INDIA TOURISM DEVELOPMENT CORPORATION LIMITED

UNIT: Hotel Samrat, Chanakyapuri, New Delhi


(GOVERNMENT OF INDIA UNDERTAKING)

TENDER DOCUMENT

NAME OF WORK. Providing and fixing of RFID Door Locks at Hotel Samrat, New Delhi.

ESTIMATED COST: Rs. 7,50,867/-

CLIENT:

Samrat Hotel,
50B, Kautilya Marg,
Chanakyapuri,
New Delhi-110021.

Architect:-
M/s. Grid Architecture Interiors (P) Ltd.
116, New Mangauri,
Mehrauli- Gurgaon Road,
New Delhi-110030.
INDEX

1. Check list of documents to be submitted by the Contractor.

2. Pre-Qualification cum tender notice.

3. General condition of contract & standard contract form for Engg & Architecture work.

4. Pre-Contract Integrity Pact.

5. Special Conditions of Contract.

6. TECHNICAL SPECIFICATION.

7. List of approved make

8. EMD Refund Performa

9. Schedule of quantity (not for quoting rates).


Check List of tender Submission

Sl. No Name of Firm: Attached


Pre qualification documents Yes No
1 Tender documents duly digital signed
2 Required EMD as applicable Rs. 15100/-
3 Proof of average annual financial turnover of firm during last 3
years ending 31st March of the previous financial year of 30% of the
estimated cost.
4 Proof of having successfully complete similar works during last 7
years ending last days of the month previous to one in which tenders
are invited as following:
5 a) 3 similar completed works costing not less than the amount equal
to 40% of the estimated cost
6 b) 2 similar completed works costing not less than the amount equal
to 50% of the estimated cost.
7 c) One similar completed work costing not less than the amount
equal to 80% of the estimated cost.
8 Copy of PAN No.
9 Copy of Registration under GST
10 Copy of Registration with PF,ESI authority.
11 Copies of similar work executed in last 3 years along with work
order & performance certificate
12 History and structure of firm, name of directors/ proprietary/ partner
with technical staff.
13 List of machinery, tools and equipments
14 Bank Solvency of value not less than 40% of estimate value and not
older than 12 months from the date of issue of NIT
15 Audit balance sheet of last 3 years
For the year 2015-16
For the year 2016-17
For the year 2017-18
16 An affidavit duly notarized on stamp paper of Rs.100/- (non
judicial) stated that: - In case any ambiguity is noticed in the
documents submitted at any stage, we shall be entirely
responsible and liable for any action as deemed fit under the
law.
17 All the above certificates/ documents shall be submitted by the firm
duly signed with seal and attested by Gazetted officer or any officer
of PSE or their CA and original shall be produced for verification as
required.
18 EMD exemption Form duly filled by the contractor (Form-G)
India Tourism Development Corporation Ltd
(A Government of India Undertaking)
PRE-QUALIFICATION CUM TENDER NOTICE
Unit: Hotel Samrat, New Delhi

Sub: Providing and fixing of RFID Door Locks at Hotel Samrat, New Delhi.

1. E-tenders (online bids) are invited on behalf of India Tourism Development Corporation. Ltd. New Delhi for -
Providing and fixing of RFID Door Locks at Hotel Samrat, New Delhi for an estimated cost of Rs. 7,50,867/- +
GST (extra) as per terms and conditions indicated in the tender documents. The estimate however, is given merely
as a rough guide. Manual tender shall not be accepted.

2. The works are to be completed within 06 Months from the 7th day after the day on which the Project Engineer
issues the written order to commence the work or from the date of handing over the site, whichever is later in
accordance with the phases if any indicated by the corporation in the tender documents.

3. Tender documents can be downloaded from the ITDC website, www.theashokgroup.com (for reference only) and
Central Public Procurement Portal i.e. CPPP site https://etenders.gov.in/eprocure/app up to 27-02-2019 till 4.00
P.M. The online bids will be received up to 27-02-2019 till 4.00 P.M and the technical bids will be opened on
28-02-2019 at 4.00 PM electronically.

4. Bid Submission: - The tender shall be submitted online at Central procurement portal i.e CPP website
https://etender.gov.in/eprocure/app the applicant is expected to examine all instructions, forms, terms and conditions
in the documents. Failure to furnish all information/document as desired in the NIT or submission of a bid not
substantially responsive to the NIT in every respect will be at bidder`s risk and may result in rejection of its bid.

5. The applicant`s are advised to follow the instructions “Instructions To Bidder for Online Bid Submission” provided
in the Annexure (I) for online submission of bids.

6. Bid documents may be scanned with 100 dpi with black and white option which helps in reducing size of scanned
documents. .

7. The required tender fee is nil & Earnest Money deposit of Rs. 15100/- (Fifteen Thousand One Hundred Only)
needs to be deposited through Demand Draft which shall be in favour of Hotel Samrat payable at New Delhi issued
by a scheduled bank or electronically by NEFT/RTGS online payment in the account of `India Tourism
Development Corporation. Ltd. At the below mentioned details. The cost of money transfer (including payment
gateway commission and taxes etc.) has to be borne by the bidder. It is therefore, advised that the bidder should
consider the time to process the payment electronically ( i.e NEFT/RTGS, net banking, credit/ debit cards) to ITDC
Ltd. Into consideration before submitting the bid ITDC Ltd. Will not liable (in any case) for delay/ nonpayment in
this regard.

BANK Details of EMD Payment through NEFT/RTGS:


 Name – Syndicate Bank
 Branch Name – Akbar Bhawan (MEA), Chanakyapuri, New Delhi-110021.
 IFSC Code – SYNB0009146
Bank Account Number –91241010000015

8. The bidders who are desirous of participating in e-tender shall upload their bids in the format prescribed in the
tender document. The bidder should upload the relevant digitally signed certificated, documents etc. certificated
uploaded by them owing the responsibility for their correctness/authenticity. Bids shall be submitted online only at
website:- https://eprocure.gov.in/eprocure/app.

9. The bidders are required to have class -3 digital certificates (if they don’t already have) from the authorized digital
signature issuance company. There is no fee for registration or participation in this tender. For registration
visit https://eprocure.gov.in/eprocure/app on line bidder enrolment.

10. E- Tenders are invited for the above subject work. Normally contractors whose names are borne on the approved
list of contractors of PWD/ CPWD/ MES/ Railways/ PSUs of (Either with State or with Central govt.) may be
permitted to E- tendering according to their financial category. However in the present case eligibility criteria are
given in the para 14 to 25. The details of items are indicated in the Schedule of work/ quantity upload herewith. The
tenderer should carefully pursue the clauses mentioned as here under before submitting their tender, require
clarification if any, may be sought prior to submission of tender. No request for clarification will be entertained once
the tender is submitted.

11. The prices are to be quoted/ documents to be uploaded as per part-B (price bid).
12. Proof of having successfully Completed Similar works during last seven years ending last day of the month previous
to one in which tender are invited as per the following:
A. Three similar completed works costing not less than the amount equal to 40% of the estimated cost. Or
B. Two similar completed works costing not less than the amount equal to 50% of the estimated cost. Or
C. One similar completed work costing not less than the amount equal to 80% of the estimated cost
(Similar work means – SITC of Door locks.
Note: The contractors participating in tenders are required to submit completion certificate and copy of work
order.

13. Copies of similar works executed in last three years along with work order and performance certificate issued by the
previous clients showing the nature of work and their value.

14. Proof and Copy of valid PAN No.

15. Copy of Registration under GST Law.

16. Latest Bank Solvency certificate from a schedule bank of value not less than 40% of the estimated cost. In any case
it should not be older than 12 months from the last day of uploading of NIT.

17. Audited Balance Sheet for the last three Financial Years and i.e.
a) For the F.Y 2015-2016
b) For the F.Y 2016-2017
c) For the F.Y 2017-2018

18. Proof of average annual financial turn over during last three years ending 31st March of previous financial year
should be at least 30% the estimated cost as per format.

19. History and Structure of firm, Name of Director(s)/Partner(s)/Proprietor with details/list of technical staff.

20. List of Machinery, Tools, Plants & Equipment.

21. The bidders are requested to ensure the EMD refund form (Annexure: Schedule –G) is filled accurately and all
details have been correctly mentioned. The EMD will be refunded through online mode as per the bank details
furnished by the bidders in the EMD refund form (Annexure: Schedule-G). We will not be responsible for any
non/wrong payment made on account of any incorrect/wrong information provided in the EMD refund form.

22. All the documents mentioned at S.No.12 to 21 should to be digitally signed and should be attested by Gazetted
Officer or an Officer of a PSU or Charted Accountant of the firm. All the documents up loaded by scanning original
attested copies and in a readable font.

23. An Affidavit on stamp paper of Rs.100.00 (Non-judicial) be submitted stating that uploading of certificates
towards the technical bid “In case any ambiguity is noticed in the documents (listed out documents) submitted at any
stage, we shall be entirely responsible and liable for any action as deemed fit under the law.” This should also be
notarized.

24. Since the mode of submission of documents through E-tendering the affidavit as specified above shall be considered
valid legally for tender evaluation and the same original affidavit will be submitted by the bidders on or before
opening of the technical bid in the office of Sr. Manager (E&M), Hotel Samrat, 50B, Kautilya Marg,
Chanakyapuri, New Delhi-110021.

25. Original documents if required may be asked from the tenderers after opening of Technical bid for cross
verification.

26. Copies of other drawings and documents pertaining to the works signed for the purpose of identification by the
acceptance authority of his accredited represent representative and samples of materials to be arranged by the
contractor will be opened for inspection by tenderers at the following at the address given below during working
hours between the dates mentioned in clause 4 above, at Sr. Manager (E&M), Hotel Samrat, 50B, Kautilya
Marg, Chanakyapuri, New Delhi-110021.

27. Tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting
their tenders as to the nature of the ground and sub-soil, the form and nature of the site, the means of access to the
site, the accommodation they may require and in general shall themselves obtain all necessary information as to the
risk, contingencies and other circumstances which may influence or effect their tender. A tenderer shall be deemed
to have full knowledge of the site, whether he inspects it or not and no extra charges consequent on any
misunderstanding or he inspects it or not and no extra charges consequent on any misunderstanding or otherwise
shall be allowed.

28. Submission of a tender by a tenderer implies that he has read this notice and all other contract documents and has
made himself of the scope and specifications of the work to be done and of the conditions and rates at which stores,
tools, plant etc. will be issued to him by the Corporation and local conditions and other factors bearing on the
execution of the work.

29. a) All rates shall be quoted on the tender form and shall include all materials, Labour, Transportation, all
taxes,(Excluding GST) duties, testing, commissioning, supervision, tools, plants, wastage, sundries, scaffoldings
as required mobilization, demobilization, transportation etc. and nothing extra shall be payable on any account.
However, shall not include the GST and GST Cess (if applicable) herein after termed as GST and also shall
not include ESI/EPF which is reimbursed separately.
b) GST or any other tax on materials in respect of this contract shall be payable by the contractor and the
corporation will not entertain any claim whatsoever in this respect.

30. The rates quoted by the tenderer shall be exclusive of GST and employer’s ESI/ EPF Contribution. Supplier shall
submit to ITDC the GST complaint tax invoice/debit note/ revised tax invoice. GST charged in the tax invoice /
debit note / revised tax invoice by the supplier shall be released separately to the supplier only after supplier files the
outward supply details in GSTR-1 on GSTN portal and Reconciliation of Inward supply is done by ITDC with
corresponding details of outward supply of supplier and supplier accept the changes made by ITDC and has paid the
GST either in case or by way of adjustment of input tax credit at the time of filling the monthly return. ESI/EPF
shall be reimbursed separately (wherever applicable) after receiving claim by the contractor duly supported with
ESI/EPF deposit challans in respect of associated manpower.

31. The contractor shall be solely responsible for complying with all the provision of EPF, Misc. Provisions Act 1952
and ESI Act relating to manpower engaged for this contract and in the event of any liability on ITDC by virtue of its
being principle employer. Due to failure of the contractor to comply with the said Acts, the contractor shall
indemnity and reimburses the amount payable by ITDC on this Account.

32. As per law of land, statuary deduction like income tax / TDS under GST (as & when applicable) etc shall be made
from the contractor’s bill as applicable.

33. The rates of the contractor shall be inclusive of labour cess at the rate of 1% or as applicable and necessary recovery
of labour cess shall be made from each RA bill by the ITDC to be deposited with labour board of concern state in
case the labour ids not established in the state, recovery made by ITDC on account of labour cess shall be retained
under suspense head and will be deposited with the labour board at the later date as and when the labour board is
established in the state.

34. The vender ensures to pass the benefits accrued due to the GST to the ITDC which ultimately is to be passed to the
final consumer. In contingency of any legal proceedings/ action taken by tax authorities for non compliance of anti
profiteering clause by the vendor. The vendor indemnifies the ITDC from any losses monetary or otherwise suffered
on account of non compliance of anti profiteering clause by the vendor.

35. The vendor shall indemnify the ITDC from any direct or indirect losses suffered by the ITDC due to non compliance
on part of vendor under GST Act, which adversely effects the GSTN rating of ITDC.

36. In case of any non-compliance by the vendor which results in to loss of input tax credit under GST law to ITDC, the
vendor shall pay ITDC an amount equal to lost input tax credit along with interest/penalties or any other monetary
loss suffered because of such non compliance under GST Act.

37. Further Vendor indemnifies the ITDC against any loss monetary or otherwise arising due to legal proceedings
initiated by the tax authorities against ITDC as a result of noncompliance/default in paying tax by Vendor, Vender
shall indemnify ITDC in respect of the recourse action in case of “BLACK LISTING” under the “Compliance
Rating Score” mechanism due to non compliance/default by vendor.

38. In case of any new tax/levy/duty etc becomes applicable after the date of bidder’s offer but before opening of the
price bid, the Bidder/contractor must convey its impact on his price duly substantiated by documentary evidence in
support of the same before opening of price bid. Claim for any such impact after opening the Price Bid will not be
considered by ITDC for reimbursement of tax or reassessment of offer.
39. The tender for the works shall not be witnessed by a contractor or contractors who himself/themselves has/have
tendered or who may and has/have tendered for the same works. Failure to observe this condition shall render the
tender of the contractor tendering as well as of those witnessing the tender liable to rejection.

40. On acceptance of tender, the earnest money will be treated as part of the Security.
41. The India Tourism Development Corporation will return the earnest money, where applicable to every unsuccessful
tenderer on production by the tenderer of a certificate of the Architect / Project Engineer that all tender documents
have been returned.

42. The General Terms & Conditions of Contract or any special condition of the contracts attached with tender will
form integral part of the contract. The tenderers are required to sign each and every document along with tender
documents digitally signed as token of acceptance.
43. A tenderer shall submit the tender which satisfies each and every condition laid down in this notice, failing which
the tender will be liable to be rejected.

44. The India Tourism Development Corporation do not bind themselves accept the lowest or any tender or to give any
reasons for their decisions
45. The India Tourism Development Corporation reserve to themselves the right of accepting the whole or any part of
the tender and tenderer shall be bound to perform the same at his quoted rates.

