ITEMWISE INVOLVEMENT OF MACHINERIES

Sl. Item of Work Name of No. Qty. of Capacity Ratio of Output/D No. of
Machine Works Involvem ay with 8 Days
ent working Require
hours
1. Constn. of a. Hydraul 5 11,000 60 CuM/hr. a:b:d:e 800 CuM 13.75
Embankment ic CuM =1.66:1.6 (Say) 14
with Earth Excavat 6:0.33:1 days
of 1
Cum
Bucket
b. Front 5 60 CuM/hr.
end
loader
c. Dumper 24 5.5 CumX6
per
Dumper
d. Dozer 1/3 300
D-80- CuM/hr.
A12
e. Vibrato 1 100
ry CuM/hr.
Roller
2. Picking up a. Rotovat 5426 25 CuM/hr. 200 CuM 13.56
and removing or CuM 25 CuM/hr. (Say) 14
road b. Front 2 days
materials end
loader
c. Dumper
3. Earthwork in a. Hydraul 1 1275 60 CuM/hr. a:b 480 CuM 2.65
cutting to ic CuM =1:1
form road Excavat
section in of 1
correct Cum
profile. Bucket
b. Front 1 60 CuM/hr.
end
loader
c. Dumper
4. Box cutting or a. Hydraul 1 4823 60 CuM/hr. a:b:d 480 CuM 10.04
filling in road ic CuM or =1:1:0.85
embankment Excavat 400Sq.M/h
(Depth of or 1 r.
cutting Cum
150mm) Bucket
b. Front 1 60 CuM/hr.
end
loader
c. Dumper
d. Smooth 0.85 70 CuM/hr.
wheele
d roller
5. Supplying, a. Front 1.66 1275 60CuM/hr. a:c:d 800 CuM 1.6
spreading and end CuM =1.66:
compacting loader 0.33:1
fine sand. b. Dumper
c. Dozer 1/3 300CuM/hr
.
d. Vibrato 1 100CuM/hr
ry .
Roller

6. Construction a. Tr. 2 4974 25 CuM/hr. a:b:d:e:f 400 CuM 12.43


of GSB Rotor CuM =2:2:0.08:
b. Front 2 25 Cum/hr. 1:0.83
end
loader
c. Dumper
d. Dozer 1/5 300CuM/hr
.
e. Motor 1 50 CuM/hr.
Grader
f. Vibrato 1 60 CuM/hr.
ry
Roller
7. WMM a. WMM 1 8914 25 CuM/hr. a:b:d:e 200 CuM 44.57
Plant CuM =1:1:0.5:
b. Front 1 25 Cum/hr. 0.41
end
loader
c. Dumper
d. Motor 2 50 CuM/hr.
Grader
e. Vibrato 2 60 CuM/hr.
ry roller
8. BM a. HMP 1 2485 40 CuM/hr. a:b:d:e:f 240 CuM 10.35
120 CuM =0.75:1.2:
TPH 0.75:1:1.2
b. Front 2 25 Cum/hr.
end
loader
c. Dumper
d. Sensor 1 40 CuM/hr.
Paver
Finisher
100TPH
e. Tando 1.33 30 CuM/hr.
m
f. Smooth 1.6 25 CuM/hr.
wheel
Roller
9. Primer a. Mech 1 49694 1250 a:b 10,000 4.96
Broom SqM SqM/hr. =1:1.4 SqM
b. Bitume 0.7 1750
n SqM/hr.
pressur
e
Distribu
ter
10 Tack Coat c. Bitume 1 49694 1750 14,000 3.54X2=
. n X2 SqM/hr. SqM 7.08
pressur SqM
e
Distribu
ter

11 Mix Seal a. HMP 1 965 40 CuM/hr. a:c:d 320 3.54


. 20MM 120 CuM/ =1:1:1.6
TPH 48,250
b. Dumper SqM
c. Sensor 1 40 CuM/hr.
Paver
Finisher
100TPH
d. Smooth 1.6 25 CuM/hr.
wheel
Roller
12 Mastic 25mm a. Mastic 1 1100 1 MT/hr. 10
. Cooker sqM