: BRUHAT BANGALORE MAHANAGARA PALIKE 28
YELAHANKA ZONE
Est Rs.150.00 lakhs
5 Description of Item unit [No Tt [8] D | amy | Rate | Amount
No]
1 2 3 fats fet 7 3 10
1]KSRRB 200-8. Cleaning and grabbing
road land including uprooting rank
vegetation, grass, brush, shrubs,
saplings and trees of girth upto300mm
[by manual means, in area of thorney
jungle, removal of stumps, disposal of
unserviceable materials, stacking of
[serviceble materials within a lead of
100 metres from road boundary,
labour charges complete as per
specifications
IMORTH Chapter [Sam
[P.NO 1201. NO 48.12
2] 790:00) 2356] 3950.00) 6a 25596.0]
Basic rate rr)
AWB 2.8]
2 [Earthwork excavation for foundation al
lbuilaings, drains, Culverts, water supply
sanitary ‘tines and electrical conduits|
letier in pits or in trenches 1.5m.and
labove in width, in hard. soil not
lexceeding 1.5m.in depth including
Jeressing the bottom and sides of pts and|
lrenches, stacking the excavated. sol
clear from edges of excavation with lead!
lupto 50 m. after breaking of clods|
ng 7 tion
[P.No.S, No 24 of KPWP & IWTD SRI
2010-11) locum
[Cc Draine
3 Side i] 65500) i.00] 1.00] 655.0] aa
| [Nsige a] 790.00] 2.00] 2.00] 790.06]
For shoulder drains sol 250] 0.90] 030] 33.75
Basieratel T8000] 1478.75] 19400] 287,465.00
fAW-sx] ra]on
3. Description of em unit [No [ t ] 8] 0 | Qnty | Rate | Amount
No|
1 2 3 [ats fel 7 a 3 10
[Providing and Taying ta positon plain
Jcement concrete of mix 1:4:8 using
[40mm and down size graded granite
Jmetal machine mixed, concrete laid in
layers not exceeding 15 oms.thiok, well
lcompacted, in foundetion and plinth,
inciuding cost of all materials, labour
HOM machinery, curing complete as per]
[specifications. Specification No. KBS|
lata?
[paz 1Noaa [Gum
[CC crain_ 8 Side a] 65500) 090[ 015] 88.3]
Nsige a] 790.00) 0.90 0.5] _106.65|
For kerb stone bottom 2 | 730.00] 0.20| 0.10] 31.60]
For shoulder drains so] 250] 090] os] a6.
Basieratel 310109 243.55| 350028) 852,498:9
Difin cost of coment 3.50x40] 140.00
‘AW ax 250.29
IKSRB 4-64 + Providing and removing]
Jesntering shuttering, strutting, propping et,
land removal of form work for vertical
surface such as walls at any thickness,
including attached pilasters, busesses, plinth
land string courses cost ofall materials, labour
Jeomplete as per specitiaitons. Specification]
INo. KBS 4.62.
P1aiNo 431 [Sam
rain Side walle lea | 2485.00 100 __| 5740.00]
Wide + Side)=780 007655%1045.00) 5780.00) 19980] _1158/888.00,
Basic ratel 10509
‘AW as] 109
SRB 42.2 Providing and laying in
postion reinforced cement concrete of
nominal mic 11.5: with 20mm and
[downsize graded granite metal, machine
mbied concrete laid in ayers not
[exceeding 15ens thick, vibrated forall
works in foundation plinth and ground
oor eve for roof slabs, staircase intl,
retainingwals,retun walls, walls (any
thickness) including attached plasters
[columns pers abutments pillars,posts
struts, buttresses, string or lacing courses,
parapets.coping, bed blocks, anchor blocks
[pain window cis, iletset, including
[ost of all materasJabour, HOM of
[machinery, curing complete as per
specications. {excluding cost of steel,
fabrication and plastering)
[Specifistion NO KBSA.1, 46Description of tem
z
PNo 121 Wo 41d
Drain bottom stab 3] 244s; 09|_ 080
[Drain sidewalls 2| 1445.00] 0.9]
Basie rate| 65000]
Difin cost of cement 8.00x40| 320.00
AW 8%| 38672
Total] 5247.72
IKSRB492 - Providing HVSD. see (
|cold, Twisted } reinforcement for RCC
Jwork including straightening, cutting
lending, hooking, placing in position, lapping|
land / or welding. wherever required, tyin|
with binding wire and anchoring, to the|
lstjoining members wherever _necessa
complete as per design (aps, hooks and]
wastage shall not be measured and pid) cos
lor materials, labour, HOM of machinery
lcompete as per specifications. Specification
INo. KBS 4.53
pale 1No 446
For Drain
[Considering 70kg / Cum of RCC anty 37570] 7000
[ow say 263.00
Basic rate| 506%]
‘AW 8%] 432.9
G0 29
IKSRG 5-14: Providing and constructing
precast concrete solid blocks with
[cmpressive strength not less than
Skg/sqm with cement mortar 1:6
masonry (quoin, jamb, closer blocks)
with solid concreteblocks of size
[40x20%20ems confirming to 1S 2185)
2965 in superstructure Including cost
lof materials, labour charges,
scaffolding, curing complete as per
specifications.
