FABRICATION LAY OUT PLAN 1

NAGA
SUPERVISER
PIPE SHOP INCHARGE

229 185
QA QC /MTL CHEKER PIPE CUTTING & BEVEL QAQC/ DOCUMENT
202 - FITTER LEAD
227- FITTER ASST
GROUP - A
191 - FITTER FIRE WATCH
GROUP - B 41
101 - FITTER
WELDER
TACK WELDER 1
231 203
199
GROUP - C
20 - FITTER
GROUP - D GRINDER
043 - FITTER 131
CRANE OPERATER & LIFTER TACK WELDER
167 222
113
FABRICATION LAY OUT PLAN 1
NARESH SARA
SUPERVISER FITTER & WELDER SUPERVISER
PIPE SHOP INCHARGE

PIPE CUTTING & BEVEL


170 - FITTER LEAD
110 - ASST

FIRE WATCH
158 88 221
QA QC / MTL CHEKER QA QC / DOCUMENT

WELDER
GROUP- A 80
29 - FITTER TACK WELDER 242
163 34
GROUP - B 90
63 - FITTER
GRINDER
GROUP - C 225
160 - FITTER
TACK WELDER
218
GROUP - D
30 - FITTER
CRAINE OPERATER & LIFTER
270
128
LAY OUT PLAN 1
S / NO B.NO WORK POSITION
1 10 SUPERVISER (PIPE SHOP INCHARGE )
2 83 FITTER & WELDER ( SUPERVISER )
3 158 QA QC / MTR CHEKER
4 221 QA QC / DOCUMENT
5 170 PIPE CUTTING & BEVEL
6 110 PIPE BEVEL
7 29 FITTER
9 63 FITTER
11 160 FITTER
13 30 FITTER
15 163 TACK WELDER
16 218 TACK WELDER
17 80 WELDER
18 242 WELDER
19 34 WELDER
20 90 WELDER
21 225 GRINDER
22 270 GRAINE OPERATER
23 128 LIFTER
24 88 FIRE WATCH
LAY OUT PLAN 1
S / NO B.NO WORK POSITION
1 14 SUPERVISER (PIPE SHOP INCHARGE )
2 229 QA QC / MTL CHEKER
3 183 QA QC / DOCUMENT
4 202 PIPE CUTTING & BEVEL
5 227 PIPE BEVEL
6 191 FITTER
8 20 FITTER
10 230 TACK WELDER
111 1 WELDER
12 199 WELDER
13 203 WELDER
14 131 GRINDER
15 167 CRAINE OPERATER
16 113 LIFTER
TRADE LUMPSUM /
S / NO NAME BADGE NO FIN / IC NO WORK POSITION LSO NO
SUPPLY
CURRENT
PROJECT