Design, build and complete of a mosque of 3,000 students on the main campus of Universiti Malaysia Perlis

(UniMAP)

BILL C - EXTERNAL WORKS (All Provisional)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

ELEMENT NO 6 : SEWERAGE SYSTEM

Excavation

Trench excavation for 225mm diameter pipe starting


from ground level, grading bottom, earthwork support,
filling in above with material arising from excavation,
disposing of surplus excavated material and restoration
of surfaces

A Depth not exceeding 2.0m deep m 219

B Depth exceeding 2.0m but not exceeding 4.00m deep m 357

Pipeworks

Supply and lay 225mm diameter Vitrified Clay Pipe


(VCP)
pipe cut to length, lay and fixed with eletro fusion joint
including with supply of bends and fittings as specified
A m 576
laid and jointed in trench on and including crusher run
bedding, backfilling with selected material and well
compacted as specified, disposal of surplus excavated
material and complete with all necessary works

Connection To Existing Main Sewer Line

Labour and material for connection of 300mm diameter


A pipe to existing manhole / sewer line including make Item
good all work disturbed

Testing

Allow for testing and commissoning the whole of the


sewers and manholes, make good any defects and leave
B Item
in perfect working order to the entire satisfaction of the
S.O and the Authorities

TO COLLECTION

C/6/1
Design, build and complete of a mosque of 3,000 students on the main campus of Universiti Malaysia Perlis
(UniMAP)

BILL C - EXTERNAL WORKS (All Provisional)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

ELEMENT NO 6 : SEWERAGE SYSTEM (cont'd)

Back Drop Manhole (< 1.5m)

1200mm internal diameter precast R.C manhole`TYPE


A' constructed of 300mm thick grade 20/20 concrete
base with BRC A7 top and bottom, 50mm thick concrete
blinding form channel using 40mm thick hight Alumina
Cement Mortar, concrete benching, 150mm thick cast
insitu concrete surround, precast reinforced concrete
chamber ring with 12mm minimum internal lining of high
alumina cement mortar, stainless steel steps at 300mm
A No 2
c/c horizontally and vertically, precast R.C taper top
painted internally with 2 layer of coal tar epoxy, precast
reinforced concrete make up rings as required to match
top of manhole cover to finished surface level, heavy
duty ductile iron manhole cover and frame to
manufacturer's detail and specification and including all
necessary formwork, excavation, backfilling, compacting
and disposal of surplus excavated material.

Back Drop Manhole (> 1.5m)

1200mm internal diameter precast R.C manhole`TYPE


B` constructed of 300mm thick grade 20/20 concrete
base with BRC A7 top and bottom, 50mm thick concrete
blinding form channel using 40mm thick hight Alumina
Cement Mortar, concrete benching, 150mm thick cast
insitu concrete surround, precast R.C landing with
underside painted with 2 layers of coal tar expoxy (Rest
Platform at every 3m depth), precast reinforced concrete
chamber ring with 12mm minimum internal lining of high
B No 5
alumina cement mortar, stainless steel steps at 300mm
c/c horizontally and vertically, precast R.C taper top
painted internally with 2 layer of coal tar epoxy, precast
reinforced concrete make up rings as required to match
top of manhole cover to finished surface level, heavy
duty ductile iron manhole cover and frame to
manufacturer's detail and specification and including all
necessary formwork, excavation, backfilling, compacting
and disposal of surplus excavated material.

TO COLLECTION

C/6/2
Design, build and complete of a mosque of 3,000 students on the main campus of Universiti Malaysia Perlis
(UniMAP)

BILL C - EXTERNAL WORKS (All Provisional)

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

ELEMENT NO 6 : SEWERAGE SYSTEM (cont'd)

Collection

From Page C/6/1…………..

From Page C/6/2…………..

TO SUMMARY

C/6/3