P.NO 241. NO 5.27
Basic rate
AWwax
0]
‘030
ono
135360]
260.10
375.70) 5247 72
26299.00
263.00) 5636.48]
75.0]
er
4746600]w-
"Amount
Description of tem
2
KSRB.15.1.4 Providing lush pointing
[tosquare rubble,course or uncoursed
stone masonry with cement mortar
1:3 , 20mm deep, after raking joints to
[depth of 20mm nicely ining including
[cost of materials, labour, curing
[complete as per specifications
P.NO 97 1.NO 15.1
10
Basic rate
AWK
ICC Precast covering Slab for darin
10cm thick)
ata Rates Aproved south Zone
74500]
2350]
0
1.0
75:
125.
870.0
or Shoulder Drain
1205.0
71085 ,150.00
roviding and fing pre cast sold
vement concrete kerb stones made
ut of C.C.1:2:4 anafinished with
M 1:3 plastering and finishing.
utting, ete., complete
size 4503200x400mm
241NO 5.29.1
720.00)
580/045
1580.0
3511.1
2552 910,080.00
Basierate.
‘AWaK
GRE DS_ Farthwork excavation (in
leposited sol) and filing sides of
undation upto plinth in layers not
ceedingZOcms. In depth, compacting
zach deposited layer by ramming
fter watering with lead upto 1.5m
cluding cost of all labour complete
5 per specifications. Specification. NO
B52.9.9/29.10.1/21.1
NOG 1.NO 2.12
or Footpath Filing
2] 790.09
225]
0:30) 3555.00]
174.36
eri982.89
Balerate
AWEEa
sr Description af tem wit [No Tt [8] 0 | Gnty | Rate] Amount
No
1 2 3 [ats fel 7 a 3 10
12 [Providing and fixing MS greatings
as per detailed specifications as per
directions of Engineer in charge Nos
5 30.00] 800.00] 200000]
13 |RSRRB MB00-TH Seartjing top bituminous
Jurface or surface dressing or premix carpet
including picking up scartid materials,
sacking of old serviceable materials within a
ead of 100 meres by manual means includin|
Jost oF all labour charges complete as per
specifications. MORTH Chapter 3.
[P32 1 No 19.50, Sam
i] "300;00) 2159] 3450000] 17.28] 33616.09
Basicrate| 1a]
‘AW 8%] 129
Ta|RSRRB_NGOOD Earthwork excavation Dy
Jmanval means in hard sit involving an average
horizontal throw upto 2 meters and an averase
itt upto 0.5 m, excavated surface levelled an
sides neatly aresed, the disposed earth to be
evlled neatly after breaking of elods complet
las per specifications MORTH Chapter 3
Pa261No 19.2 [eum
af 435.00] 3350] 05| 75038) _7776l 38345.09
AWK] 676]
35)Providing, laying, spreading and]
Jcompacting graded stone aggregate to
wet mix macadam specification inclucin| =
Jpremixing the Material with water at OMC|
in mechanical mix plant cariage of mixed|
Material by tipper to site, laying in untorm|
layers. with paver in sub-base /base|
lcourse on well prepared surface and|
|compacting with vibratory rolle to achieve|
Ihe desired density /
p.443 1No20.18 [eum
al 256.00] 12.50] oo] 293.25
3] 180.00) 12.50[ 0.30] 623.00
316.25) 1061.64 37060437
Basierate| sea]
‘AW 8%] 7a
06164 Peoe
si Despont wnt Net] 8] BY ty] Rate] amount
na
1 z Ea Fo
Ve
7.5 tg0 88g per team for surtacas of
low and median porsiy espace
over trepared surface ot granir base
fain cube MC. 70. or. any. ote
amen mixes wth deel at oko pe
sam heated in bimen “boler ied
jin spray set excluing Gearing of od
utace)eclung cast of al matenas
laoour HOW of macrinares compet W,
|Per specifications iv oe
P.No.148, [No2t4 [San
BIL@EER EFS] 500259
3002.50] 7ael 372083395
Basicrate| 6007]
Awa] 555]
743]
T7|RSRRE S007. Providing and applying ta