46. The validity of the tender(s) shall be up to 90 (Ninety) days from the date of opening of tender.

47. “In case, it is found during the evaluation or at any time before signing of the contract or after its execution and
during the period of subsistence thereof, that one or more of the eligibility conditions have not been met by the
applicant or the applicant has made material misrepresentation or has given any materially incorrect or false
information, the applicant shall be disqualified forth with, if not yet, appointed as the contractor/supplier and if the
applicant has already issued the LOA or has entered into the contract, as the case may be, same shall not
withstanding anything to the contrary contained therein liable to be terminated along with forfeiture of Earnest
Money Deposit (EMD)/ Performance Security by a Communication in writing by the Corporation to the Applicant,
without the Corporation being liable In any manner whatsoever to the applicant and Without prejudice to any other
right or remedy which the Corporation may have with initiation of any appropriate panel action as per the applicable
law

48. Low rated and high rated items would be identified while awarding the contract with immediate effect further. For
abnormally high rated items, the running account payments in respect of such items would be restricted to estimated
rates/justified rates plus or minus the percentage quoted above or below the overall estimate/justified cost. The rates
so restricted would only be released after 90% work in respect of abnormally low rate items are executed by the
vendor.

49. This notice of tender shall form part of the contract document.

50. Registration of contractors with EPF & ESI authorities shall be mandatory. However, such requirement shall not be
insisted upon from the contractors where the value of tender is below Rs. 10.00 Lacs.

51. All corrigendum/extension regarding the tender shall be published on the above mentioned websites only.

52. The tenderer whose tender is accepted, shall permit the corporation at time of making any payment to him for work
done under the contract to deduct towards security deposit such sum as will along with the amount of earnest money
already deposit to 10% of the gross amount of the bill till the sums so deducted amount to Rs. 5 lacs.

53. The Intending tenderers are advised to visit the I.T.D.C. website:-www.theashokgroup.com
https://etenders.gov.in/eprocure/app regularly till closing date of submission of tender for any corrigendum /
addendum /amendment. The quoted item should strictly comply with our requirement given in the tender document.
Incomplete/conditional offer or tender without EMD will be rejected out rightly. The tender completed in all respect
must be applied online before the last date and time of tender submission. The Techno Commercial Bid will be
opened on the scheduled date and time of opening online bids. Financial Bids of only technically qualified tenders
shall be opened at a later date which will be intimated to only technically qualified bidders. The Management
reserves the right to accept/reject any of all bids in part or all without assigning any reason thereof.

Signature: ______________________________
Designation: Sr. Mgr. (E&M)
Unit: Hotel Samrat, New Delhi.
Dated. 16-02-2019
ANNEXTURE-I
INSTRUCTIONS FOR SUBMITING E-TENDERS
The bidders are required to submit soft copies of their bids electronically on the CPP Portal, using valid Digital
Signature Certificates. The instructions given below are meant to assist the bidders in registering on the CPP Portal,
prepare their bids in accordance with the requirement and submitting their bids online on the CPP Portals. More
information useful for submitting online bids on the CPP portal may be obtained at:
https://etenders.gov.in/eprocure/app.

Registration
1) Bidders are required to enroll on the e-Procurement module of the central Public Procurement Portal (URL: https:
//etenders.gov.in/eprocure/app.) by clicking on the link “Online bidder Enrollment” on the CPP Portal which is free
of charge.
2) As part of the enrolment process, the bidders will be required to choose a unique username and assign a password
for their accounts.
3) Bidders are advised to register their valid email address and mobile numbers as part of the registration process.
These would be used for any communication from the CPP Portal.
4) Upon enrolment, the bidders will be required to register their valid Digital Signature Certificate (Class III Certificate
with signing key usage) issued by any Certificate Authority recognize by CCA India (e.g. Sify/ n-Code / e-Mudhra
etc.), with their profile.
5) Only one valid DSC should be registered by a bidders are responsible to ensure that they do not lend their DSC’s to
other which may lead to misuse.
6) Bidder then logs in to the site through the secured log-in by entering their user ID/ password of the DSC/e-Token.

SEARCHING FOR TENDER DOCUMENTS


1) There are various search options built in the CPP Portal, to facilitate bidders to search active tenders by several
parameters. These parameters could include Tender ID, Organization Name, Location, Date, Value, etc. There is
also an option of advanced search for tenders, wherein the bidders may combine a number of search parameters such
as Organization Name, Form of Contract, Location, Date, Other Keywords etc. to search for a tender published on
CPP Portal.
2) Once the bidders have selected the tenders they are interested in, they may download the required documents/ tender
schedules. These tenders can be moved to the respective ‘My Tenders’ folder. This would enable the CPP Portal to
intimate the bidders through SMS / e-mail in case there is any corrigendum issued to the tender document.
3) The bidder should make a note of the unique Tender ID assigned to each tender, in case they want to obtain any
clarification / help from the Helpdesk.
4) The bidder requires minimum system requirement for e-tendering as given below-

COMPUTER/LAPTOP SYSTEM REQUIREMENT


 A computer system with at least 1GB RAM and internet connectivity.
 Internet Explorer 7.0 or Mozilla Firefox 3.0 or above. Internet connectivity with at least 2 MBPS Speed.
 Java Run Time Engine (JRE-1.7.0) or higher.
 Valid Class III digital signature certificate with encryption.

PREPRATION OF BIDS
1) Bidder should take into account any corrigendum published on the tender document before submitting their bids.
2) Please go through the tender advertisement and the tender document carefully to understand the document required
to be submitted as part of the bid. Please note the number of covers in which the bid documents have to be
submitted, the number of document - including the names of content of each of the document that need to be
submitted. Any deviations from these may lead to rejection of the bid.
3) Bidders, in advance, should get ready the bid document to be submitted as indicated in the tender document /
schedule and generally, they can be in PDF / XLS / RAR / DWF / JPG formats. Bid documents may be scanned with
100 dpi with black and white option which helps in reducing size of the scanned document.
4) To avoid the time and effort required in uploading the same set of standard documents which required to be
submitted as a part of every bid, a provision of uploading such standard documents (e.g. PAN card copy, annual
reports, auditor certificates etc.) has been provided to the bidders. Bidders can use “MY Space” or “Other Important
Documents” area available to them to upload such documents. These documents may be directly submitted from
the “My Space” area while submitting a bid, and not be uploaded again and again. This will lead to a reduction in
the time requires for bid submission process.

SUBMISSION OF BIDS
1) Bidders should log into the site well in advance for bid submission so that they can upload the bid in time i.e. on or
before the bid submission time. Bidder will be responsible for any delay due to other issues.
2) The bidders has to digitally sign and upload the required bid documents one by one as indicated in the tender
document.
3) Bidder has to select the payment option as “offline” to pay the tender fee / EMD as applicable and enter details of
the instrument.
4) Bidders should prepare the EMD as per the instructions specified in the tender document. The original should be
posted/couriered/given in person to the concerned official, latest by the last date of bid submission or as specified in
the tender document. The details of the DD/any-Other accepted instrument, physically sent, should tally with the
details available in the scanned copy and the data entered during bid submission time. Otherwise the uploaded bid
will be rejected.
5) Bidders are requested to note that they should necessarily their financial bids in the format provided and no other
format is acceptable. If the price bid has been given as a standard BOQ format with the tender document, then the
same is to be downloaded and to be filled by all the bidders. Bidders are required to download the BOQ file, open it
and complete the white colored (unprotected) cells with their respective financial quotes and other details (such as
name of the bidder). No other cells should be changed. Once the details have been completed, the bidders should
save it and submitted it online, without changing the filename. If the BOQ file is found to be modified by the bidder,
the bid will be rejected.
6) The server time (which is displayed on the bidders’ dashboard) will be considers as the standers time for referencing
the deadlines for submission of the bids by the bidders, opening of bids etc. The bidders should follow this time
during bid submission.

7) All the documents being submitted by the bidders would be encrypted suing PKI encryption techniques to ensure the
secrecy of the data. The data entered cannot be viewed by unauthorized persons until the time of bid opening. The
confidentially of the bids is maintained using the secured Socket Layer 128 bit encryption technology. Data storage
encryption of sensitive files is done. Any bid document that is uploaded to the server is subjected to symmetric
encryption using a system generated symmetric key. Further this key is subjected to asymmetric encryption using
buyers/bid opener’s public keys. Overall, the uploaded tender documents become readable only after the tender
opening by the authorized bid openers. The uploaded tender documents become readable only after the tender
opening by the authorized bid openers.
8) Upon the successful and timely submission of bids (i.e. after Clicking “Freeze Bid Submission” in the Portal), the
portal will give a successful bid submission message & a bid summary will be displayed with the bid no. and the
date & time of submission of the bid with all other relevant details.
9) The bid summary has to be printed and kept as an acknowledgement of the submission of the bid. This
acknowledgement may be used as an entry pass for any bid opening meetings.

ASSISTANCE TO BIDDERS
1) Any queries relating to the tender document and the terms and conditions contained therein should be addresses to
the Tender Inviting Authority for a tender or the relevant contact person indicated in the tender.
2) Any queries relating to the process of online bid submission or queries relating to CPP Portal in general may be
directed to the 24x7 CPP Portal Helpdesk.
Format of Annual Turnover as per the Audited Accounts

S.No Financial Year Turnover (INR)

1
2015-16
2
2016-17
3
2017-18
4
Average Turnover of above three years

(Signature of Authorized Signatory)

This is to certify that the above information has been examined by us on the basis of relevant documents, books of
accounts & other relevant information and the information submitted above is as per our record.

(Signature of Authorized Signatory)

Seal of Agency
General Conditions of Contract
And Standard Contract Forms
For Engineering
And Architectural Works

Interpretation and
Definitions

Singular and Plural Agreement getting out the Architect(s)/Consultant(s)


responsibilities and terms.
1. Where the context so requires, words (g.3) "Clerk of Works" shall mean the engineer
importing the singular only also include the plural and appointed at the Works by the Accepting Authority to
vice versa. represent the Architect(s).
Headings and Marginal Notes to Conditions h) “Excepted Risks” are risks due to riots (otherwise
2. Headings and marginal notes to these General than among Contractor's employees) and civil
Conditions shall not be deemed to form part thereof or commotion (in so far as both these are uninsurable), war
be taken into consideration in the interpretation or (whether declared or not), invasion, act of foreign
construction thereof or of the Contract. enemies, hostilities, civil war, rebellion, revolution,
Definitions insurrection, military or usurped power, any acts of
3. (a) “Corporation” shall mean the India Tourism Government, damage from aircraft, acts of God, such as
Development Corporation having its registered office at earthquake, lightning and unprecedented floods and
Scope Complex 6th floor Core 8 Lodi Road New Delhi- other causes over which the Contractor has no control
110003, in the State of Delhi and includes a duly and accepted as such by the Accepting Authority or
authorized representative of the Corporation or any causes solely due to use or occupation by the
other person empowered in this behalf by the Corporation’s of the part of Works in respect of which a
Corporation to discharge all or any of its functions. certificate of completion has been issued or cause solely
(b) The “Accepting Authority” shall mean the Chief due to Corporation's faulty design of Works.
Engineer or his nominee on behalf of the India Tourism
Development Corporation. i) "Market Rate" shall be the rate as decided by the
(c) The “Contract “shall mean the notice inviting the Project Engineer on the basis of the cost of materials
tender, the tender and acceptance thereof and the formal inclusive of any taxes, octroi or such statutory
agreement, if any, executed between the India Tourism imposition, at the time of work, and cost of labour at the
Development Corporation Unit: Ashok Hotel and the site where the work is to be executed plus the
Contractor together with the documents referred to percentage mentioned in Schedule “F” to cover all
therein including these conditions with appendices and overheads, supervision and profit.
any special conditions, the specifications, designs,
drawings, schedule of quantities with rates and amounts j) Schedule(s) referred to in these conditions shall mean
and schedule of rates. All these documents taken the standard schedule of rates prescribed by the India
together shall be deemed to form one Contract and shall Tourism Developmen1 Corporation and the
be complementary to one another. amendments thereto issued from time to time.
(d) The “Contractor” shall mean the individual or firm k) The "Site" shall mean the lands and/or other places
or company whether incorporated or not, undertaking on, under, in or through which the work is to be
the works and shall include legal representatives of such executed under the Contract including any other lands
individuals or persons composing such firm or or places which may be allotted by the Corporation or
unincorporated company, or successors of such firm or used for the purposes of the Contract.
company as the case may be and permitted assigns of l) “Temporary Works" shall mean all temporary works
such individual or firm or company. of every kind required in or about execution,
(e) The “Contract Sum” shall mean: in the case of Item completion or maintenance of the works.
Rate Contracts the cost of the work arrived at after m) "Urgent Works" shall mean any urgent measures
extension of the quantities shown in Schedule of which in the opinion of the Project Engineer become
Quantities by the item rates quoted by the tenderer for necessary during the progress of the works to obviate
the various items. any risk of accident or which become necessary for
(f) A “Day” shall mean a day of 24 hours from midnight security.
to midnight irrespective of the number of hours worked
in that day. n) A "Week” shall mean seven days without regard to
the number of hours worked in any day in that week.
(g.1) “Project Engineer”/“Assistant Engineer” shall
mean the Engineering Officer appointed by the India o) The "Works" shall mean the works to be executed in
Tourism Development Corporation, who shall direct accordance with the Contract or part(s) thereof as the
supervise and be in charge of the works for purposes of case may be and shall include all extra or additional,
this contract, and maintain liaison with the architect(s). altered or substituted works or temporary and urgent
works as required for performance of the Contract.
(g. 2) "Architect(s)/ Consultant(s)" shall mean the Scope and Performance
person/persons practicing as such and duly appointed by
the Accepting Authority for the Works under a separate Contract Documents
4. The Contractor shall be furnished, free of charge; one (a) Description in Schedule of Quantities
certified true copy of the contract Document and of all (b) Particular Specification and Special Conditions, If
further drawings, which may be issued during the any
progress of the works. (c) Drawings
4.1None of these documents shall be used by the (d) General Specifications
Contractor for any purposes other than that of this 8.2 If there are varying or conflicting provisions made
Contract. in anyone document forming part of the Contract, the
Accepting Authority shall be the deciding authority
Works to be carried out with regard to the intention of the document.
5. The work to be carried out under the contract shall, 8.3 Any error in description, quantity or rate in
except as otherwise provided in these conditions, Schedule of Quantities or any omission there from shall
include all labour, materials, tools, plant, equipment, not vitiate the Contract or release the Contractor from
and transport which may be required in preparation of the execution of the whole or any part of the Works
and for and in the full and entire execution and Comprised therein according to drawings specifications
completion of the works. The descriptions given in the or from any of his obligations under the Contract.
Schedule of Quantities shall, unless otherwise stated, be 8.4 If on check there are found to be differences
held to include wastage on materials, carriage and between the rates given by the Contractor in Words and
cartage and return of empties, hoisting, setting, fitting figures or in the amount worked out by him in the
and fixing in position and all other labour necessary in Schedule of Quantities and General Summary, the same
and for the full and entire execution and completion as shall be adjusted in accordance with the following
aforesaid in accordance with good practice and rules:-
recognized principles. a) In the event of a discrepancy between description in
words and figures quoted by a tenderer, the rate which
Inspection of Site corresponds to the amount worked out by the
6. The Contractor shall inspect and examine the Site Contractor shall be taken as correct. When the amount
and its surroundings and shall satisfy himself before of an item is not worked out by the Contractor or it does
submitting his tender as to the nature of the ground and not correspond to the rate written either in figures or in
subsoil (so far as is practicable), the form and nature of words, the rate quoted by the contractor in WORDS
the Site, the quantities and nature of work and materials shall be taken as correct.
necessary for the (completion of the works and means b) In the event of an error occurring in the amount
of access to the site, the accommodation he may require column of Schedule of Quantities as a result of wrong
and in general shall himself obtain all necessary) extension of the unit rate and quantity the UNIT RATE
information as to risks, contingencies and other shall be regarded as firm and extension shall be
circumstances which may influence or affect his tender. amended on the basis of the rate.
No extra charges consequent on any misunderstanding c) AII errors in totaling in the amount column and
or otherwise shall be allowed. carrying forward totals shall be corrected.

