June 2012 – August 2014

Al HASA housing 2 project And AL-INMAA BANK, SUADI HOLANDY BANK & RAJHI BANK.

Responsibilities: Responsible for the activities and efficiency of the staff for the satisfactory prosecution of
the Work under supervision. Has responsibility to build and maintain an organization that can effectively
provide the necessary staking, testing and inspection to ensure the Project is constructed according to plans
and Specifications. Updated familiarize with the plans, specifications and contract amendments to effectively
administer the work and ensure the Contractor's compliance with the Contract Documents. Fulfill all Principal
responsibilities of Site Electrical Engineer.
Construction of housing units of 500 villa (unit) and three Mousques of Ministry of Housing.

ANMAT Consultant Office ,Saudi Arabia


Designe and Site Electrical Engineer October 2010 – May 2012
Projects:
 The institute of vocational industrial, RIYADH
 The institute of vocational industrial ,ELKHARJ (3rd stage).
 The institute of vocational industrial , ALDREIA (2rd stage).
Responsibilities: I have extensive experience the Electrical engineering field particularly in the construction
supervision, has been involved in the design, preparation of specifications, engineering reports and
coordination with the clients for a number of projects.

 The first project consists of Main Administration Building with 1750 M²,six other workshops with
1200m² for each one and land escape all over the project. All building contains power, light, low
current (fire alarm, data &TEL, Clock, sound system and B.M.S), Earthling and lightening.
Beside to construction of infrastructure for 4 substations ringed to gather and generators for
emergency case and light street.
Cost of project over 40 Million S .R.
 2nd project consists of two workshops, guard house and land escape
All building systems as the 1st project
Cost of project over 7.5 Million S .R.
 3rd project consists of student’s house of 800² m four stare and work shop of 800 m²
Cost of project over 12 Million S .R.
All building contain systems as the 1st project

Ali Al- Wehidy EST. for Contracting, Saudi Arabia


Electrical Engineer (Commercial & Rest houses) February 2009 – September 2010
Projects:
 Managements building of (GASCO) , Riyadh &health club at Localizer Mall , Riyadh .
 for a number of exhibitions and offices  in Localizer Mall in Riyadh for example :
Office of Property Company, Office of Management Mall, Office of Gulf Investments Co.

3
Farag Farag I El-hamaky
Sr. Electrical Engineer,building Electrical system

 Prience Turki Rest house in wadi laban ,Riyadh&Prience Mansour Rest house in AL-Olayia ,Riyadh.
 Series shows Destination Maternity ,Riyadh &Jeddah &Series of Lateen for sweets , Riyadh & Al khobar.
Responsibilities: To supervise several projects simultaneously, direct and follow staff members, control
projects under construction, monitor construction activities against approved program and contract condition,
solve problems, watch for construction activities, watch out for matter of claims may be arises by the
Contractor, deal with situations when Design conflicts construction.
Administering contractual matters, quality control, Random review of working drawings (Shop Drawings) in
accordance with contract documents, communicating with contract parts and/ or concerned condition with all
services departments and agencies.
Perform Contract Management to make sure that the project is completed with best quality, safe within
approved budget and in appropriate time.

Al Alyaa Weaving Company ,Egypt


Maintenance ,Operation Engineer 2005 – 2009
 Resbinsable of operation and work of manafucture production line machines and raw material production
line machines for weaving products.
 Install Industrial Controller (hardware &software).
 Maintenance, troubleshooting and Control engineer for set machinary.
 Expertise in testing and troubleshooting, electronic and mechanical equipment with excellent reading and
analyzing schematic diagrams.
 At the same company work as electronics and power engineer in additional to control engineer.
 Installation of machines (SMIT GS920, SOMET, NOUVO600&SULZIR630) with all types of jacquard
(STAUBLI JC4, JC5&JC6) using its diagram guides.
 Maintaining and fixing all type of electronics cards.
 Maintaining and controlling engineer of machine.
 Control Panels termination with reference to wiring diagrams.
 Ability to install any new type of machines or devices using its diagram guides.
 Understanding how to solve problems and troubleshooting.

I have three certificate of training from management and industrial consultancy (MIC).
OHSAS 18001/2007 Requirements ,ISO 9001/2000 Requirements & Internal Quality Auditor
Duties:
 Operation and maintenance of machinery and the face of faults and resolved as soon as possible so as
not to delay the production cycle and thus affected the income of the individual.
 Order and buy original spare parts and the search for alternative in case of non-availability in a wide as
possible
 Repairing all electronic cards interface boards&Control machinery, updating programs and configuration.

Sales Engineer,Egypt
Al-foa'd AL-alamyia Co. for Air conditions (union Air ) . 2004 – 2005
El-Mahala El-kubra Center for TV &Radio Maintenance,Egypt
Maintenance Engineer 2003 – 2004
Training & Experience Certificates:
 Three certificate of training from management and industrial consultancy (MIC) .OHSAS 18001/2007
Requirements, ISO 9001/2000 Requirements & Internal Quality Auditor
 Training certificate at Japanese Company of communication (JELECOM) in (BPX, Fire Alarm, fire fighting,
Sound system, CCTV, Fax, micro processor, micro controller).
 Training certificate At Union Air Company for air condition systems.
 Training certificate At shrket misr in electrical power, motors, contactors, timers, switcher, liquid level,
sensors and electronics.
 Training certificate At Elmahalla computer &language Center. English and AUTO CAD 2007.
 Safty courses(SH&E) and others courses from parsons ,Many traning Certificates from Parsons U for
safty and quailty &Many traning certificates of Safety and Quality from (Parsons U)
 Saudi Arabian parsons ltd Co, Riyadh, K S A (Excperience Certificate).
 AL-MUTLAQ&BU-NUHAYAH Consulting Engineers Co, Riyadh, K S A (Excperience Certificate).
 Al Aliaa Weaving Company. EGYPT (Excperience Certificate).

4
Farag Farag I El-hamaky
Sr. Electrical Engineer,building Electrical system

 Ali Al wehidy est. for Contracting , Riyadh, K S A(Excperience Certificate).


 ANMAT Consultant Office, Riyadh, K S A (Excperience Certificate).