This document appears to be a bill of quantities for road construction works including pipe culvert construction and pavement works. It includes 22 line items with descriptions of work, units of measurement, quantities, and rates. The line items cover works such as excavation, masonry, concrete works, pipe laying, gabion works, earthworks, gravel and base laying, and bituminous works. The total estimated cost for all items is over [CURRENCY AMOUNT].
This document appears to be a bill of quantities for road construction works including pipe culvert construction and pavement works. It includes 22 line items with descriptions of work, units of measurement, quantities, and rates. The line items cover works such as excavation, masonry, concrete works, pipe laying, gabion works, earthworks, gravel and base laying, and bituminous works. The total estimated cost for all items is over [CURRENCY AMOUNT].
This document appears to be a bill of quantities for road construction works including pipe culvert construction and pavement works. It includes 22 line items with descriptions of work, units of measurement, quantities, and rates. The line items cover works such as excavation, masonry, concrete works, pipe laying, gabion works, earthworks, gravel and base laying, and bituminous works. The total estimated cost for all items is over [CURRENCY AMOUNT].
This document appears to be a bill of quantities for road construction works including pipe culvert construction and pavement works. It includes 22 line items with descriptions of work, units of measurement, quantities, and rates. The line items cover works such as excavation, masonry, concrete works, pipe laying, gabion works, earthworks, gravel and base laying, and bituminous works. The total estimated cost for all items is over [CURRENCY AMOUNT].
Pavement Works Item Name & Description Unit Quantity Official Rate
NA NA 1 1
Insurance for the loss of damage to works,
plant, material, equipment property and personnel injury or death and third party LS 1 50000
Maintainance of road for smooth traffic flow
by construction of diversion and management of traffic by traffic control with proper use of safety measures during working hours as instructed by the engineer. Job 1 20000
Supplying and Erecting informatory board
and name plate (contract details) in place including 50mm dia. steeel tube, 2mm thick steel plate sign board in place 1.2m.x 0.75m. Size bigger with back support and two or more post as instructed by the engineer all Complete as per Specification. [SS/SP-1501] Nos 2 7357.34
Earth work excavation for drain and
trenches in all type of soil including shoring, struting, bracing, sheeting and safe disposal all complete as per specification.[SS/SP-905] m3 112.75 150.79
Providing and laying dry stone solling
including dressing etc. with relavent lead and lift all complete as per specification . [SS/SP-2602,2603] m3 18.11 3868.23
Providing and placing cement concrete for
the non-structural elements including compaction, curing, testing and relevant lead etc. as per drawing all complete as per specification [1:2:4 (cement : sand : aggregate)][SS/SP-2000] m3 21.27 9681.33 Providing and laying Random rubble masonry in cement sand (1:4) mortar including scaffolding, curing etc. all complete as per Specification.[SS/SP- 2602,2603, 2607] m3 128.4 8323.5 Providing, mixing, and Pointing cement mortar over rubble masonry works in cement mortar [ cement(1) : sand(3)] including scaffolding, curing, preparation of mortar etc. complete, m2 54 254.54 Proving and laying RCC pipes of diameter 900 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement : 2 fine sand ) all Complete as per Specification. [SS/SP-908] Rm 10 9489.11 Proving and laying RCC pipes of diameter 600 mm (internal) with or without collars jointed with stiff mixture of cement mortar in the proportion of 1 : 2 ( 1 cement : 2 fine sand ) all Complete as per Specification. [SS/SP-908] Rm 20 7647.24
Fabrication of hexagonal mesh type 100mm
x 120 mm Gabion boxes / mattresses with diapharagms, with binding wire 12 swg, mesh wire 10 swg and selvedged wire 7 swg , including rolling, cutting and weaving ; assembling Gabion boxes mattresses, palcing in position including stretching, forming compartments; tying with bracing wires and tie wires; tying down the lid complete; and providing and filling stone / boulder in gabion boxes / mattresses etc. including dressing, beding, bonding and all transporation as per specification. [2401 ] m3 62.5 4953.78
Formation of embankment including
compaction in layers not exceeding 150 mm compacted depth, watering , rolling and transporting etc. all complete as per specification [SS/SP- 907 ] m3 2025 555.22
Loosening, leveling and Compacting original
ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve dry density as per Drawing and Technical Specifications. m3 397.6 38.89
Providing, Laying, Spreading, watering,
Leveling and compaction as per required camber of riverbed gravel for sub base course with all transportation all Complete as per Specification. [SS/SP-1201] m3 639 2165.44 Providing, laying, spreading, watering, levelling and compaction of crusher run materials for base course with relevant lead and lift all complete as per Specification. [SS/SP-1202] m3 468.6 2577.08
Providing and spraying bituminious prime
coat including cleaning the road surface using wire, brushes, broom etc. before applying prime coat all complete as per Specification. [SS/SP-1301, 1302] Lit 3124 109.05 Providing and spraying bituminious tack coat including cleaning the road surface using wire, brushes, broom etc. before applying tack coat all Complete as per Specification. [SS/SP-1301, 1302] Lit 2280.52 137.75
Providing, mixing, and laying asphalt
concrete with compaction all Complete as per Specification . [SS/SP-1307, 1308] m3 124.96 16393.72