Implementation Plan: Shopeecard Enhancement Via Esb
Implementation Plan: Shopeecard Enhancement Via Esb
Implementation Plan
PHASE : Production
SCOPE : ShopeeCard enhancement via ESB
IMPLEMENTATION DATE : 6/13/2020
TELECON BRIDGE DETAIL : NA
LIVE ROLLOUT PLACE : Menara
The contents of this document / information remains the intellectual property of Maybank and no part of this is to be reproduced or transmitted in any form or by
any means, electronically, including photocopying, recording or any information storage and retrieval system without the permission in writing from the Information
Owner. The contents of this document / information are confidential and its circulation and use are restricted.
MAIN RFC :
RFC # Task/System/Area Responsibilities (PIC) Effective Date
1 C95735 ESB (Shopee Card Enhancement) Saiteja Sat, 13 Jun'20
2
3
4
5
Remarks
Implementation Plan
5 Sat, 13 Jun'20 12:00 AM Sat, 13 Jun'20 01:00 AM 1:00 ESB Migration Program – WMB Broker Deployment
Broker : MYESBP1 and MYESBP2 CMSA Team (Sofian/Runo)
6 Sat, 13 Jun'20 01:00 AM Sat, 13 Jun'20 01:30 AM 0:30 ESB Checkpoint #1 : Validation on program migrated ESB (Saiteja)
Live Test
** insert rows when required and copy formula (in Column G : Duration)
Note
1) Implementation activities should include critical checkpoints and live testing
2) To include / specify the back up of the system as part of the implementation activity
3) If there are variance in the applications, the hour by hour plan should be consolidated by the Technical PM/ Lead
List of Programs/JCL
No Program Name New / Existing Type Description of Change *Release Path Name *Destination Path / Library Name Checksum / MD5 Hash Value System
1
2
3
4
5
List of Scripts
No Script Name Function (Index / Alter) Description of Change *Release Path Name *Destination Path / Library Name Checksum / MD5 Hash Value System
1
2
3
4
5
Note
* Not applicable for mainframe system
No Start Time End Time (SLA Duration Activity Responsibilities (PIC) Remarks
with business)
Note:
1) To indicate other affected programs
Standby List
Note:
1) Escalation list includes Business and Technical
Escalation List
Unit/ Dept System Name Contact Number (ext and handphone) Email Address Remarks
Note:
Escalation list includes Business Technical
Escalation list can be defined based on Levels (e.g. Level 1 , Level 2 nd Level 3)
Cut over:
1) The status of critical checkpoint as part of cut over activity to notify the affected stakeholder;
Post:
1) The overall status of implementation activity to notify the affected stakeholder.
Acknowledgement
I hereby CONFIRM that the required signatories are completed and the Implementation Plan is REVIEWED and VALIDATED on 03/6/2020 .
The implementation activity is ready for deployment.
Prepared by: Reviewed and Validated by: Reviewed and Validated by:
Project Manager / Business Project Manager Technical Project Manager
Note
Email approval is also accepted