Sufficiency of Tender d) The totals of various sections of Schedule of


7. The Contractor shall be deemed to have satisfied Quantities as amended shall be carried over to the
himself before tendering as to the correctness and General Summary and the tendered sum amended
sufficiency of his tender for the Works and of the rates accordingly. The tendered sum so altered shall, for the
and prices quoted in the Schedule of Quantities, which purpose of the tender, be substituted for the sum
rates and prices shall, except as otherwise provided, originally tendered and considered for acceptance
cover all his obligations under the Contract and all instead of the original sum quoted by the tenderer. Any
matters things necessary for the proper completion and rounding off of totals in various sections of Schedule of
maintenance of the works. Quantities or in General Summary by the tenderer shall
be ignored.
Discrepancies and Adjustment of Errors Security Deposit
8. The several documents forming the Contract are to 9. (a) The Contractor shall permit the Corporation at the
be taken as mutually explanatory of one another, time of making any payment to him for work done
detailed drawings being followed in preference to under the Contract to deduct such sums as will along
small-scale drawings and figured dimensions in with the amount of the EMD deposited amount to 10
preference to scale and Special Conditions in preference per cent of the gross amount of the bill till the Sums
to General Conditions. deducted amount to maximum of Rs.5.00 Lac.
8.1In the case of discrepancy between Schedule of 9.(b) When the Security Deposit reaches a limit of Rs.1,
Quantities, the Specifications and/or the Drawings, the 00,000/- the Contractor if so desires may convert the
following order of preference shall be observed:- amount into Bank Guarantee from any scheduled bank.
The validity of this Bank Guarantee shall extend up to be paid there for shall be resolved in accordance with
the expiry of the Defects Liability Period. This shall Condition 49.
further be subject to the condition that at least one
fourth of the total Security Deposit shall remain in cash 10.1 The time for completion of the Works shall, in the
from until the expiry of Defects Liability Period. event of any deviations resulting in additional Cost over
9. (c) All compensation or other sums of money payable the Contract Sum being ordered be extended as follows
by the Contractor under the terms of this Contract or if requested by the Contractor:
any other Contract or any other account whatsoever
may be deducted from or paid by the sale of a sufficient (a) In the proportion which the additional cost of the
part of his security deposit or from the interest arising altered, additional or substituted work, bears to the
there from or from any sum which may be due or original Contract Sum; plus
become due to the Contractor by the Corporation on any (b) 25% of the time calculated in (a) above or such
account whatsoever and In the event of his security further additional time as may be considered reasonable
deposit being reduced by reasons of any deduction or by the Project Engineer.
sale as aforesaid, the Contractor shall within fourteen Extra Items
days of receipt of notice of demand from the Project 11.a) The rates of all authorized extra items or
Engineer make good the deficit. additional, altered or substituted work, shall be worked
9. (d) Refund of Security Deposit - One half of the out as follows:-
Security deposit refundable to the Contractor worked (i)If the rate for additional, altered or substituted item of
out on the basis of the value of work completed shall be work is specified in the Schedule of Quantities, the
refunded to the Contractor on the Architects' and/or Contractor shall carry out the additional, altered or
Project Engineer certifying in writing that the work has substituted item at the same rate. In the case of
been completed as per Conditions 28.1 hereof. composite tenders, where two or more schedules of
9. (e) On expiry of the Defects Liability Period the Quantities may form part of the Contract the applicable
Architects and/or Project Engineer, on demand from the rate shall be taken from the schedule of Quantities of
Contractor, refund to him the remaining portion of that particular part in which the deviation is involved,
security deposit provided the Project Engineer is failing that at the lowest applicable rate for the same
satisfied that there is no demand outstanding against the item of work in the other schedule of quantities.
Contractor. (ii) If the rate for any altered, additional or substituted
item of work is not specified in the Schedule of
Deviations/Variations Extent and Pricing Quantities, the rate for that item shall be derived from
10. The Architects and/or Project Engineer shall the rate for the nearest similar item specified therein. In
have power (i) to make alterations in, omissions from, case of composite tenders where two or more schedule
additions to, or substitutions for, the original of quantities form part of the contract, the rate shall be
specifications, drawings, designs and instructions that derived from the nearest similar item in the Bills of
may appear to him to be necessary or advisable during Quantities of the particular part of Works in which the
the progress of the work, and (ii) to omit part of the deviation is involved, failing that from the lowest of the
Works in case of non-availability of a portion of the nearest similar items in other schedule of quantities.
Site or for any other reason, and the Contractor shall be
bound to carry out the Works in accordance with any (iii) If the rate for any additional, altered or substituted
instructions given to him in writing signed by the item of work cannot be determined in the manner
Project Engineer and such alterations, omissions, specified in sub-paras (i) and (ii) above, then such item
additions or substitutions shall form part of the Contract of Work shall be carried out at the rate entered in the
as if originally provided therein and any altered, Latest CPWD Schedule of Rates PLUS OR MINUS the
additional or substituted work which the Contractor percentage by which the tendered amount of the Works
may be directed to do in the manner above specified as actually awarded is higher or lower than the estimated
part of the Works, shall be carried out by the Contractor amount of the Works actually awarded.
on the same conditions in all respects including price on
which he agreed to do the main work except as iv) Where the rates cannot be derived in the manner of
hereinafter provided. No work which radically changes (i) to (iii) above, the same shall be worked out on the
the original nature of the Contract shall be ordered by basis of Market Rates or actual expenditure incurred in
the Architect'/ Project Engineer as a deviation and in the the execution of the item inclusive of any taxes, octroi.
event of any deviation being ordered which in the etc., plus 15% Contractor's profit, overheads and
opinion of the Contractor changes the original nature of supervision charges.
the Contract, he shall nevertheless carry it out and the
disagreement as to the nature of the work and the rate to b) The Contractor shall, within 14 days of the date of
receipt of an order to carry out the above work, or
within 14 days after having carried out the above work.
Submit the rates, which he proposes to claim for such (g) Non-availability or breakdown of Tools and Plant to
items of work, supported by rate analysis and vouchers. be supplied or supplied by the Corporation or
The Architect / Project Engineer shall communicate to
the Contractor the rates admissible for these items. (h) Any other cause which in the absolute discretion of
the authority is beyond the Contractor’s control.
Suspension of Works
12. a) The Contractor shall, on receipt of the order in then upon the happening of any such event causing
writing of the Project Engineer, suspend the progress of delay, the contractor shall immediately give notice
the Works or any part thereof for such time in such a thereof in writing to the Project Engineer but shall
manner as the Project Engineer may consider necessary nevertheless use constantly his best endeavors to
for any of the following reasons: - prevent or make good the delay and shall do all that
i) On account of any default on part of the Contractor; may be reasonably required to the satisfaction of the
or Project Engineer to proceed with the works.
ii) For proper execution of the Works or part thereof for 13.3 Request for extension of time to be eligible for
reasons other than the default of the Contractor; or consideration shall be made by the Contractor in writing
iii) For safety of the Works or part thereof. as per 28.3 within fourteen days of happening of the
event causing delay. The Contractor may also, If
The Contractor shall during such suspension, properly practicable, indicate in such a request the period for
protect and secure the Works to the extent necessary which extension is desired.
and carry out the instructions given in that behalf by the 13.4 In any such case the authority mentioned in
Project Engineer. Schedule “F” may give a fair and reasonable extension
of time for completion of the work. Such extension
12. b) If the suspension is ordered for reasons (ii) and shall be communicated to the Contractor by the
(iii) in sub-para a) above: Architect/Project Engineer in writing, within 3 months
of the date of receipt of such request by the Project
(i) The Contractor shall be entitled to an extension of Engineer/Architect.
time equal to the period of every such suspension PLUS Plant and Equipment
25%. 14. The Contractor shall arrange at his own expense all
Time and Extension for Delay tools, plants and equipments required for the execution
13. The time allowed for execution of the works or of the work, in such numbers or quantity as to meet the
the extended time in accordance with these conditions time of completion specified.
shall be the essence of the Contract. The work shall Materials to be provided by the Contractor
commence from the 7th day after the date of work order 15. (a)The Contractor shall. at his own expense,
issued by the Architect/Project Engineer, or from the provide all materials required for the Works other than
date of handing over of the site whichever is later. If the those, which are to be supplied by the Corporation.
Contractor commits default in commencing the work as 15. (a) 1. All materials to be provided by the
aforesaid, the corporation shall without prejudice to any Contractor shall be in conformity with the specifications
other right or remedy be at liberty to forfeit the earnest laid down in the Contract and the Contractor shall, if
money absolutely. requested by the Project Engineer furnish proof to the
13.1 The Contractor shall agree upon a time and satisfaction of the Project Engineer that the materials so
progress charts or PERT/CPM Chart ensuring good comply.
progress accordingly. 15. (a) 2. The Contractor shall, at his own expense
13.2 If the works be delayed by: and without delay, supply to the Project Engineer
(a) Force majeure, or samples of materials proposed to be used in the Works.
If samples are not approved, the Contractor shall
(b) Abnormally bad weather or forthwith arrange to supply to the Project Engineer for
his approval fresh samples complying with the
(c) Serious loss or damage by fire or specifications laid in the Contract.
(d) Civil commotion, local combination of workmen, 15. (a) 3. The Project Engineer shall have full powers
strike or lockout, affecting any of the trades employed to require removal of any or all of the materials brought
on the work or to Site by the Contractor which are not in accordance
(e) Delay on the part of other contractors or tradesmen with the Contract specifications or do not conform in
engaged by the Corporation in executing work not character or quality to samples approved by him. In
forming part of the Contract or case of default on the part of the Contractor in removing
(f) Non-availability of stores which are the rejected materials the Project Engineer shall be at
responsibility of the Corporation to supply or liberty to have them removed by other means. The
Project Engineer shall have full powers to procure other 15. (b)4. Surplus materials returned by the Contractor
proper materials to be substituted for rejected materials shall be credited to him by the Project Engineer rates
and in the event of the Contractor refusing to comply, not exceeding those at which these were originally
he may cause the same to be supplied by other issued to him after taking into consideration any
means. All costs, which may attend upon such removal deterioration or damage which may have been caused,
and/or substitution, shall be borne by the Contractor. to the said materials whilst in the custody of the
15. (a) 4. Subject as hereinafter provided in Contractor.
Condition 47 all charges on account of octroi, terminal
or sales tax and other duties on materials obtained for 15. (b)5. If on completion of Works the Contractor fails,
the Works from any source (excluding materials to return surplus materials out of those supplied by the
supplied by the Corporation) shall be borne by the Corporation, then in addition to any other liability
Contractor. which the Contractor would incur, the Project Engineer
15. (a) 5. The Project Engineer shall be entitled to may, by a written notice to the Contractor, require him
have tests carried out as specified in the Contract for to pay within a fortnight of receipt of the notice, for
any materials supplied by the Contractor other than such unreturned surplus materials at double the issue
those for which, as stated above, satisfactory proof has rates.
already been furnished at the cost of the Contractor and
the Contractor shall provide at his expense all facilities 15. (b) 6. If cement is to be supplied by the Corporation,
which Project Engineer may require for the purpose. If every cement go down shall be provided with two locks
no tests are specified in the Contract, and such tests are on each door. The key of one lock at each door shall
required by the Project Engineer, the Contractor shall remain with the Project Engineer or his representative
provide all facilities required for the purpose and the and that of the other lock with the Contractor's
charges for these tests shall be borne by the Contractor authorized agent at Site of Works so that cement is
only, if the tests disclose that the said materials are not removed from the go down only according to daily
in accordance with the provision of the Contract. The requirements with the knowledge of both the parties.
cost of materials consumed in tests shall be borne by the General
Contractor in all cases except when otherwise provided. 15. (c) Materials required for the Works, whether
Materials to be supplied by the Corporation brought by the Contractor or supplied by the
15. (b) Materials to be supplied by the Corporation are Corporation, shall be stored by the Contractor only at
shown in Schedule “B” which also stipulates quantum, places approved by the Project Engineer, storage and
place of issue and rate(s) to be charged in respect safe custody of materials shall be the responsibility of
thereof. the Contractor.
15. (b)1. If after acceptance of the tender the Contractor
desires the Corporation to supply any other materials, 15. (c) 1. Corporation's officials concerned with the
such materials may be supplied by the Corporation, if Contract shall be entitled at any time to inspect and
available, at rates to be fixed by the Accepting examine any materials intended to be used in or on the
Authority. works, either on the Site or at factory or workshop or
15. (b)2. The Contractor shall bear the cost of loading, other place(s) where such materials are
transporting to Site, unloading, storing under cover as assembled/fabricated/ manufactured or at any place(s)
required, assembling and joining the several parts where these are lying or from which these are being
together as necessary and incorporating or fixing obtained and the Contractor shall give such facilities as
materials in the Works including all preparatory work may be required for such inspection and examination.
of whatever description as may be required. 15. (c) 2. All materials brought to the Site shall become
15. (b)3. All materials issued to the contractor by the & remains property of Corporation and shall not be
Corporation for incorporation or fixing in the Works removed off the Site without the prior written approval
(including preparatory work) shall, on completion or on of the Project Engineer. But, whenever the works are
foreclosure of the works. Be returned by the Contractor finally completed and advance, if any, in respect of any
at his expense, at the place of issue, after making due such material is fully recovered. The contractor, shall at
allowance for actual consumption, reasonable wear and his own expense, forthwith remove from the Site all
tear and/or waste. The decision of the Engineer in this surplus materials originally supplied by him and upon
regard is final and binding. If the Contactor is required such removal, the same shall reset in & become
to deliver such materials at a place other than the place property of the Contractor.
of issue, he shall do so and the transportation charges Labour
which would have been incurred by the Contractor had 16. The Contractor shall employ labour in sufficient
such materials been deliver at the place of issue, shall numbers either directly or through sub-contractors,
be borne by the Corporation. where such subletting is permitted, to maintain the
required rate of progress and of quality to ensure
workmanship of the degree specified in the Contract not be changed. Where necessary, such trees shall be
and to the satisfaction of the Project Engineer. The protected by providing temporary fencing.
Contractor shall not employ in connection with the Watching and lighting
Works any person who has not completed his fifteenth 22. The Contractor shall provide and maintain at his
year of age. own expense all lights, guards, fencing and watching
16.1 The Contractor shall comply with the provisions of when and where necessary or required by the Project
the Payment of Wages Act, 1936, Minimum Wages Engineer for the protection of the Works or for the
Act, 1948, Employers’ Liability Act, 1938, Workmen's safety and convenience of those employed on the works
Compensation Act. 1923. Industrial Disputes Act, 1947, or the public.
Maternity Benefit Act, 1961 and Mines Act, 1952, The Contractor's Supervision
Employees State Insurance Act, 1948, Safety Code and 23. The Contractor shall either himself supervise the
Labour Welfare Acts, or rules, or any modifications execution of the Works or shall appoint qualified
thereof or any other law relating thereto & rules made Engineer approved by the Architect and /or Project
there under from time to time. Engineer to act in his stead. If the Contractor fails to
16.2 The Contractor shall indemnify the Corporation appoint a suitable agent as directed by the Engineer-in-
against any payments to be made under and for Charge, the Engineer-in-Charge shall have full powers
observance of the Regulations aforesaid without to suspend the execution of the Works until such date as
prejudice to his right to claim indemnity from his sub- a suitable agent is appointed and the Contractor shall be
contractors. held responsible for the delay so caused to the works.
Setting out the Works Inspection and Approval
17. The Contractor shall provide all labour and setting 24. All works embracing more than one process shall
out apparatus required and set out the works and be be subject to examination and approval at each stage
responsible for the accuracy of the same. He shall thereof and the Contractor shall give due notice to the
amend at his own cost any error found at any stage, Architect and/or Project Engineer shall or his
which may arise through inaccurate setting out. authorized representative when each stage is ready. In
Site Drainage default of such notice, the Project Engineer shall be
18. a) All water which may accumulate on the Site entitled to appraise the quality and extent thereof.
during the progress of the Works, or in trenches and 24. 1 No work shall be covered up or put out of view
excavations, from other than the Excepted Risks shall without the approval of the Architect/Project Engineer
be removed from the Site to the satisfaction of the or his authorized representative and the Contractor shall
Project Engineer and at the Contractor's expense. afford full Opportunity for examination and
18. b) Nuisance: The Contractor shall not at any time measurement of any work which is about to be Covered
do, cause or permit any nuisance on the Site or do up or put out of view and for examination of
anything which shall cause unnecessary disturbance or foundations before permanent Work is placed thereon.
inconvenience to owners, tenants or occupiers of other The Contractor shall give due notice to the Project
properties near the Site and to the public generally. Engineer or his authorized representative whenever any
Materials Obtained from Excavation such work or foundation is ready for examination and
19. Materials of any kind obtained from excavation on .the Architect/Project Engineer or his representative
the Site shall remain the property of the Corporation shall, without unreasonable delay, unless he considers it
and shall be disposed of as the Project Engineer may unnecessary and advises the Contractor accordingly,
direct. attend for the purpose of examining and measuring such
Treasure Trove, Fossil, etc work or of examining such foundations. In the event of
20. All fossils, coins, articles of value or antiquity and the failure of the Contractor to give such notice he shall,
structures and other remains or things of geological or if required by the Architect/Project Engineer, uncover
archaeological interest discovered on the Site shall be such work at the Contractor's expense.
the absolute property of the Corporation and the 24. 2 Departmental officers concerned with the Contract
Contractor shall take reasonable precautions to prevent shall have powers at any time to inspect & examine any
his workman or any other person from removing or part of Works and the Contractor shall give such
damaging any such article or thing and shall facilities as may be required for such inspection and
immediately upon discovery thereof and before removal examination.
acquaint the Project Engineer with such discovery and Removal of Workmen
carry out the Project Engineer’s directions as to the 25. The Contractor shall employ in and about the
disposal of the same at the expense of the Corporation. execution of the works only such persons as are skilled
Protection of Trees and experienced in their several trades and the
21. Trees designated by the Project Engineer shall be Architect/Project Engineer shall be at liberty to object
protected from damage during the Course of the Works to and require the Contractor to remove from the Works
and earth level within 1 meter of each such tree shall any person employed by the Contractor in or about the
execution of the Works who in the opinion of the 28. 2 If at any time before completion of the entire
Project Engineer misconduct himself or is incompetent work, items or groups or items for which separate
or negligent in the proper performance of his duties and periods of completion have been specified, have been
such person shall not be again employed upon the completed, the Architect/Project Engineer, with the
Works without permission of the Architect/Project consent of the Contractor, takes possession of any part
Engineer. or parts of the same (any such part(s) being hereinafter
Uncovering and Making Good in this condition referred to as the relevant part) then
26. The Contractor shall uncover any part of Works notwithstanding anything expressed or implied
and/or make openings in or through the same as the elsewhere in this Contract:
Project Engineer may from time to time direct for his (a) Within thirty days of the date of completion of such
verification and shall reinstate and make good such part items or groups of items or of possession of the relevant
to the satisfaction of the Architect/Project Engineer. If part, the Project Engineer shall issue completion
any such part has been Covered up or put out of view certificate for the relevant part as in Condition 30
after being approved by the Project Engineer and is provided the contractor fulfils his obligations under that
subsequently found on uncovering to be executed in condition for the relevant part.
accordance with the Contract, the expenses of (b) The Defects Liability Period in respect of such
uncovering and /or making openings in or through items and the relevant part shall be deemed to have
reinstating and making good the same shall be borne commenced from the certified date of completion
by the Corporation. In any other case all such expenses of such items or the relevant part as the case may
shall be borne by the Contractor. be.

