Problem: Step 1
Problem: Step 1
Comment
2. Step 2 of 4
System flow chart of the existing system:
Physical internal control weakness:
• There is no credit check performed.
• The sales clerk closes up the open sales order reasoning the sale to be stored previous to
the merchandise are in fact transported.
• The clerk of warehouse has asset custody and is supposed not to as well keep posted the
inventory records.
• The shipping clerk does not bring together the stock release by means of the original
order. This agrees in support of the incorrect goods and or amounts to be transported.
• Customer is payable previous to the merchandise are transported. Statement should be
generated by shipping notice. As an alternative, the customer bill is printed from the closed
sales order, which was ready prior to the merchandise were transported.
Comment
3. Step 3 of 4
IT controls:
Input Control:
• Edit controls to identify office mistakes in key in information.
• Check Digit intended for authenticating Customers.
Processing Control:
• Error messages to indicate an account inequality.
• Flag control above low down store circumstances.
• Password control to limit right to use to record files and programs.
• Backup events to guard digital files.
Output Controls:
• Safety above allocation of journal vouchers and account summaries for GL reconciliation.
Comment
4. Step 4 of 4
Revised flow chart design:
• The inner control problems previously enclosed that require being acceptable in the latest
system.
• A system configuration like to figure 4-18 would be suitable.
Comment