Federal Project Implementation Unit: Basic Labour & Material Rate

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

1

Governmentof Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Federal Project Implementation Unit


Janakpurdham, Dhanusha
BASIC LABOUR & MATERIAL RATE
DISTRICT : Dhanusha
Transportation @ 3 %
S.No. Description Unit District Rate Rate Remarks

1 Aggrigate >10 mm-Crushed Cum. 3,016 100.00 3,116.00 100.00 tax per
2 Aggrigate >10 mm-River bed Cum. 1,716 113.75 1,829.75 75.00 tax per
3 Aggrigate 10 mm-Crushed Cum. 3,120 100.00 3,220.00 100.00 tax per
4 Aggrigate 10 mm-River bed Cum. 1,820 113.75 1,933.75 75.00 tax per
5 Aggrigate 12 mm-Crushed Cum. 3,016 100.00 3,116.00 100.00 tax per
6 Aggrigate 12 mm-River bed Cum. 1,716 113.75 1,829.75 75.00 tax per
7 Aggrigate 20 mm-Crushed Cum. 3,016 100.00 3,116.00 100.00 tax per
8 Aggrigate 20 mm-River bed Cum. 1,716 113.75 1,829.75 75.00 tax per
9 Aggrigate 40 mm-Crushed Cum. 2,964 100.00 3,064.00 100.00 tax per
10 Aggrigate 40 mm-River bed Cum. 1,664 113.75 1,777.75 75.00 tax per
11 Aluminium paint Ltr. 510 15.28 524.88
12 Asbestos cement ridge cover Rmtr. 369 11.07 380.27
13 Asbestos cement sheet Sqm. 728 21.84 749.84
14 ASO Joint Tape laying Work. Rmtr. 720 21.60 741.60
Assistant lab equipment with
2,000
15 agar Hour 60.00 2,060.00 Ktm rate
16 Bamboo No. 286 8.58 294.58 30-40ft
17 Barbed wire 12 Bwg. Rmtr. 109 3.27 112.47 93/6
18 Barbed wire 14 Bwg. Rmtr. 120 3.58 123.18 93/10
19 Bhush Kg. 7 0.21 7.21
20 Binding wire Kg. 125 3.74 128.54
21 Bitumen Kg. 114 3.43 117.83
22 Bitumen paint Ltr. 166 4.99 171.39
23 Bitumen washer Nos. 3 0.09 3.21 35/100
24 Brick Aggrigate Cum. 2212.00 66.36 2,278.36 load Udayapur
unload
0.60/10 Km.*30 km
14
25 Brick Nos. 0.42 14.46 distance*2.50 kg
26 Brick Machine Nos. - - -
Carborundam
185
27 Stone(Sharpenning Stone) Nos. 5.55 190.55 Udayapur
28 Cement MT 17,680 530.40 18,210.40 Nepali other (OPC)
29 Cement primer Ltr. 450 13.50 463.50
30 Cement tile No. 172 5.14 176.74 2000/100
31 Cement tile ridge cover No. 187 5.61 192.81 3000/100
32 CGI Ridge Cover Rmtr. 197 5.90 202.70
33 CGI Ridge Cover colour Rmtr. 338 10.14 348.14
CGI sheet 26 (H) 0.41 mm
816
34 thick coloured(65kg/bandle) Sqm. 24.48 840.48 9390 /bandal
CGI sheet 26 (H) 0.41 mm
726
35 thick Plain(62kg/bandle) Sqm. 21.78 747.78 7410/bandal
CGI sheet 26 (L) 0.38 mm
368
36 thick plain Sqm. 11.03 378.80 6460 /bandal
CGI sheet 26 (M) 0.38 mm
494
37 thick colour(62kg/bandle) Sqm. 14.80 508.39 8670 /bandal
CGI sheet 26 (M) 0.38 mm
385
38 thick Plane Sqm. 11.54 396.39 6760/bandal
CGI sheet 26 (M) 0.38 mm
385
39 thick plane Sqm. 11.54 396.39 6760/bandal
CGI sheet 28 (H) 0.30 mm
742
40 thick colour Sqm. 22.26 764.26 7470/bandal

Prepared By : Checked By : Approved By :


2

Governmentof Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Federal Project Implementation Unit