Work during Night or on Sundays and Holidays (c) For the purposes of ascertaining compensation for
27. Subject to any provisions to the contrary is delay under condition 31 in respect of any period
contained in the Contract, if works have to be carried during which the works are not complete, the
out during night or on Sundays or on authorized relevant part will be deemed to form a separate
holidays, permission in writing of the Project Engineer item or group, with date of completion as given in
shall be obtained except when the work is unavoidable the contract or as extended under condition 13 and
or absolutely necessary for the safety of life, property or actual date of completion as certified by the Project
works in which case the Contractor shall immediately Engineer under this condition.
advise the Project Engineer accordingly. Hindrance Register
28. 3 A Hindrance Register shall be maintained at the
Completion Certificate site of work showing the items affected, the date on
28. 1 As soon as the work is completed, the Contractor which the delay occurred and the date on which the
shall give notice of such completion to the Project delay was cleared. These entries shall be initiated by the
Engineer and within 45 days of receipt of such notice Project Engineer as well as the Contractors authorized
the Project Engineer shall inspect the work and shall representative. The Hindrance register shall also be
furnish the Contractor with a certificate of completion inspected by the Architects during their inspection of
indicating (a) the date of completion, (b) defects to be works and initialled in token thereof. Request for
rectified by the Contractor, and/or (c) items for which extension shall be made as per Performa enclosed in the
payment shall be made at reduced rates, When separate Contract.
periods of completion have been specified for items or Compensation for Delay
groups of items, the Project Engineer shall issue 29. If the Contractor fails to maintain the required
separate completion certificates for such items or progress in terms of Condition 13 or to complete the
groups of items, No certificate of completion shall be work and clear the site on or before the Contract or
issued, nor shall the work be considered to be extended date-period of completion, he shall, without
completed till the Contractor shall have removed from prejudice to any other right or remedy of the
the premises on which the work has been executed all Corporation on account of such breach, pave as agreed
scaffoldings, sheds and surplus materials, except such compensation amount calculated as stipulated below or
as are required for rectification of defects, rubbish and such smaller amount as may be fixed by the authority
all huts and sanitary arrangements required for his mentioned in Schedule “F" on the Contract value of the
workman on the Site in connection with the execution work for every week that the progress remains below
of the work, and cleaned floor, gutters and drains, eased that specified in Conditions 13 and 14 or that the work
doors and sashes, oiled locks and fastenings labeled remains incomplete.
keys clearly and handed them over to the Project This will also apply to items or groups of items for
Engineer or his representative and made the whole which separate period of completion has been specified.
premises fit for immediate occupation or use to the
satisfaction of the Project Engineer.
1% (one percent) of the contract amount subject to
maximum of Rs. 50000 PER WEEK or a 31. 2 Before commencing execution of the work the
part thereof for the first four weeks of delay and Contractor shall without in any way limiting his
subsequent delays for every week or part thereof, obligations and responsibilities under this Condition
amount shall be 2% of the contract amount subject to a insure against any damage loss or injury which may
maximum of Rs. 1 lac per week. The total occur 10 any property (excluding that of the
compensation for delay shall further be subject to an Corporation but including the Corporation’s building
overall maximum of 15% (fifteen percent) of the rented by the Contractor wholly or in a part and any part
contract amount as awarded. The decision of the of which is used by him for storing combustible
competent authority shall be final and binding. materials), or to any person (including any employee of
the Corporation) by or arising out of carrying out of the
29.1 The amount of compensation may be adjusted or Contract.
set off against any sum payable to the contractor under
this or any other contract with the corporation. 31. 3 The Contractor shall at all times indemnify the
Corporation against all claims, damages or
Defects Liability Period compensation under the provisions of Payment of
30. The Contractor shall be responsible to make good Wages Act, 1936, Minimum Wages Act, 1948,
and remedy at his own expense within such period as Employers Liability Act, 1938, Workmen’s
may be stipulated by the Project Engineer any defect Compensation Act, 1923, Industrial Disputes Act, 1947
which may develop or may be noticed before the expiry and the Maternity Benefit Act, 1961, or any
of the period mentioned in Schedule 'F' hereto from the modifications thereof or any other law relating thereto
certified date of completion and intimation of which has and rules made hereunder from time to time or as a
been sent to Contractor within seven days of expiry of consequence or any accident or injury to any workman
said period by a letter sent by hand delivery or by or other persons in or about the Works, whether in the
registered post. employment of the Contractor or not, save and except
30. 1 Buildings. Sanitary works, water supply works, where such accident or injury has resulted from any act
electrical works, plant and machinery, furniture, roads of Corporation, his agents or servants, and also against
and drainage, etc., ONE YEAR from the date of all costs, charges and expenses of any suit, action or
completion. proceedings arising out of such accident or injury and
against all sum or sums which may, with the consent of
Contractor's Liability and Insurance the Contractor, be paid to compromise or compound
31. From commencement to completion of the Works, and claim, Without limiting his obligations and
the Contractor shall take full responsibility for the care liabilities as above provided, the Contractor shall insure
thereof and for taking precautions to prevent loss or against all claims, damages or compensation payable
damage and to minimize loss or damage to the greatest under the Workman's Compensation Act, 1923 or any
extent possible and shall be liable for any damage or modification thereof or any other law relating thereto.
loss that may happen to the Works or any part thereof
and all Corporation's T&P from any cause whatsoever 31. 4 the aforesaid insurance policy / policies shall
(save and except the Excepted Risks) and shall at his provide that they shall not be cancelled till the
own cost repair and make good the same so that at Architect/Project Engineer has agreed to their
completion, the Works and all Corporation's T&P shall cancellation.
be in good order and condition and in conformity in
every respect with the requirements of the Contract and 31. 5 The Contractor shall prove to the Architect/
instructions of the Project Engineer. Project Engineer from time to time that he has taken out
all the insurance policies reference to above and has
31. 1 The Contractor shall indemnify and keep paid the necessary premiums for keeping the policies
indemnified the Corporation against all losses and alive till expiry of the Defect Liability Period.
claims for injuries or damage to any persons or any
property whatsoever which may arise out of or in 31. 6 The Contractor shall ensure that similar
consequence of the construction and maintain of the insurance policies are taken out by the sub-
Works and against all claims demands, proceedings. contractors (if any) and shall be responsible for any
Damages, costs, charges and expenses whatsoever in claims or losses to the
respect of or in relation thereto PROVIDED always that Corporation resulting from their failure to obtain
nothing herein contained shall be deemed to render the adequate insurance protection in connection thereof.
Contractor liable for or in respect of or to indemnify the The Contractor shall produce or cause to be produced,
Corporation against any compensation or damage by his sub-contractors {if any) as the case may be the
caused by the Excepted Risks.
relevant policy or policies and premium receipts as and 35. 1 All instructions, notices and communications, etc.
when required by the Architect/Project Engineer. under the Contract shall be given in writing and if sent
31. 7 If the contractor and or his sub-contractors {if by registered post to the last known place of abode or
any) shall fail to effect and keep in force the insurance business of the Contractor shall be deemed to have been
referred to above or any other insurance which he they served on the date when in the ordinary course of post
may be required to effect under the terms of the these would have been delivered to him.
Contract then and in any such case the Corporation 35. 2 The Contractor or his agent shall be in attendance
may, without being bound to effect and keep in force at the Site(s) during all working hours and shall
any such insurance and pay such premium or premiums superintend the execution of the Works with such
as may be necessary for that purpose and from time to additional assistance in each trade as the
time deduct the amount so paid by the Corporation from Architect/Project Engineer may consider necessary.
any moneys due or which may become due to the Orders given to the Contractor's Agent shall be
Contractor or recover same as a debt due from the considered to have the same force as if they had been
Contractor. given to the Contractor himself.
35. 3 The Project Engineer shall communicate or
Facilities to Other Contractors confirm his instructions to the Contractor in respect of
32. The Contractor shall in accordance with the the execution of work in a “Works Site Order Book”
requirements of the Architect /Project Engineer, afford maintained in the office of the Architect/Project
all reasonable facilities to other contractors engaged Engineer and the Contractor or his authorized
contemporaneously on separate contracts in connection representative shall confirm receipt of such instructions
with the works and for departmental labor and labour of by signing the relevant entries in this book. If required
any other properly authorized authority or statutory by the Contractor, he shall be furnished a certified true
body which may be employed at the Site on execution copy of such instruction(s).
of any work not included in the Contract or of any
contract which the Corporation may enter into in Foreclosure of Contract in Full or in Part due to
connection with or ancillary to the Works. Abandonment or Reduction in Scope of work
36. If at any time after acceptance of the tender the
Notices to local Bodies Corporation shall decide to abandon or reduce the scope
33. The Contractor shall comply with and give all of the Works for any reason whatsoever and hence not
notices required under any Governmental authority, require the whole or any part of the works to be carried
instrument, rule or order made under any Act of out, the Architect/Project Engineer shall give notice in
Parliament, State laws or any regulation or bye-Yaws of writing to that effect to the Contractor and the
any regulation or bye-laws of any local authority Contractor shall have no claim to any payment of
relating to the works. He shall before making any compensation or otherwise whatsoever, on account of
variation from the Contract drawings necessitated by any profit or advantage which he might have derived
such compliance give to the Architect/Project Engineer from execution of Works in full but which he did not
a written notice giving reasons for the proposed derive in consequence of foreclosure of whole or part of
variation and obtain Project Engineer’s instructions the Works.
thereon. 36. 1 The Contractor shall be paid at Contract rates
33. 1 The Contractor shall pay and indemnify the full amount for works executed at Site and, in addition,
Corporation against any liability in respect of any fees a reasonable amount as certified by the Project
or charges payable under any Act of Parliament, State Engineer for the items hereunder mentioned which
laws or any Government instrument rule or order and could not be utilized on the work to the full extent
any regulation or byelaws of local authority in respect because of the foreclosure:
of works.
(a) Any expenditure incurred on preliminary Site
Sub-Contracts work. E.g., temporary access roads, temporary labour
34. The Contractor shall not sublet any portion of the huts, staff quarters and Site office; storage
Contract without the prior written approval of the accommodation and water storage tanks.
Accepting Authority.
Instructions and Notices (b) (i) The Corporation shall have the option to take
35. Subject as otherwise provided in this Contract, over Contractor's materials or any part thereof either
all notices to be given on behalf of the Corporation and brought to Site or of which the Contractor is legally
all other actions to be taken on its behalf may be given bound to accept delivery from suppliers (for
or taken by the Architect Project Engineer or any officer incorporation in or incidental to the work), provided,
for the time being entrusted with the functions, duties however, the Corporation shall be bound to take over
and powers of the Architect/Project Engineer. the materials or such portions thereof as the Contractor
does not desire to retain. For materials taken over or to Contractor and/or surviving partners of the Contractor's
be taken over by the Corporation, cost of such firm liable in damages for not completing the Contract.
materials. The cost shall, however, take into account Cancellation of Contract in Full or in Part
purchase price, cost of transportation and deterioration 38. If the Contractor:
or damage which may have been caused to materials
whilst in the custody of the Contractor. (a) At any time makes default in proceeding with
(b) (ii) For Contractors materials not retained by the Works with due diligence and continues to
the Corporation, reasonable cost of transporting such do so after a notice in writing of 7 days from
materials from Site to Contractor's permanent stores or the Architect/Project Engineer; or
to his other Works, whichever is less. If materials are
not transported to either of the said places, no cost of (b) Commits default in complying with any of the
transportation shall be payable. terms and conditions of the contract and does
not remedy it or take effective steps to remedy
(c) If any material supplied by the Corporation is it within 7 days, after it notice in writing is
required surplus, the same except normal wastage shall given to him in that behalf by the
be returned by the Contractor to the Corporation at rates Architect/Project Engineer; or
not exceeding those at which these were originally
issued less allowance for any deterioration or damage (c) Fails to complete the Works or items of work
which may have been caused whilst the materials were with individual dates or completion, on or
in the custody of the Contractors. In addition, cost of before the date(s) or completion, and does not
transporting such materials from Site to the Corporation complete them within the period specified in a
stores, if so required by the Corporation. notice given in writing in that behalf by the
Architect/Project Engineer; or
(d) Reasonable compensation for transfer of T&P from
Site to Contractors permanent stores or to his other (d) Shall offer or give or agree to give to any
Works, whichever is less, If T&P are not transported to person in Corporation's service or to any other
either of the said places, no cost of transportation shall person on his behalf any gift or consideration
be payable. or any kind as an inducement or reward for
doing or forbearing to do or for having done or
36. 2 The contractor shall, if required by the forborne to do any act in relation to the
Architect/Project Engineer, furnish to him books of obtaining or execution or this or any other
account, wage books, time sheets and other relevant Contract for the Corporation; or
documents as may be necessary to enable him to certify e) Shall enter into a contract with the Corporation
the reasonable amount payable under this Condition. in connection with which commission has been
paid or agreed to be paid by him or to his
Termination of contract for Death knowledge, unless the particulars of any such
37. If the Contractor is an individual or a proprietary commission and the terms of payment thereof
concern and the individual or the proprietor dies and if have previously been disclosed in writing to
the Contractor is a partnership concern and one of the the Accepting Authority/Project Engineer; or
partners dies then unless the Accepting Authority is f) Shall obtain a Contract with the Corporation as
Satisfied that the legal representatives of the individual a result of ring tendering or other non-
Contractor or of the proprietor of the proprietary benefited methods of competitive tendering, or
concern and in the case of partnership, the surviving g) Being an individual, or if a firm, any partner
partners are capable of carrying out and completing the thereof, shall at a time be adjudged insolvent
Contract the Accepting Authority shall be entitled to or have a receiving order or order for
cancel the Contract as to its incomplete part without the administration of his estate made against him
Corporation being in any way liable to payment of any or shall take any proceedings for
compensation to the estate or the deceased Contractor liquidation/composition (other than a voluntary
and/or to the surviving partners of the Contractor’s firm liquidation for the purpose of (amalgamation
on account of the cancellation of the Contract. The or reconstruction) under any Insolvency Act
decision of the Accepting Authority that the legal for the time being in force or make any
representatives of the deceased Contractor or the conveyance or assignment of his effects or
surviving partners of the Contractor’s firm cannot carry composition or arrangement for the benefit of
