CEMENT CONCRETE/SAND/AGGREGATE(BAJREE)
COLUMN
C) 1' X 1' 4 0.30 0.30 3.20 1.15
PLINTH BEAM
A) 1' X 1.5' 1 61.59 0.30 0.45 8.31
BEAM
MAIN BEAM
B) 1 NO OF STORIES 61.59 0.30 0.45 8.31
1' X 1.5'
COLUMN
9 16MM DIA - 3.20 4 0.45 115.65
1' X 1.5'
BEAM
PLINTH BEAM
1 16MM DIA - 61.59 2 0.45 123.62
1' X 1.5'
1 12MM DIA - 61.59 4 0.45 246.79
MAIN BEAM 1 NO OF STORIES 16MM DIA - 61.59 2 0.45 123.62
1' X 1.5'
1 NO OF STORIES 12MM DIA - 61.59 4 0.45 246.79
VERTICAL TIES 2 8MM DIA 150MM C/C 1.40 411 0.08 1149.67
SLAB
ROOM SLAB 0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
BATH SLAB 2 12MM DIA 150MM C/C 2.13 18 0.15 77.97
2 12MM DIA 150MM C/C 2.74 14 0.15 77.97
CORRIDOR 0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
STAIR 1 12MM DIA 150MM C/C 1.00 24 0.15 24.15
1 12MM DIA 150MM C/C 3.60 7 0.15 24.15
BALCONY 1 12MM DIA 150MM C/C 1.00 24 0.15 24.48
1 12MM DIA 150MM C/C 3.65 7 0.15 24.48
Total Volume = 3221.60
TOTAL 16MM DIA REBAR IN LENGTH (METERS) 903 RM
TOTAL 12MM DIA REBAR IN LENGTH (METERS) 805 RM
TOTAL 8MM DIA REBAR IN LENGTH (METERS) 1538 RM