Professional Documents
Culture Documents
Design of Pilecaps
Design of Pilecaps
Y
DESIGN OF PILED CAPS X X
To determine that the Numbers of Piles and the Working Capcity
of Each Pile is Satisfactory
To determine Main Rebars for Pilecaps
Design Criteria
y X
(1) All loads for determination of pile nos to be based on Service Loads
(2) Assume all Piles to be same size and shape
(3) Assume all Piles are laidout in Symmetry about Y-Y and X-X axes
(4) All Forces vis: Vertical, Horizontal, Moments are at Pile Head level
(5) Horizontal Force can be resolved into Horizontal & Moment
(6) All Loads will be taken by Piles V
* Vertical Loads taken by Vertical Component My
* Horizontal Loads taken by Pile Head Shear and/or Raking components Hx
* Moments is taken by Vertical Opposing Reaction
Refer FIG 1
LOADINGS
Assume the following Loads are all Service Loads (without load factors)
Assume the Loads are Applied at Pile Heads Level P1
Any Horizontal Force will be translated to Moment & Shear at Pile Head Refer FIG 1
PILE SPACINGS
Assume Piles are spaced unifomly and centroid of pile group is at center
(for pile group not at centroid, calc to be made to determine centroid)
Assume Piles are of the same uniform size
Rotation about Y-Y (Consider y=1.5m)
* 2nd Moment of Area of Pile Group about Y-Y
> No of Piles in the Group (assume equal size) = N = 2 nos/1.5m run
Distance of each Pile from Centroid of Group
Pno X X2
P1 1.05 1.10 <-- Outer mosts
P2 1.05 1.10 <-- Outer mosts
P3 0 0.00
P4 0 0.00
P5 0 0.00
P6 0 0.00
P7 0 0.00
P8 0 0.00
4 4
*2nd Mom Area > 2.20 M (or Moment of Inertia) Iyy = 2.20 M
M * Xm
Pm =
Iyy
Where Pm= Load on Pile due to Moment
M= Applied Moment on Pile Group
Xm = Distance of Pile from Centroid
From above, M = 499.5 KNM
Xm = 1.05 M
4
Iyy = 2.2 M
>> Pm = 238.40 KN/ piles
Total Piles Loads Maximum Load = Pmax = P + Pm1 Pmax = 1463 KN/pile
REINFORCEMENTS
Check Analysis based on Truss Analogy
0.5* N * a
T=
d
Where
T= Tension in the bottom bars
N= Applied Ultimate Loads
a = dictance from edge of Column Load to Center of Pile
d = effective depth of beam or pile cap
Conside Per Metre Run
N N = 2126 KN
a refer dwg a = 0.65 M
d Pile depth - 100-50-25/2 (assume 25mm rebars)
* Pile Depth = 1800 d = 1.6375 M
T
Area of Steel = As As =
0.87 * fy
fy = steel yield assume 410N/mm2
As = area of stee/metre run As = 1054.36 mm2/m run
fcu = 30 N/mm2
b = 1000 mm
from above--> d = 1638 mm
Z' = 0.02646
from z' chart ---> Z = 0.95
Area of Steel
Mu
As =
0.87 * fy * Z '* d
fy = 460 N/mm2