out and complete the Contract shall be final and binding his creditors or purport so to do, or if any
on the parties. In the event of such cancellation the application be made under any Insolvency Act
Corporation shall not hold the estate of the deceased for the time being in force for the sequestration
of his estate or if a trust deed be executed by
him for the benefit of his creditors; or 38. 4 If the Contractor shall fail to pay the required
(h) Being a company shall pass a resolution or the sum within the aforesaid period of 30 days, the
Court shall make an order for the liquidation of Architect/Project Engineer shall have the right to any or
its affairs, or a receiver or manager of behalf of all of the Contractor’s temporary buildings, etc. and
the debenture holders shall be appointed or apply the proceeds of sale thereof towards the
circumstances shall arise which entitle the satisfaction of any sums due from the contractor under
court on debenture holders to appoint a the Contract and if thereafter there be any balance
receiver or Manager or outstanding from the Contractor, it shall be recovered in
(i) Shall suffer an execution being levied on his accordance with the provisions of the contract.
goods and allow it to be continued for a period
of 21 days; or 38. 5 Any sums in excess of the amounts due
(j) Assigns, transfers, sublets (engagement of to the corporation and unsold materials, constructional
labour on a piecework basis or of labour plant, etc. shall be returned to the contractor, provided
with materials not to be incorporated in always that if cost or anticipated cost of completion by
the work, shall not be deemed to be Corporation of the works or part of works is less than
subletting) amount which the contractor would have been paid had
or attempts to assign, transfer or sublet the he completed the works or part of works, such benefit
entire Works or any portion thereof without the shall not accrue to the contractor.
prior written approval of the Accepting Liability for Damages, Defects or imperfections and
Authority, Accepting Authority may, without Rectifications thereof
prejudice to any other right to remedy which 39. If the Contractor or his workmen or employees
shall have accrued or shall accrue thereafter to shall injure or destroy any part of the building in which
the Corporation by written notice, cancel the they may be working or any building, road, fence, etc.
Contract as a whole or only such items of work contiguous to the premises on which the work or any
in default from the Contract. part of it is being executed, or if any damage shall
38. 1 The Accepting Authority shall on such happen to the work while in progress the Contractor
cancellation have powers to: shall, upon receipt of a notice in writing in that behalf,
(a) Take possession of the Site and any materials, make the same good at his own expense. If it shall
constructional plant, implements, stores, etc. appear to the Architect/Project Engineer or his
thereon and/or representative at any time during construction or
(b) Carry out the incomplete work by any means reconstruction or prior to the expiration of the
AT THE RISK AND COST OF THE DEFECTS LIABILITY PERIOD, that any work has
CONTRACTOR. been executed with unsound, imperfect or unskilled
workmanship or that any materials or articles provided
38. 2 On cancellation of the Contract in full or in part by the Contractor for execution of the work are unsound
the Architect/Project Engineer shall determine what or of a quality inferior to that contracted for, or
amount, if any, is recoverable from the Contractor for otherwise not in accordance with the contract, or that
completion of the Works or part of the Works or in case any defect, shrinkage or other faults have appeared in
the Works or part of the Works is not to be completed, the work arising out of defective or improper materials
the loss or damage suffered by the Corporation. In or workmanship, the contractor shall upon receipt of a
determining the amount, credit shall be given to the notice in writing in that behalf from Architect/Project
Contractor for the value of the work executed by him up Engineer, forthwith rectify or remove & re-construct the
to the time of Cancellation, the value of Contractor's work so specified in whole or in part, and/or remove
materials taken over and incorporated in the work, and materials or articles so specified and provide other
use of tackle and machinery belonging to the proper and suitable materials or articles at his own
Contractor. expense, notwithstanding that same may have been
inadvertently passed, certified and paid for and in event
38. 3 Any excess expenditure incurred or to be of his failing to do so within the PERIOD TO BE
incurred by the Corporation in completing the works or SPECIFIED BY THE Architect/Project Engineer in his
part of the Works or the excess loss or damages notice aforesaid, the Project engineer may rectify or
suffered or may be suffered by the Corporation as remove and replace with others the materials or articles
aforesaid after allowing such credit shall be recovered complained of, as the case may be, by other means AT
from any moneys due to the contractor on any account THE RISK AND EXPENSE OF THE CONTRACTOR.
and if such moneys are not sufficient, the Contractor 39. 1 In case of repairs and maintenance works,
shall be called upon in writing to pay the same within splashes and droppings from white-washing, painting,
30 days. etc., shall be removed and surfaces cleaned
simultaneously with completion of these items of 42. 3 Before taking measurements of any work
work in individual rooms, quarters or premises, etc. theProject Engineer or the person deputed by him for
where the work is done, without waiting for the purpose shall give a reasonable notice to the
completion of all other items of work Contractor. If the Contractor fails to attend or send an
in the Contract. In case the Contractor fails to comply authorized representative for measurements after such a
with the requirements of this condition, the Project notice or fails to countersign or to record the objection
Engineer shall have the right to get the work done by within a week from the date of measurements, then in
other means at the cost of the Contractor. Before taking any such event measurements taken by the Clerk-of-
such action, however, the Project Engineer shall give Works/Project Engineer or by the person deputed by
three days’ notice in writing to the Contractor. him shall be taken to be correct measurements of the
work.
Urgent Works 42. 4 The Contractor shall, without extra charge,
40. If any Urgent Work (in respect whereof the provide assistance with every appliance, labor& other
decision of the Architect/Project Engineer shall be final thing necessary for measurements.
and binding) becomes necessary and the Contractor is 42. 5 Measurements shall be signed and dated by both
unable or unwilling at once to carry it out, the parties each day on the Site on completion of
Architect/Project Engineer may, by his own or other measurements. If the Contractor objects to any of the
working people carry it out, as he may consider measurements recorded on behalf of the Corporation, a
necessary. If the Urgent Work shall be such as the note to that effect shall be made in the Measurement
Contractor is liable under the Contract to carry out at Book against the item objected to and such note shall be
his expense, all expenses incurred on it by Corporation signed and dated by both parties engaged in taking the
shall be recoverable from Contractor and be adjusted or measurements.
set off against any sum payable to him.
Methods of Measurement
Changes in Constitution 43. Except where any general or detailed description of
41. Where the Contractor is a partnership firm, prior the work in quantities expressly shows to the contrary,
approval in writing of the Accepting Authority shall Schedule of Quantities shall be deemed to have been
be obtained before any change is made in the prepared and measurements shall be taken in
constitution of the firm. Where the Contractor is an accordance with the procedure set forth in the Schedule
individual or a Hindu Undivided Family business of Rates/Specification notwithstanding any provision in
concern such approval as aforesaid shall like-wise be the relevant Standard Method of Measurement or any
obtained before the Contractor enters into any general or local custom. In the case of items, which are
partnership agreement where under the partnership firm not covered by the Schedule of Rates/Specification,
would have the right to carry out work hereby measurements shall be taken in accordance with
undertaken by the Contractor. If prior approval as relevant Standard Method of Measurement issued by
aforesaid is not obtained the Contract shall be deemed Bureau of Indian Standards.
to have been assigned in contravention of Condition
38(j) hereof and same action may be taken and the same Payment on Account
consequences shall ensue as provided for in the said 44. Interim bills shall be submitted by the Contractor at
Condition 38. intervals mentioned in Schedule “F” on or before the
date fixed by the Project Engineer for the work
Valuation and Payment executed. The Architect/Project Engineer shall then
Records and Measurement arrange to have the bill verified by taking or causing to
be taken, where necessary the requisite measurements
42. The Architect/Project Engineer shall, except as of the work.
otherwise stated, ascertain and determine by 44. 1 Payment on account for amount admissible shall
measurement the value in accordance with the Contract be made on the Architect/Project Engineer certifying
of work done in accordance therewith. the sum to which the Contractor is considered entitled
42. 1 All items having a financial value shall be by way of interim payment for the following:
entered in Measurement Book, Level Book. etc. a) All work executed, after deducting there from the
prescribed by the Corporation so that a complete record amounts already paid the security deposit and such
is obtained of all work performed under the Contract. other amount as may be deductible or recoverable in
terms of contract.
42. 2 Measurements shall be taken jointly by the b) 75% of the cost (as assessed by the Architect/
Clerk-of-Works/Project Engineer and by the Contractor Project Engineer of any materials which are in the
or his authorized representative. opinion of the Project Engineer reasonably required in
accord as act and have been brought to Site for
incorporation in the Works and are safeguarded against made from materials of which the price has increased as
loss due to any cause whatsoever to the satisfaction of aforesaid and the contractor has thereupon to pay in
the Architect/Project Engineer, but have not been so respect and of such materials or item a price which is
incorporated provided the Contractor provides an higher than the price of that material or item as
insurance cover for the full cost of PERISHABLE prevailing immediately before the passing of such Act
MATERIALS. or levying, increasing of such duty, the corporation
shall in case of increase in price or the duty reimburse
44.2 The advance payments under (b) above shall be to the contractor the increase in price or additional or
adjusted as and when materials are utilized in the increased duty paid by the contractor.
Works.
Overpayments and Underpayments
44.3 Any interim certificate given relating to work 47. 1 Whenever any claim for the payment of a sum
done or materials delivered, may be modified or of money to the corporation arises out of or under this
corrected by any subsequent interim certificate or by the contract against the contractor the same may be
final certificate. No certificate of the Architect/ Project deducted by the corporation from any sum then due or
Engineer supporting an interim Payment shall of itself which at any time thereafter may become due to the
be conclusive evidence that any work or materials to contractor under this contract and failing that under any
which it relates is /are in accordance with the Contract. other contract with the corporation or from any other
44.4 Pending consideration of extension of date of sum due to the contractor from the corporation (which
completion, interim payments shall continue to be made may be available with the corporation) or from his
as herein provided. security deposit, or he shall pay the claim on demand.
47. 2 The Corporation reserves the right to carry out
Time Limit for Payment of Final Bill post payment, audit, and technical examination of the
45. The final bill shall be submitted by the Contractor final bill including all supporting vouchers, abstracts,
WITHIN THREE MONTHS of physical completion of etc. The corporation further reserves the right to enforce
the Works, No further claims shall be made by the recovery of any overpayment when detected,
Contractor after submission of the final bill and these notwithstanding the fact that the amount of the final bill
shall be deemed to have been waived and extinguished. may be included by one of the parties as an item of
Payment of those items of the bill in respect of which dispute before an arbitrator appointed under Condition
there is no dispute and of items in dispute, for quantities 48 of this Contract and notwithstanding the fact that the
and at rates approved by the Architect/Project Engineer amount of the final bill figures in the arbitration award.
shall be made within the period specified hereunder, the 47. 3 If as a result of such audit and technical
period being reckoned from the data of receipt of the examination any overpayment is discovered in respect
bill by Architect/Project Engineer: of any work done by the Contractor or alleged to
have been done by him under the Contract. It shall be
(a) Contract amount not recovered by the Corporation from the contractor by
Exceeding Rs.5.00 Iakhs…Four months any or all of the methods prescribed above or if any
(b) Contract amount underpayment is discovered, the amount shall be duly
Exceeding Rs. 5.00 lakhs … Six months paid to the Contractor by the Corporation.
47. 4 Provided that the aforesaid right of the
45. 1 After payment of the amount of the final bill Corporation to adjust overpayments against amounts
payable as aforesaid has been made, the contractor may, due to the Contractor under any other contract with the
if he so desires, reconsider his position in respect of the Corporation shall not extend beyond the period of two
disputed portion of the final bill and if he fails to do so years from the date of payment of the final bill or in
within 90 days, has disputed claim shall be dealt with as case the final bill is a MINUS bill, from the date the
provided in the contract. amount payable by the Contractor under the MINUS
Reimbursement on Variation in Price final bill is communicated to the Contractor.
46. (a) Materials if after submission of the tender and
or during the progress of the works, the price of any 47. 5 Any amount due to the Contractor under this
material (not being a material supplied by the Accepting Contract for underpayment may be adjusted against any
Authority in accordance with the Conditions of the amount then due or which may at any time thereafter
contract) is increased by an Act of Legislature (Central become due before payment is made to the Contractor,
or States) and/or any notification there under or on from him to the corporation on any other contract or
account of new duties or levies such as octroi or on account whatsoever.
account of increase in such duties affecting the price of
materials required for incorporation in the works or the Arbitration and Laws
price of any item to be incorporated in the works and Arbitration
predecessor. It is also a term of this Contract that no
48. Except where otherwise provided for in the person other than a person appointed by the Managing
Contract all questions and disputes relating to the Director/ the Chief Engineer, as aforesaid should act as
meaning of the specifications. Designs, drawings and Arbitrator and if for any reason that is not possible, the
instructions herein before mentioned and as to the matter is not to be referred to Arbitration at all. In all
quality of workmanship or materials used on the Work cases where the amount of the claim in dispute is Rs.
or as to any other question, claim right, matter or thing 50,000 (Rupees fifty thousand) and above, the
whatsoever in any way arising out of or relating to the Arbitrator shall give reasons for the award.
Contract, designs, drawings, specifications, estimates, 49. Any dispute or difference whatsoever arising
instructions, orders or these conditions or otherwise between the parties with regards to the interpretation,
concerning the Works, or execution or failure to execute construction, meaning, scope operation or effect of this
the same whether arising during the progress of the agreement of the breach thereof shall be referred to the
Work or after the completion or abandonment thereof C&MD of ITDC Ltd, New Deli as per provisions of the
shall be referred to the sole arbitration of the Managing Arbitration and conciliation Act 1996 as amended from
Director/Chief Engineer of the India Tourism time to time. The sole arbitrator shall not have any
Development Corporation or any other person direct or indirect or any past or present relationship or
appointed by him. There will be no objection if the interest in any of the parties. The arbitration
arbitrator so appointed is an employee of India Tourism proceedings shall be held in Delhi. The laws of India
Development Corporation and that he had to deal with shall govern this agreement. The Court in Delhi shall
the matters to which the Contract relates and that in the have exclusive jurisdiction.
course of his duties as such he had expressed views on
all of the matters in dispute or difference. The arbitrator Laws Governing the Contract
to whom the matter is originally referred being 50. This Contract shall be governed by the Indian laws
transferred or vacating this office or being unable to for the time being in force.
act for any reason, the **Managing Director/Chief
Engineer shall appoint another person to act as *The Authority appointing the Arbitrator should not be
arbitrator in accordance with the terms of the Contract. lower in rank than the Authority accepting the
Such person shall be entitled to proceed with the agreement
reference from the stage at which it was left by his
TENDER
To
INDIA TOURISM DEVELOPMENT CORPORATION

