VIEC® Evaluation Information Request:

To evaluate if VIEC is the best solution for your company, we need the following information:

General:
Field Name: Project Status:

Implementation schedule: Expected Contract Award Date: Location of processing plant:


(when will the plant be built or the retrofit performed) (onshore, floating, fixed)

Problem Description/ expected results of VIEC installation:

Oil Data at Operating Conditions:


Density: Viscosity (Cp): Emulsion tendencies:
(None/Moderate/Strong)

Chemical Injection Rates: Foaming tendencies: Conductivity of Crude Oil Phase


(demulsifer and antifoam) (None/Moderate/Strong) (S/m):

Design and operational parameters of the separator


Pressure: Temperature: Total liquid level:

Separator size (IDxT/T): Crude and water retention time


(if available):

Separator design oil and water flow rates: Interface level w/ operating ranges: Variations in water cut and GLR*:
NIL:
NLL:
Expected production profile:
(E.g. water cuts to be considered)

Current separator performance:


Oil Quality: Produced Water Quality:

Please include the following documentation:


 PFD’s and P&IDs
 General Arrangement drawings including size, all internals and nozzle locations
 Separator data sheets
* GLR = gas liquid ratio

All information provided will be handled strictly confidential. The information will not be
used for any other purpose than described above, and willCONFIDENTIAL
SULZER not be sent to any third parties.