Professional Documents
Culture Documents
Bhadra Mess 1 Bill
Bhadra Mess 1 Bill
Bhadra Mess 1 Bill
Food
S.N Creditor Purchased date Bill No
1
2 potato 45kg@25 5/1/2076
3 potato 22kg@25 5/10/2076
4 karkalo by nirmal 5/10/2076
5
7 Noodles-3pkt 5/17/2076
8 Garlic 4.5kg 5/20/2076
10 Cucumber 10kg@40 5/19/2076
10 Chichinda 1.5kg 5/20/2076
11 Cabbage-4kg @40 5/22/2076
10 Cucumber 7.5kg@50 5/22/2076
10 pumpkin 5kg@50 5/24/2076
10 potato 38kg@25 5/28/2076
10 Rayo and brinjal 10 +1.5 5/29/2076
10 Miscellaneous 5/29/2076
cucumber 17.5kg+raddish
10 5+cabbage 5+ cauliflower 5 5/31/2076
10 Bhango 5/31/2076
10 cucumber+barela+raddish 5/31/2076
3840 4500
awan
Meat
Amount Remarks S.N Paid To
1,150.0 mess
60.0 jagdish
500.0 mess
17,855.0
1,150.0
2,750.0
1,000.0
1,017.0
250.0
4,580.0
2,360.0
760.0
3,840.0
1,475.0
3,208.0
16,128.0
1,380.0
1,845.0
6,285.0
90.0
4,285.0
1,300.0
77,953.0
77,953.0
2,555.0
1,200.0
4,086.0
8,340.0
8,920.0
52,852.0
49.6
550.0
550.0 283.333333333333
355.0 242.857142857143
250.0
250.0
550.0
550.0
550.0
250.0
550.0
300.0
355.0
250.0
550.0
55.0
550.0
250.0
550.0
125.0
405.0
405.0
55.0
125.0
Meat
Purchased Date Bill No Quantity Amount Remarks
170.0
85.7
85.7
80.0
466.7
Sunam Infrastructure Nirman Pvt Ltd.
Upper Kalanga Gad Hydro Electric Project (38.46 MW)
S.N Name Designation Chhaak Rate Amount Breakfast Rate Amount egg Rate Amount Meat Total Previous Payable
Amount Amount Advance excluding adv.
Note :None of the remaining Stocks was not trasfered to the preceding month
Sunam Infrastructure Nirman Pvt Ltd.
Upper Kalanga Gad Hydro Electric Project (38.46 MW)