Unit: _____________________________________________________________

(Hereinafter referred to as the Corporation)

I / We have read and examined the following documents relating to the Construction

of_______________________________________________________________________

(a) Notice Inviting Tender


(b) Schedules A, B, C, & F
(c) Technical Specifications
(d) Drawings
(e) Special Conditions

I / We hereby tender for the execution of the works referred to in the aforesaid documents upon the terms and conditions contained or
referred to therein and in accordance in all respects with the specifications, designs, drawings and other relevant details at the rates
contained in Schedule 'A' and within the period(s) of completion as stipulated in Schedule 'F'.

A sum of Rs.___________________ is hereby forwarded in crossed bank draft No ____________

date_______________drawn on _________________________ Bank favouring India Tourism Development Corporation, New Delhi,
as Earnest Money. If I/We fail to keep the tender open for a period of 90{ninety) days validity after opening the tender(s}, or make any
modifications in the terms and conditions of the tender which are not acceptable to the Corporation, I/We agree that the Corporation
shall, without prejudice to any other right or remedy, be at liberty to forfeit the said earnest money absolutely. Should this tender be
accepted, I/We hereby agree to abide by and fulfil all the terms, conditions and provisions of the aforesaid documents.

If, after the tender accepted, I/We fail to commence the execution of the works as provided in the conditions, I/We agree that
the Corporation shall without prejudice to any of their right or remedy, be at liberty to forfeit the said earnest money absolutely.

Witness ____________________________________ Signature __________________________________________

Date__________________________in the capacity of ___________________________________

Address____________________________________ Duly authorized to sign _____________________________________________the


tender on behalf of

_____________________________________________ (In block capitals)

Date: _________________________________________________

Postal address__________________________________________

__________________________________________________

Telegraphic Address_________________________________
Schedule ‘F’
Reference to General Conditions of Contract
(To be signed by the Contractor(s) at the time of signing the agreement)

Condition No:

3(b) Accepting Authority India Tourism Development Corporation

3(i) Market Rate - percentage addition to


cover profit, overheads and supervision 15%

9. (a) Estimated cost of the Works put to tender As per NIT Only

(b) Earnest money (2% of the estimated


cost of the Works subject to a
maximum of Rs.1, 00,000.00) As per NIT

(c) Security deposit (10% of gross value


of work Subject to a maximum of
Rs.5.00 lakhs) Rs. ________________________________________

11 (i) Schedule of rates applicable: Latest CPWD S.O.R.


Percentage adjustment to the rates in Plus/minus __________________________________
The Schedule of Rates, for pricing Percentage,
for pricing deviations

13. Time allowed for execution of work 06 Months


(To be reckoned from the SEVENTH
Day after the date of work order)

29. Compensation for delay: As per NIT

1% (one percent) of the contract amount subject to a maximum of Rs. 50000/- PER WEEK or a part there of for the first four
weeks of delay and subsequent delays for every week or part thereof, amount shall be 2% of the contract amount subject to a
maximum of Rs. 1 lac per week. The total compensation for delay shall further be subject to an overall maximum of 15%
(fifteen percent) of the contract amount as awarded. The decision of the competent authority shall be final and binding.

30. Defects liability Period RFID Door locks, Door locks


30.1 works, electrical works, plant and machinery, furniture, roads and
drainage, etc. – ONE YEAR from the date of completion.

44. Interim Bills Monthly or as certified by the Architect /


Project Engineer
45. Final Bill
a) Contract amount not exceeding
Rs. 5.00 lakhs Four months.
b) Contract amount Exceeding
Rs. 5.00 lakhs Six months.
Schedule 'B'

Materials for Issue to the Contractor.


(See Condition 15)

SI. Particulars Rate at which Material will Quantity Place of Issue


No. Be issued
_____________________________
Unit Rs.

1 2 3 4 5 6

NIL

Signature of Signature of

Issuing Officer___________________________ Contractor _____________________

Date___________________________________ Date_____________________________
Schedule “C”
Performa Recommending Extension of Time
(1) Name of work
(2) Name of Contractor
(3) Name of Architect
(4) Contract Amount
(5) Final Gross Value of Work including cost of extra items
(6) Date of award of the work
(7) Date of commencement of work
(8) Completion date as per the Contract
(9) Actual date of completion
(10) Period requiring extension
(11) Amount of compensation for delay as per the Contract
(12) Reference to Contractor's letter(s) of application seeking extension of time within due date as per contract.
(13) Reasons for delay and justifications:
(a)________________________________________________________
(b)________________________________________________________
(c)________________________________________________________
(d)________________________________________________________

(14) Conclusion:
(a) Full extension is recommended without levy of compensation amount

OR (b) Full extension is recommended with levy of compensation amount of Rs

Forperiod_________________________________days _____________________________

(Strike out Words which are not applicable)

SIGNATURES:

Assistant Engineer Executive Engineer Architect Project Engineer

NOTE: Duplicate typed copies of extracts from the Hindrance Register should be enclosed with this Performa.
Form of Bank Guarantee in Security Deposit in
Individual Contract
(General Condition No, 9)
To,
India Tourism Development Corporation
1. In consideration of the I.T.D.C. ______________________________ of________________________ (hereinafter called the
"Corporation" which expression shall unless repugnant to the subject or context include his successors and assigns) having agreed under
the terms and conditions of Contract No.__________________________ Date__________________________ made between
______________________________________________ and the Corporation in connection with
______________________________________________ (hereinafter called the said Contract) to accept a Deed of Guarantee as herein
provided for Rs.____________________________________ from a Scheduled Bank in lieu of the security deposit to be made by the
Contractor or in lieu of the deduction to be made from the Contractor's bills, for the due fulfilment by the said Contractor of the terms
and conditions contained in the said Contract we, the _____________________________ Bank Ltd. (hereinafter referred to as "the said
Bank") a company under the Companies Act 1956 and having our registered Office at
_______________________________________do hereby undertake and agree to Indemnify and keep indemnified the Corporation from
time to time to the extent of Rs. ________________________ (Rupees _________________________________only) against any loss or
damage, costs, charges and expenses caused to or suffered by or that may be caused to or suffered by the Corporation by reason of any
breach or breaches by the said Contractor of any of the terms and conditions contained in the said Contract and to unconditionally pay
the amount claimed by the Corporation on demand and without demur to the extent aforesaid.

2. We _____________________________________________________ Bank Ltd. further agree that the Corporation shall be the sole
judge of and as to whether the said Contractor has committed any breach or breaches of any of the terms and conditions of the said
Contract and the extent of loss, damage, costs, charges and expenses caused to or suffered by or that may be caused to or suffered by the
Corporation on account thereof and the decision of the Corporation that the said Contractor has committed such breach or breaches and
as to the amount or amounts of loss, damage, costs, charges and expenses caused to or suffered by or that may be caused to or suffered
by the Corporation from time to time shall be final and binding on us.
3. We, the said Bank, further agree that the Guarantee herein contained shall remain in full force and effect during the period that would
be taken for the performance of the said Contract and till all the dues of the Corporation under the said Contract or by virtue of any of the
terms and conditions governing the said Contract have been fully paid and its claims satisfied or discharged and till
___________________________ certifies that the terms and conditions of the said Contract have been fully and properly carried out by
the said Contractor and accordingly discharges this Guarantee subject, however, that the Corporation shall have no claim under this
Guarantee after ____________________________ years from the date of expiry of the Defects Liability Period as provided in the said
Contract or from the date of cancellation of the said Contract, and the Case may be, unless a notice of the claim under this Guarantee has
been served on the Bank before the expiry of the said period of _______________________ years in which case the same shall be
enforceable against the Bank notwithstanding the fact, that the same is enforced after the expiry of the said period of
____________________________________ years.
4. The Corporation shall have the fullest liberty without affecting in any way the liability of the Bank under this Guarantee or Indemnity
from time to time to vary any of the terms and conditions of the said contract or to extend time of performance by the said Contractor or
to postpone for any time and from time to time any of the powers exercisable by it against the said contractor and either to enforce to
forebear from enforcing any of the terms and conditions governing the said Contract or securities available to the Corporation and the
said Bank shall not be released from its liability under these present by any exercise by the Corporation of the liberty with reference to
the matters aforesaid or by reason of time being given to the said Contractor or any other forbearance, act or omission on the part of the
Corporation or any indulgence by the Corporation to the said Contractor or any other matter or thing whatsoever which under the law
relating to sureties would but for this provision have the effect of so releasing the Bank from its such liability.

5. It shall not be necessary for the Corporation to proceed against the Contractor before proceeding against the Bank and the Guarantee
herein contained shall be enforceable against the Bank. Notwithstanding any security which the Corporation may have obtained or obtain
from the Contractor shall at the time when proceedings are taken against the Bank hereunder be outstanding or unrealized.

6. We, the said Bank, lastly undertake not to revoke this Guarantee during its currency except with the previous consent of the
Corporation in writing and agree that any change in the Constitution of the said Contractor or the said Bank shall not discharge our
liability hereunder.
Date this day of 20
FOR AND ON BEHALF OF THE BANK

The above Guarantee is accepted by the India Tourism Development Corporation/

For and on behalf of the I.T.D.C. ______________________________ of_____________________________________ sd.


___________________________________
Dated_________________________________
(Name and designation)
NOTE:
For proprietary concerns
Shri_____________________________________ son of ____________________________ resident of
__________________________________________________________ carrying on business under the name and style
of_____________________________________________ at_______________________________ (hereinafter called “the said
Contractor” which expression shall unless the context requires otherwise include his heirs, executors, administrators and legal
representatives).

For Partnership concerns


(a) Shri ______________________________ son of ____________________________________________
Resident of __________________________________________________________________________________________
(b) Shri _______________________________________son of___________________________________ resident of
____________________________________________________________________ carrying on business in co-partnership under the
name and style of __________________________________________________
at_____________________________________________ (hereinafter collectively called “the said Contractor” which expression shall
unless the context requires otherwise include each of them and their respective heirs, executors administrators and legal representatives).

For Companies
S/ Shri_________________________________________________________ a company under the Companies Act 1956 and
having its registered office at ____________________________________ in the State of
________________________________________ hereinafter called:” the said Contractor” which expression shall enter the context
requires otherwise include its successors and assigns).
Bank Guarantee for Advance to Contractors
The India Tourism Development Corporation Ltd.
Scope Complex, Core 8 Lodhi Road
New Delhi-110003

THIS BANK GUARANTEE made this________________________________________________between ___________ (hereinafter


referred to as guarantor) In favour of India Tourism Development Corporation Limited a company registered under the Companies Act
having its registered office at Scope Complex, Core 8, Lodhi Road, New Delhi-110003 (hereinafter referred to as employer).

WHEREAS M/s_________________________________________ (hereinafter called contractor) has entered


into a contract with the employer to carry out the work and have agreed to complete the above mentioned work in accordance with the
time bound programme agreed to separately between the employer and the contractor, namely by.
_____________________________________________________

1. NOW THIS GUARANTEE WITNESS that in consideration of the employer having agreed to contractor's request for the release of
Rs. _________________________ (Rupees____________________ only) as advance against order on furnishing Bank Guarantee for
Rs. _________________ (Rupees________________________________________ only).

2. We do hereby unconditionally and irrevocably agree and undertake to pay to India Tourism Development Corporation Limited, New
Delhi on demand and without demur and amount not exceeding Rs. ________________________
(Rupees__________________________________ only).

3. Any such demand on the Bank shall be conclusive as regards the amount due and payable by the Bank under this guarantee. However,
our liability under this guarantee shall be restricted to any amount not exceeding Rs. __________________________
(Rupees__________________________________________________________ only).

4. We further agree and confirm that this guarantee also covers all risks regarding security for the due and faithful fulfilment of the
contract by M/s _________________________________________ and also any loss or damage caused to or suffered by, or would be
caused to or suffered by the employer by reason of any breach by the said contractor of any of the terms and conditions contained in the
said agreement or by reason of the contractor's failure to complete the work strictly in accordance with the time schedule agree to. We
further agree that the employer shall be the sole judge of and as to whether the said contractor has committed any breach of any of the
terms and conditions of the contract and as to the extent of the loss or damage caused to or suffered by the employer on account thereof.
We further agree that the guarantee herein contained shall remain in force and effect during the period that would be taken for the
performance of the said contract and it shall continue to be enforceable till all the dues of the employer under or by virtue of the said
order have been fully paid and its claim satisfied or discharged or till the India Tourism Development Corporation Limited. New Delhi,
certify that terms and conditions of the said order have been fully and properly carried out by the said contractor and accordingly
discharge the Guarantee provided, however, that unless a demand or claim under the guarantee is made on us in writing on or before
_____________________________________ we shall be discharged from all liabilities under this guarantee thereafter.

