CHECK LIST IN DPR

Name of Work : -- Construction of Rajegaon-Kirnapur-Lanji-Amgaon

Road of length 57.400 KM

1 GENERAL POINT
1.1 Name of Circle SIWNI
1.2 Name of Division Balaghat
1.3 Name of Sub Division Lanji
1.4 Classification of road MP-MDR Road
whether standard adopted accordingly as per
1.5 MORTH& H Specification Yes
1.6 Type of terrain Plain&Hilley Road
1.7 Length of road 57.400 Km.
1.8 Total no. of HPC work proposed 8 No.
1.9 No. of culvert & span 4 No. 2x2m 1span
1.10 No. of cause way --
1.11 Estimated amount WIP
Provided as per SOR for Road & Bridges
workissued by the Engineer in chief MP.
1.12 Rates PED. Bhopal w.e.f. – 29.08.2017 up to date
2 FORMATION
2.1 Nature of soil Mixed soil
2.2 Proposed average height of embankment As per L-section , Approved by Department
2.3 proposed formation width 12.00 m
2.4 Proposed average depth of cutting As per L-section , Approved by Department
2.5 Maximum height of embankment & its length As per L-section
2.6 Maximum depth of embankment & its length As per L-section
2.7 Side slope in embankment 1:2
2.8 Side slope in cutting 1:2
2.9 Total quantity of E/W in ordinary soil As per E/W Calculation Sheet =
2.10 Total quantity of E/W in filling As per E/W Calculation Sheet =
2.11 Total quantity of E/W in cutting hard soil As per E/W Calculation Sheet =
2.12 Total quantity of E/W of cutting utilized on filling
2.13 Whether embankment needs protection yes
3 CARRIAGE WAY
3.1 Carriage way Width 7.0M
3.2 Design speed ( Terrain & Plain) as per IRC:37:2018 30 to40 & 60-80 km./hr
Gradient maximum provided( Terrain & Plain) as per
3.3 IRC:37:2018 1 in 30 &1 in 80
3.4 Camber in carriage way 2.5%
3.5 Slope in shoulder 3.0%
3.6 Super elevation Max. 7%
Whether minimum sight distance available both in
3.7 horizontal & vertical curve yes
Whether design of horizontal & vertical curve
3.8 enclosed Yes
What CBR values of sub-grade soaked & un-soaked
Existing Road width with Carriage way &
and at moisture content just after rainy season.
Present traffic intensity and likely increased in a next shoulder are app. 7.5m so No Required of
10 years in terms of C.V. above 3 tones capacity per
3.9 day CBR designed
100mm thick in full width of drainage layer
and 50mm thick in carriage way and
0.15mtr. offset extra in both side , 250mm
3.10 Sub-base nature of material & thickness thick wmm in 7.0m wide(Carriage way )
3.11 Base course nature of material & thickness 60mm DBM in 7.0m wide( Carriage way)
3.12 Wearing course 30mm BC in 7.0m wide( Carriage way)
4 DRAWING
4.1 Index Map --Inclosed--
4.2 Quarry Chart --Inclosed--
4.3 Lead Chart --Inclosed--
4.4 Linear chart --Inclosed--
Plan Bearing of every change point curves duly
marked with design data location of CD work plan of
NALLAH , Diversion of flow and size of structure duly
4.5 marked of plan Yes
L-Section
H- 1 cm.
4.6 V- 1cm.
4.7 Gradient Rulling 1 in 30
4.8 Classification of soil Ordinary
4.9 Cutting / Filling As per sheet
4.10 Ground Level As per OGL Sheet

5 C.D work
As per Detail of HPC pipe Culvert/ Slab
5.1 Location Culvert
5.2 Skew/Normal Normal
5.3 Design Discharge As per hydraulic calculation
5.4 Waterway provided
5.5 Design Load
5.6 Design of Abutment
5.7 Design of Pier
5.8 Design of Wing Wall
5.9 Design of cull of wall
5.10 Design of approach slab
5.11 Design of Deck slab
5.12 Ref. if any standard design has been
5.13 Whether there are any deviation from
5.14 Type of wearing Coat
5.15 Type of masonry
5.16 Pier cap reinforces plain CC
5.17 Whether weep holes provided
5.18 Whether rain water spout provided
5.19 parapet wall/ Railing
6 DRAWING ( C.D. Works )
6.1 Site plan Scale --Inclosed--
6.2 Contour plan --Inclosed--
6.3 L- Section of Nallah --Inclosed--
6.4 X- Section of Nallah --Inclosed--
6.5 Trial Pit Done and Inclosed
6.6 Plan of Structure
6.7 Section of structure
6.8 Details of Abutment
6.9 Details of Pier
6.10 Details of RCC Slab

7 LAND ACQUISITION
Land width & Area required as per Two
lane of road given by MP PWD., Mention in
7.1 Land width & Area required Right of Way
7.2 Existing land width or Area Availability 24.00m
7.3 Extra width land or area to be Required --No--
7.4 Provision for L.A. in the estimate No Required

8 SPECIFICATION ENVIRONMENTAL MANAGEMENT PLAN


8.1 Land clearing and operation
8.2 Cut ,Fill and Embankment Construction
Establishment of constructrtion camp., Temporary
8.3 office and storage area
8.4 Traffic Movement
Sourcing of construction material ( Soil, River
8.5 sand/Crusher sand, Aggregate)
8.6 Loss of productive Soil, erosion and lavd use change
8.7 Hydrology and Drainage
8.8 Compaction and Contamination of Soil
8.9 Construction debris and waste
8.10 Air and Noise Quality
8.11 Biological environment and Tree planting
Ground Water and Surface Water Quality and
8.12 Availability
Occupational Safety and helth hazards at work and
8.13 Camp sites
9 MISCELLANEOUS
8.1 Provision for Sign & Caution
Provision for Km. , Hectometer & Boundary stone
8.2 taken
8.3 Whether provision for diversion

Sub Engineer Sub Divisional Officer Executive Engineer


PWD Balaghat PWD Balaghat PWD Div. Balaghat

 
 
 
 
     