Jat on the prepared black toped surfaces ai
Ske per 10 sqm heating bitumen in bor fed
with spray set (excluding. cleaning of road
Jsurtice) including of ost of all materials,
labour, HOM of machineries complete as pei
specifications. MORTH Chapters
IPNo 149, NOT [Sen
2| 790.00) 17.50] 38170.09
1817000] 2636 479,324.60
Basicratel 206]
AW 8x] +5]
Fe]
Te]RSRREMs00-15" Providing and Toying
bituminous macadar SOmum thick with 10-120]
[TPH hot mix plant producing an average out
lor 75 tomes per hour using crushed agrevates
lr spected grading premixed with bituminous
binder, transported to sit, ad over a previous
prepared surface with paver fniser 10 te
required ade, evel and alignment and eli as
pe Clauses 503.6 and $01.7 to achieve the
Jacsired compaction complete as pet
peicaions. MORTH Specification N.508
PINo.180, ING 27.73 [oom
i] 730.00) 11.50] 0.05) 458.25
458.25] 557537] 259052057]
Basic rate] S162)
‘Aw 8%] «1209oR
F 3 Description of Rem unit [No Tt | 8] 0] Qnty |] fate] Amount
No
zi 2 ai) eraee |e seet| em) amnz 3 3 0
@] [25] 5Se8 aaT I Fitng sate se
Jaense bituminous concrete 25 mm thick with
100-120 TPH batch type HMP producing an]
Jsverage outpet of 78 tonnes per hour using
Jrushed agaregates of specified grading
premixed with bituminous binder at 4.5 t0
for mix and filler, transporting the hot mix to
work sit, laying with hydrostatic paver
finisher with sensor conrl to the required
erade, level and signment, rolling with smooth
whee vibratory’ and tandem roles to achieve]
te desied compaction as per MORTH|
specification clause No, 500:8 complete inal
Jespects complete as per specifications
with 87100 grade bitumen
JPNo.151, INO2T207 loam
i] 790.00) 1150) 0025] 297.13}
227.13] 721357] 1638382.00
Basic rate] 667075]
‘AW 8%] _ 520.4
20|KSRR8 M00-13. Road Marking with
Hot Applied Thermoplastic
[Compound with Reflectrising Glass
[Beads on Bituminous Surface:-
Providing and laying of hot apaied
[thermoplastic compound 2.5mm
thick including reflectorising glass
lbeads at 250 gms per sqm area,
thickness of 2.5mm is exclusive of
‘surface applied glass beads streaks
fand holes complete as per
specifications
IMORTH Specification no. 803
P.NO 168 S1NO 24.15 [san
a 790.00] 020 316.00] 428.74 135488.19
Basicrate| 26700]
‘Aw 8%] 317]
FI
KSRRB 800-1, Painting two coats after
filing the surface with synthetic
[enamel paint in approved shades on
Inew plastered concrete surfaces,
with materials, labour complete as
per specifications,
IMORTH Chapters
IP.NO 166 SI, NO 240 Sam
2 730.00] 0.45 711,00] 45.50] 326349]
Basicratel #25
Aw sx] 3.4
459]5
Description of em unit [No [| 8 [- >] Qnty ] Rate] Amount
No]
1 z 3 [ets Pela a 3 10
22] Conveying Debris/earth upto a lead of 10K [CUT
km
[Gniy Vide Tem NODE 14
780583.27
23 |MiescaTaneous
AThctcal
Certficate:-
1. The workspat hasbeen inspected and the work if found to be necessary
2. The estimate is prepared as per the PWP&IWTD $R 2010-42
3. The Provision made in estimate are adequate ang é¥cential,.
4, The area comes under BBMP limits
5. This work i included in P.0.W for the year 2010811.
Engineer
Ny
Assistant Execut ee
Kodigehall Sub-Division
BBMP, Bangalore
Bidatid Rsk dy re
Yue (ce /sf zeit 7,
feel Engineer
Byatarayanapura Division
BBMP, Bangalore
(sor Lamy
Px20ig.... Moser. Rooaly
Theat
23. Gathn
2B-Bonl
“ne Mural, Exh Lodery ong