5. We further agree that the India Tourism Development Corporation Limited. New Delhi, shall have the fullest liberty with or without
our consent and without effecting in any manner our obligation hereunder, to vary any of the terms and conditions of the said contract or
extend time of performance by the said contractor from time to time, postpone for any time or from time to time any of the powers
exercisable by India Tourism Development Corporation Limited, New Delhi, against the said contractor and to forbear or enforce any of
the terms and conditions relating to the said order and we shall not be retrieved from .our liability by reasons of any such variation, or
extension being granted to the said contractor or for any forbearance act or omission on the part of the India Tourism Development
Corporation Limited, New Delhi, or any indulgence by it to the said contractor or by any such matter or thing whatsoever which under
the law relating to surety would but for this provision have the effect of so relieving us from its such liability.

6. We lastly undertake not to revoke this guarantee during its currency except with the previous consent of the India Tourism
Development Corporation Limited, New Delhi.

7. Notwithstanding anything contained hereinbefore, our liability under this bond is restricted to as Rs.
____________________________ (Rupees ______________________________________only) and It will remain in force till the
______________________________________ Unless a claim or demand in writing is made against us under this guarantee before that
date all your rights under the said guarantee shall be forfeited and we shall be relieved and discharged from all liability there under.
Annexure (schedule –G)
EMD refund form
(To be filed by the contractor)
Name of the tender applied for:________________________________________________________Date:________________

Details of the bidder.

Name of the firm:_________________________________________________________________________________________

Address:_________________________________________________________________________________________________

________________________________________________________________________________________________________

Name of the Authorized Signatory:___________________________________________________________________________

Contact No:_______________________________________________________________________________________________

Email ID:_______________________________________________________________________________________________

Details of EMD submitted:-

Cash Deposited: Rs.__________________With:_____________________________________________________________

Receipt No:_____________________________________________________________Date:_________________________

Pay Order/DD No:______________________________Dated:__________________Drawn on:________________________

in case of payment through RTGS please provide the


Bank transaction reference number:_______________________________________________________________________

In case of payment through NEFT please provide the


UTR number:__________________________________________________________________________________________

In case of bidding through E-proc website please provide the


OPGR No:______________________________________________________________________________________________

Particulars for online refund (Please attached scanned copy of cheque)

Name of Bank:_________________________________________________________________________________________

Branch name & Address:________________________________________________________________________________

IFSC Code:____________________________________________________________________________________________

Account No:_____________________________________________________Account Type:_________________________

I hereby declare that the particulars given above are correct and complete and accord our consent receiving EMD without claiming any
interest.

Signature of the authorized signature

Name:____________________________

Designation:_______________________

Official Seal:_______________________
PRE-CONTRACT INTEGRITY PACT

This pre-bid pre-contract Agreement (hereinafter called the Integrity Pact) is made on____ day of the month of____ 2019
between on one hand, The President of India acting through Shri___________, Designation of the Officer,
Ministry/Department, Govt. of India (hereinafter called the “BUYER” which expression shall mean and include unless the
context otherwise requires his successors in office and assigns) of the First Part and M/s._________ represented by Shri
___________, Chief Executive Officer hereinafter called the “BIDDER/SELLER” which expression shall mean and
include unless the context otherwise requires his successors and permitted assigns of the Second Part.
WHEREAS the BUYER proposes to procure (Name of the Stores/Equipment/item) and the BIDDER / SELLER is willing
to offer/has offered the stores and
WHEREAS the BIDDER is a private company/public company/Government undertaking/ partnership expert agency
constituted in accordance with the relevant law in the matter and the BUYER is a Ministry/Department, Govt. of
India/PSU performing its function on behalf of The President of India.
NOW THEREFORE:- To avoid all forms of corruption by following a system that is fair, transparent free from any
influence/prejudiced dealings prior to, during and subsequent to agency of the contract to be entered into with a view to:-
Enabling the BUYER to obtain the desired said stores/equipment at a competitive price in conformity with the defined
specifications by avoiding the high cost and the distortionary impact of corruption on public procurement and
Enabling BIDDERs to abstain from bribing or indulging in any corrupt practice in order to secure the contract by
providing assurance to them that their competitors will also abstain from bribing and other corrupt practices and the
BUYER will commit to prevent corruption in any form by its officials by following transparent procedures.

The parties hereto hereby agree to enter into this Integrity Pact and agree as follows:

1. COMMITMENTS OF THE BUYER

1.1 The BUYER undertakes that no official of the BUYER connected directly or indirectly with the contract will
demand, take a promise for or accept, directly or through intermediaries, any bribe, consideration, gift, reward,
favour or any material or immaterial benefit or any other advantage from the BIDDER either for themselves or for
any person, organization or third party related to the contract in exchange for an advantage in the bidding process
bid evaluation, contracting or implementation process related to the contract.
1.2 The BUYER will during the pre-contract stage treat all BIDDERS alike and will provide to all BIDDERS the same
information and will not provide any such information to any particular BIDDER which could afford an advantage
to that particular BIDDER in comparison to other BIDDERS.
1.3 All the officials of the BUYERS will report to the appropriate Govt. office of any attempted or completed breaches
of the above commitments as well as any substantial suspicion of such a breach.

3. COMMITMENTS OF BIDDERS
The BIDDER commits itself to take all measures necessary to prevent corrupt practices, unfair means and illegal
activities during any stage of its bid or during any pre-contract or post-contract stage in order to secure the contract
or in furtherance to secure it and in particular, commit itself to the following:

3.1 The BIDDER will not offer directly or through intermediaries any bribe, gift consideration, reward, favour, any
material or immaterial benefit, other advantage, commission, fees brokerage or inducement to any official of the
BUYER connected directly or indirectly with the bidding process or to any person, organization or third party
related to a contract in exchange for any advantage in the bidding, evaluation, contracting and implementation of
the contract.
3.2 The BIDDER further undertakes that it has not given, offered, promised to give directly or indirectly any bribe,
gift, consideration, reward, favour any material or immaterial benefit or other advantage, commission, fees,
brokerage or inducement to any official of the BUYER or otherwise in procuring the Contract or forbearing to do
or having done any act in relation to the obtaining or execution of the contract or any other contract with the
Government for showing or forbearing to show favour or disfavor to any person in relation to the contract or any
other contract with buyer.

3.3 BIDDERS of foreign origin shall disclose the name and address of the Agents/Representatives in India and Indian
BIDDERS shall disclose foreign principals.
3.4 BIDDERS shall disclose the payments to be made by them to agents/brokers or any other intermediary in
connection with this bid/contract.
3.5 The BIDDER further confirms and declares to the BUYER that the BIDDER is the original manufacturer
/integrator/authorized Government sponsored export entity of the stores and has not engaged any individual or firm
or company whether Indian or foreign to intercede facilitate or in any way to recommend to the BUYER or any of
its functionaries, whether official or unofficially to the award of the contract to the BIDDER, nor has any amount
been paid, promised or intended to be paid to any such individual firm or company in respect of any such
intercession, facilitation or recommendation.
3.6 The BIDDER, either while presenting the bid or during pre-contract negotiations or before signing the contract
shall disclose any payment he has made is commented to or intends to make to officials of the BUYER or their
family members agents brokers or any other intermediaries in connection with the contract and the details of
services agreed upon for such payments.
3.7 The BIDDER will not collude with other parties interested in the contract to impair the transparency fairness and
progress of the bidding process, bid evaluation contracting and implementation of the contract.
3.8 The BIDDER will not accept any advantage in exchange for any corrupt practice unfair means and illegal
activities.
3.9 The BIDDER shall not use improperly for purposes of competition or personal gain, or pass on to others any
information provided by the BUYER as part of the business relationship regarding plans, technical proposals and
business details including information contained in any electronic data carrier. The BIDDER also undertakes to
exercise due and adequate are lest any such information is divulged.
3.10 The BIDDER commits to refrain from giving any complaint directly or through any other manner without
supporting it with full and verifiable facts.
3.11 The BIDDER shall not instigate or cause to instigate any third person to commit any of the actions mentioned
above.
3.12 If the BIDDER or any employee of the BIDDER or any person acting on behalf of the BIDDER either directly or
indirectly is a relative of any of the officers of the BUYER or alternatively if any relative of any officers of the
BUYER has financial interest/stake in the BIDDER’s firm, the same shall be disclosed by the BIDDER at the time
of filing of tender.
The term “Relative” for this purpose would be as defined in Section 6 of the Companies Act, 1956.

3.13 The BIDDER shall not lend to or borrow any money from or enter into any monetary dealings of transaction
directly or indirectly with any employee of the BUYER.

4. PREVIOUS TRANSGRESSION

4.1 The BIDDER declares that no previous transgression occurred in the last three years immediately before signing of
this Integrity Pact, with any other company in any country confirming to anti-corruption approach in respect of any
corrupt practices envisaged hereunder or with any Public Sector Enterprise in India or any Government
Department in India that could justify BIDDER’s exclusion from the tender process.
4.2 The BIDDER agrees that if it makes incorrect statement on this subject BIDDER can be disqualified from the
tender process or the contract already awarded, can be terminated for such reason.

5. EARNEST MONEY (SECURITY DEPOSIT)

5.1 While submitting commercial bid, the BIDDER shall deposit an amount ____________ (to be specified in RPF) as
Earnest Money / Security Deposit, with the BUYER through any of the following instruments:
Bank Draft or a Pay Order in favour of __________.
A confirmed guarantee by an Indian Nationalized Bank promising payment of the guaranteed sum to the BUYER
or demand within three working days without any demur whatsoever and without seeking any reasons whatsoever.
The demand for payment by the BUYER shall be treated as conclusive proof of payment.
Any other mode or through any other instrument (to be specified by RFP)
5.2 The Earnest Money / Security Deposit shall be valid upto a period of five years or complete conclusion of the
contractual obligations to the complete satisfaction of both the BIDDER and the BUYER and after completion of
warranty period, whichever is later.

5.3 In case of successful BIDDER a clause would also be incorporated in the Article pertaining to Performance Bond
in the Purchase Contract that the provisions of Sanctions for Violation shall be applicable for forfeiture of
Performance Bond in case of a decision by the BUYER to forfeit the same by assigning reason for imposing
sanction to violation of this Pact.
5.4 No interest shall be payable by the BUYER to the BIDDER on Earnest Money/Security Deposit for the period of
its currency.

6. SANCTIONS FOR VIOLATIONS

6.1 Any breach of the aforesaid provisions by the BIDDER or any one employed by it or acting on its behalf (whether
with or without the knowledge of the BIDDER) shall entitle the BUYER to take all or any one of the following
actions wherever recurred.
I To immediately call off the pre-contract negotiations after assigning any reason. However, the proceedings with
the other BIDDER(s) would continue.
Ii The Earnest Money Deposit (in pre-contract stage) and/or Security Deposit/Performance Bond (after the contract
is signed) shall stand forfeited either fully or partially as decided by the BUYER and the BUYER shall assign
reason therefore.
Iii To immediately cancel the contract if already signed, without giving any compensation to the BIDDER.
Iv To recover all sums already paid by the BUYER and in case an Indian BIDDER with interest thereon at 2% higher
than the prevailing Prime Lending Rate of State Bank of India, while in case of BIDDER from a country other
than India with interest thereon at 2% higher than the LIBOR. If any outstanding payment is due to the BIDDER
from the BUYER in connection with any other contract for any other stores, such outstanding payment could also
be utilized to recover the aforesaid sum and interest.
V To encash the advance bank guarantee and performance bond/warranty bond if furnished by the BIDDER in order
to recover payments already made by the BUYER along with interest.
Vi To cancel all or any other contracts with the BIDDER. The BIDDER shall be liable to pay compensation for any
loss or damage to the BUYER resulting from such cancellation/rescission and the BUYER shall be entitled to
deduct the amount so payable from the money due to the BIDDER.
Vii To debar the BIDDER from participating in future bidding processes of the Govt. of India for a minimum period
of 5 years, which may be further extended at the discretion of the BUYER.
Viii To recover all sums paid in violation of this Pact by BIDDER(s) any middlemen or agent or broker with a view to
securing the contract.
Ix In cases where irrevocable Letters of Credit have been received in respect of any contract signed by the BUYER
with the BIDDER, the same shall not be opened.
X Forfeiture of Performance Bond in case of a decision by the BUYER to seek for the forfeiture for imposing
sanction for violation of this Pact.
6.2 The BUYER will be entitled to take all or any of the actions mentioned at para 6.1 (i) to (x) of this Pact also on the
Commission by the BIDDER or any one employed by it or acting on its behalf (whether with or without the
knowledge of the BIDDER) of an offence as defined in Chapter IX of the Indian Penal Code, 1860 or Prevention
of Corruption Act, 1988 or any other statute enacted for prevention of corruption.
6.3 The decision of the BUYER to the effect that a breach of the provisions of this Pact has been committed by the
BIDDER shall be final and conclusive on the BIDDER. However, the BIDDER can approach the independent
Monitor (s) appointed for the purposes of this Pact.

7. FALL CLAUSE

The BIDDER undertakes that it has not supplied/is not supplying similar product/systems or sub-systems at a price
lower than that offered in the present bid in respect of any other customer, Ministry/Department of the
Government of India or PSU and if it is found at any stage that similar products/systems or such systems was
supplied by the BIDDER to any other Ministry / Department of the Government of India or a PSU at a lower price
than that very price with due allowance for elapsed time would be applicable to the present case and the difference
in the cost would be refunded by the BIDDER to the BUYER if the contract has already been concluded.

8. INDEPENDENT MONITORS

8.1 The BUYER appoints independent Monitor for this Pact in consultation with the Central Vigilance Commission
(Name and Address of the Monitors to be given).

8.2 The task of the Monitor is to review independently and objectively, whether and to what extent the parties comply with
the obligations under this agreement.
8.3 The Monitor is not subject to instructions by the representatives of the parties and performs his functions, neutrally and
independently.
8.4 Both the parties accepted that the Monitor has the right to access all the documents relating to the project/procurement
including minutes of meeting.
8.5 As soon as the Monitor notices, or believes to notice, a violation of this agreement, he will so inform the Authority
designated by the Buyer.
8.6 The BIDDERS accept that the Monitor has the Right to access without restriction to all project documentation of the
BUYER including that provided by the BIDDER. The BIDDER will also grant the Monitor, upon his request and
demonstration of a valid interest, unrestricted and unconditional access to his project documentation. The same is
applicable to sub contractors. The Monitor shall be under contractual obligation to treat the information and documents
of the BIDDER with confidentially.
8.7 The BUYER will provide to monitor sufficient information about all the meetings among the parties relating to the
project provided such meeting could have an impact on contractual relation between the parties. The parties will offer
to the Monitor the option to participate in such a meeting.
8.8 The Monitor will submit a written report to designated Authority of Buyer in the Department within 8 to 10 weeks
from the date of reference or intimation to him by the buyer/bidder and should the occasion arise, submit proposal for
correcting problematic situations.
9. FACILITATION OF INVESTIGATION

In case of any allegation of violation of any provisions of this Pact or payment of commission, the BUYER or its
agencies shall be entitled to examine all the documents including the Book of Accounts of the BIDDER and the
BIDDER shall provide necessary information and documents in English and shall extend all possible help for the
purpose of such examination.

10. LAW AND PLACE OF JURISDICTION

This Pact is subject to Indian Law. The place of performance and jurisdiction is the seat of the BUYER.

11. OTHER LEGAL ACTIONS

The actions stipulated in this Integrity Pact are without prejudice to any other legal action that may follow in
accordance with the provisions of the extant law in force relating to any civil or criminal proceedings.

12. VALIDITY
12.1 The validity of this Integrity Pact shall be from the date of its signing and valid upto 5 years after complete execution
of the contract to the complete satisfaction of both the BUYER and the BIDDER/SELLER and including warranty
period. In case the BIDDER is unsuccessful this Integrity Pact shall expire after six months from the date of the
signing of the contract.
12.2 Should one or several provisions of this Pact turn out to be invalid, the remainder of this Pact shall remain valid. In this
case the parties will strive to come to an agreement to their original intentions.

13. The parties hereby sign this integrity pact at ________________ on __________________.

BUYER BIDDER

Name of the Officer


Designation “Chief Executive Officer”
Dept./MINISTRY/PSU

WITNESS WITNESS

1.__________________________ 1. ____________________________

2.____________________________ 2. ____________________________
SPECIAL TERMS & CONDITIONS

1. GENERAL
These Special Conditions shall be read in conjunction with the General Terms and conditions and shall take precedence over the
General Conditions in case of any difference between the two.

2. OWNER AND SITE


The name and address of the owner responsible for the preparation of the contract agreement/documents are as follows:

Owner: India Tourism Development Corporation


6th Floor, Scope Complex
Lodhi Road, New Delhi 110003

Site: The Samrat Hotel, New Delhi

3. PAYMENT TERMS:

The following payment shall be applicable for the works to be carried out under this contract:
a) 75% of cost of material supplied at site as secured advance on production of actual bills along with challans of
materials clearing indicating reference of work order, quantity and BOQ item number.
b) 85% of schedule item rate shall be payable on completion of installation/execution of wok at site.
c) 95% of schedule item rate shall be payable on completion of testing.
d) 100 % of schedule item rate shall be payable on final commissioning and handing over of works.
e) 10% security deposit shall be deducted from gross amount of Running/Final bills and shall be
applicable in accordance with Clause No. 9 of the General Conditions of Contract
.
4. REIMBURSEMENT OF ESI/PF
The contractor shall have registration with EPFO and ESIC. The ESI and EPF contributions on the part employer in respect of
this contract shall be paid by the contractor. These contributions on the part of the employer paid by the contractor shall be
reimbursed by the ITDC to the contractor on actual basis on production of deposit challans for the subject work clearly
indicating transaction of payment.

5. ACCIDENTS/INJURY
ITDC will not be responsible for any kind of accident, injury or casualty occurred to the contractor or his representative, worker
or workmen or persons, animals or things and for all damages to the project works, materials, equipment, structural and / or
decorative part of property which may arise from the operations or neglect of Contractor or any of his employees whether such
injury or damage arise from carelessness, accident or any other cause whatsoever in any way connected with the carrying out of
this contract.

6. CURRY OF QUOTE- The contractor is required to quote price in INR only.

7. CHALLANS
The contractor shall bring all material required for execution of works along with challan in duplicate indicating reference of
work order quantity etc. and get them checked/verified through security. One copy of challan shall be retained by the security
department and the original copy will be stamped and signed and shall be returned to contractor by the security. The contractor
shall retain these challans till the end of contract.

8. SITE SUPERVISON
The contractor shall issue identity cards to the staff deputed on the work. The staff deputed on the work shall be in proper
uniform as decided by the Engineer in charge. The contractor shall indemnify the department against all losses or damages or
liability arising in respect of staff deployed by him on the work. The contractor shall have to adopt all the safety precautions
while executing the work and no claim shall be entertained by the department in case of any accident while carrying out the
work.

9. SERVICE ENGINEERS/MECHANICS/LABOR
The service engineers/mechanics deployed must have requisite expertise. The contractor may employ such number of
employees as he may think fit for due discharge of the contract and the person so employed by him shall be the employee of the
contractor for all purpose whatsoever, and shall not be deemed to be in the employment of the company. However, ITDC shall
make arrangement of issuance of gate entry passes to all such personnel after receiving request in writing from the contractor.

The contractor shall be solely responsible for any cost/risk/loss/accident due to transportation to hotel or movement of the
System inside the hotel. All costs for loading, unloading, transport, shifting complying Government Regulations, Maintenance
and Servicing of the system including the cost of spare parts, periodical replacement shall be borne by the contractor.
10. MAINTENANCE DURING DEFECT LIABILITY PERIOD:
The Contractor shall be liable to carry out regular preventive maintenance to keep the equipment running in a trouble free
condition during the period of contract. All the faults shall be attended whenever required, whether it being a national holiday.
The required tools and plants for carrying out the work shall have to be arranged by the Contractor at his cost and no tools will
be arranged by ITDC. If any material supplied by contractor or workmanship of contractor is found defective during this period,
such defects would have to be removed by the contractor free of cost. Arrangement of necessary tools, instruments and other
necessary items for operation, maintenance and servicing work will be the sole responsibility of the contracting agency
11. OTHER TERMS:

a) The tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting their
tenders. A tenderer shall be deemed to have full knowledge of the site whether he inspects it or not and no extra charges
consequent on any misunderstanding or otherwise shall be allowed. The tenderer shall be responsible for arranging and
maintaining at its own cost all materials, tools & plant, facilities for workers and all other services required for executing the
work unless otherwise specifically provided for in the contract documents. Submission of a tender by a tenderer implies that
he has read this notice and all other contract documents and has made himself aware of the scope and specifications of the
work to be done and of conditions and rates at which stores, tools and plant, etc. Will be issued to him, by the Government
and local conditions and other factors having a bearing on the execution of the work.
b) The contractor has to arrange the inspection and testing of all the materials before the dispatch from the factory/ firm. The
contractor shall give full facilities for the inspection and testing of the materials by Engineer-in-charge or his representatives.
The decision of the Engineer-in-charge shall be final as regards the quality of the materials and workmanship and shall be
binding on the contract.
c) It must be understood that the amount payable under contract to be inclusive of everything required to be done by the
specification, conditions of supply and also all such work, as is necessary for the proper completion of the contract, although
special mentions thereof , have been omitted in the specification.

12. The agency has to dismantle all the locks from the existing doors and returned to Hotel Samrat, in good condition for re-
use at Hotel Samrat as per the direction of Engineer-in-charge without paying any extra cost.
TECHNICAL SPECIFICATION

Sl. GENERAL FEATURE OF LOCK


No.
1 Guestroom Lock shall includes a Reader with sealed Electronics, an Electrified Mortise Lock Case, an Inside
Handle, an Outside Handle and any trim plates, cover plates, latch strikes, edge have an “anti-friction” latch
absorbing force when locking the door to prevent noise.
2 The lock shall be a standalone unit with no need for hardwiring or fixed power supply.
3 The lock case shall be a heavy duty, double locking mortise type.
4 The lock case shall have an auxiliary latch blocking the latch bolt when the door is shut in the frame.
5 Locks shall be available with split trim and full escutcheon as required, all decorative or retrofit cover plates shall
be supplied by the manufacturer in matching finishes and designs.
6 Locks must have min. 1 – Hour fire label and simultaneous retraction of deadbolt and latch with a single turn of
the inside handles for emergency exit.
7 The Locks shall record at least the last 400 events in non volatile Flash Type Memory.
8 The lock audit trail shall have a mechanism that protects it against attempts to “wipe out” information by repeated
actions/inserts by a card.
9 Lock shall be capable of receiving software upgrade by downloading new program into the Flash Memory.
10 The Locks shall be tamper resistant and have no accessible parts from corridor side when the door is closed. All
handles shall attach without visible set screws.
11 All standalone lock shall have a Stainless Steel Single Escutcheon integrated with card reader and electronics
mortised lock case.
12 Audit Trial reports from all standalone lock shall be downloaded by a readout card or with a service device
13 There shall be an “anti-cloning” technology in place making it impossible to “clone” a key by copying
information from one key card onto another.
SPECIFICATION OF LOCK
1 Lock case-ANSI/EURO/US/ANSI/JPN/AUS/CE & UL listed any of compatible.
2 Material -Escutcheon: Stainless steel, quality SS304
Handles: Stainless steel qualities SUS304 Battery cover: Polycarbonate (Makrolon 6265. V0). RFID cover:
Polycarbonate UL94V0 (Makrolon 6555)
3 Solid metal (Stainless Steel or Brass)
4 Handle-Straight
5 User interface-2 colored LED display (green, red).
6 Flash RAM technology
7 Locking mechanism-Electro-mechanical lock/ing mechanism located in the lock case.
8 Anti-Cloning technology - RFID cards
9 Passage mode
10 Audit trail (lock events stored in lock memory)-400 events
11 Guest privacy function
12 Power-4.5 V DC (3 x AA alkaline batteries). Minimum.
CARD ENCODING SYSTEM
1 The System shall be capable of encoding RFID type cards with both standard type PMS terminals with a
Graphical User Interface running on a Microsoft Windows Platform or from stand alone terminals not interfaced
to a PMS system.
2 The Card Encoding System shall keep a record of the time and date that cards are produced and the identity of the
person that produced the card. The database shall be SQL type and support unlimited users and unlimited
different user groups.
3 The System shall provide differentiated log-on rights and be protected by passwords or unique user cards.
4 The database shall have automatic backup and restore functions.
5 The System shall support maximum of 2 checks- in stations and unlimited POS terminals.
6 The system shall use RFID encoders to encode the card.
7 The RFID card encoders shall optionally support encoding of multiple tracks on one card in one operation for
POS etc.
8 The system shall support shared encoders between different workstations
9 All guest and employee cards issue in the system shall have a unique ID.
10
11 It shall be possible to assign names to individual employee cards in the system
12 It shall be possible to configure which employee cards that will have access to a double locked room.
13 Individual employee cards shall be cancelled automatically with no further action required when it is cancelled
from the data base if the system is online.
14 It shall be possible to specify different expiration time on individual employee cards in the same user group for
use with temporary staff etc.
15 It must be possible to add new employees and issue cards for them without having to re-programme the locks
16 It shall be possible to assign guest names to individual cards either through PMS or directly in the system
software.
17 It shall be possible to encode a minimum of 3 different individual guest rooms on a guest room key.
18 It shall be possible to create back-up cards in the system in advance in the case of front desk failure.
SOFTWARE
1 Automatic access-Key card got activated upon check-in.
2 Validation period-Key cards are automatically de- activated upon check-out after time frame of booking.
3 Various alarms-Reduce manual monitoring of the property.
4 System integration-Add on to the system to include other product solutions.
5 Block access to specific areas-Due to security issues, maintenance, etc.
6
Audit trail-Audit trails for the locks or safes can be downloaded from the locks without going to the room.
LIST OF APPROVED MAKE

1. RFID ELECTRONIC LOCK - CISA/ONITY/VINGCARD/SATO/Indigenous make


2. Software - CISA/ONITY/VINGCARD/SATO/Indigenous make
3. RFID ENCODER - CISA/ONITY/VINGCARD/SATO/Indigenous make
4. RFID CARD - CISA/ONITY/VINGCARD/SATO/Indigenous make
India Tourism Development Corporation Ltd.
Unit: Hotel Samrat
Schedule of work

Sub: - Providing and fixing of RFID Locks at Hotel Samrat, New Delhi.

Sl.
Description of Item Qty Unit Rate Amount
No.
Providing and fixing of software based RFID electronic lock set with Lock
case-ANSI, EURO, US ANSI, JPN & AUS Material -Escutcheon:
Stainless steel, quality SS316 Handles: Stainless steel quality SUS304
Battery cover: Polycarbonate (Makrolon 6265 . V0). RFID cover:
Polycarbonate UL94V0 (Makrolon 6555) Solid metal (Stainless Steel or
Brass) Handle-Straight Electronic emergency opening with programming
cable User interface-3 colored LED display (green, red, yellow). Flash
Not to be Not to be
RAM technology Locking mechanism-Electro-mechanical lock/ing
1 48 Nos. Quoted Quoted
mechanism located in the lock case Anti-Cloning technology - RFID cards
Here Here
Passage mode Audit trail (lock events stored in lock memory)-2000 events
Guest privacy function Support Mobile Access Storage temperature 0-70
°C / 32-158 °F: no condensing environment Operating temperature -25 °C
to 70 °C (-13 °F to 158°F), according to IEC 60068-2 Certifications
European EMC, LVD and R&TTE Directives Fire approved according to
EN 1642-1 Fire approved according to UL (timber doors and metal doors).
Power-4.5 V DC (3 x AA alkaline batteries) with all accessories
Providing and fixing of HT24W software Automatic access-Keycard
automatically activated upon check-in. Validation period-Keycards are
automatically deactivated upon check-out. Card update station-In offline
scenarios the guests can use the Automatic Card Update Station to update
the card and get a room number. Various alarms-Reduce manual
monitoring of the property. System integration-Add on to the system to
Not to be Not to be
include other product solutions. Customized reports-Define criteria to
2 1 No. Quoted Quoted
create in report. Unlimited options-No limit in number of reports. Block
Here Here
access to specific areas-Due to security issues, maintenance, etc. Audit
trail-Audit trails for the locks or safes can be downloaded from the server
without going to the room. Payment card-Use same key card as payment
method in restaurants, shops, etc. Counter-Use counters to limit the
number of times guests can access certain areas, e.g. 10 visits to the pool
with all accessories
Providing and fixing of RFID encoder. The locking system shall have the
ability to PMS interface through TCP/IP, Serial RS-232 or DLL/file
interface. The System shall support maximum of 2 check in stations and
Not to be Not to be
unlimited POS terminals. The System must have Automatic Check-in
3 1 No. Quoted Quoted
feature and support Kiosk, and TCP/IP Network. The system shall use
Here Here
RFID encoders to encode the card. The RFID card encoders shall
optionally support encoding of multiple tracks on one card in one
operation for POS etc with all accessories.
Providing and fixing of RFID cards with all accessories Not to be Not to be
4 200 Nos. Quoted Quoted
Here Here
TOTAL
INDIA TOURISM DEVELOPMENT CORPORATION
UNIT: HOTEL SAMRAT, NEW DELHI
ENGINEERING DIVISION
CORRIGENDUM-2

The sale of tender, receiving & opening for the work of “Providing and fixing of RFID Locks at Hotel
Samrat, New Delhi.” has been modified as per schedule given below:

i. Date of sale extended – 12-03-2019 to 22-03-2019 up to 1600 hrs.


ii. Date of receiving of tender – 22-03-2019 till 1600 hrs.
iii. Date of opening of tender – 23-03-2019 at 1600 hrs.

The other terms and conditions shall remain unchanged for details please visit our website:
www.theashokgroup.com, https://etenders.gov.in/eprocure.gov.in/ eprocure/app.
For details contract Asst. Mgr. (E&M), Hotel Samrat, Chanakyapuri, New Delhi-110021.

Asst. Mgr. (E&M)


India Tourism Development Corporation
Hotel SAMRAT
Diplomatic Enclave, 50-B, Kautilya Marg,
Chanakyapuri,
New Delhi-110021.
Ph. No.011-24152839/24152719