Janakpurdham, Dhanusha
BASIC LABOUR & MATERIAL RATE
DISTRICT : Dhanusha
CGI sheet 28 (H) 0.30 mm
655
41 thick plane Sqm. 19.65 674.65 5830/bandal
42 CGI sheet Ridge Cover Rmtr. 197 5.90 202.70 60/rft
Chain Link 2"x2" mesh (10 Ktm rate(page5-
517
43 SWG G. I.) Sqm. 15.51 532.51 18)
44 Chapra paint Kg. 593 17.78 610.58
45 Chattai Sqm. 135 4.05 139.25
46 Clay tile No. 34 1.02 35.34
47 Clay tile ridge cover No. 35 1.06 36.42
48 Clip no 58 1.74 59.74 ktm Rate
49 Collapisible gate (60 kg/sqm.) Sqm. 5,283 158.49 5,441.69 125*60
50 Collection bag Nos. 23 0.68 23.56 Empity plastic bag
51 Crystallization seal Sqm. 551 16.54 567.99 previous year
52 Damp proof grade tarfelt Sqm. 146 4.36 149.96
53 Diesel Ltr. 95 2.85 97.85 73.5/1.13
54 Distemper Primer Ltr. 364 10.92 374.92
55 Distemper Washable Kg. 291 8.73 299.93
56 Door spring No. 312 9.36 321.36
57 Dori Kg. 146 4.36 149.96 naribal
58 Enamel Paint Ltr. 603 18.09 621.29
59 Enamel Primer Ltr. 364 10.92 374.92
60 Engineer Nos. 1,298 - 1,298.00
61 Expansion joint materials Sqm. 6,932 207.94 7,139.54
62 Expanded metal Sqm. 170 5.10 175.10
Fiber glass 1.20 mm thick
1,022
63 corgated Sqm. 30.66 1,052.66
Fiber glass 1.20 mm thick
616
64 ridge cover (0.60m width) Rmtr. 18.46 634.12 width=0.60m
65 Fire wood Kg. 17 0.51 17.67
66 Flooring stone 37mm thick Sqm. 884 26.52 910.52
G. I. plane sheet Gutter
426
67 0.50mm thick Rmtr. 12.78 438.80 width=0.60m
G. I.Colour plane sheet Gutter
707
68 0.50mm thick Rmtr. 21.21 728.41
69 Gavion wire commercial Kg. 104 3.12 107.12
70 Gavion wire Heavy coated Kg. 114 3.43 117.83
71 Gavion wire Light coated Kg. 104 3.12 107.12
72 Gavion wire Medium coated Kg. 109 3.27 112.47
73 GI plane sheet 26 gauge Sqm. 676 20.28 650.00
CGI sheet 26 (L) 0.35 mm
503
74 thick colour Rmtr. 15.08 517.89 ktm(page 31)
CGI sheet 26 (L) 0.35 mm
425
75 thick Plane Sqm. 12.74 437.44 ktm(page 31)
CGI sheet 26(H) 0.31 mm
383
76 thick plane Sqm. 11.50 394.93 ktm(page 31)
77 Glass 3 mm thick-Plane Sqm. 707 21.21 728.41
78 Glass 4 mm thick-Plane Sqm. 790 23.71 814.11
79 Glass 6 mm thick-Plane Sqm. 905 27.14 931.94
80 Gobar Kg. 4 0.11 3.85
81 Gravel (sand mixed) Cum. 1,508 45.24 1,553.24 (800+450)/2
82 Granite 20mm thick Sqm. 3,838 115.12 3,952.72
83 Gum Kg. 172 5.14 176.74

Prepared By : Checked By : Approved By :


3

Governmentof Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Federal Project Implementation Unit


Janakpurdham, Dhanusha
BASIC LABOUR & MATERIAL RATE
DISTRICT : Dhanusha
84 Handle No. 78 2.34 80.34 simple
85 Helper Nos. 715 - 715.00
86 Hinge 75 mm No. 42 1.24 42.84
87 Hinge 100 mm No. 47 1.40 48.20
88 Hinge 150 mm No. 62 1.87 64.27
89 Hold fast No. 52 1.56 53.56
90 Hydrolic Excavetor 0.35 Cum. Hour 1,200 36.00 1,236.00 Udayapur
91 Hydrolic Excavetor 0.63 Cum. Hour 2,704 81.12 2,785.12
92 Hydrolic Excavetor 0.80 Cum. Hour 3,224 96.72 3,320.72
93 Hydrolic Excavetor 1.32 Cum. Hour 5,408 162.24 5,570.24
93.1 Interlocking Block 50mm No. 28 0.84 28.84
93.2 Interlocking Block 60mm No. 30 0.90 30.90
93.3 Interlocking Block 80mm No. 38 1.14 39.14
94 Iron bolt Kg. 187 5.61 192.81 previous year
95 Iron strips Kg. 120 3.60 123.60
96 J-hook Nos. 60 1.80 62.12 140 /8
97 Khar Bdl. 28 0.84 28.92
98 Killa Kg. 114 3.43 117.83
Elastocret cementious
850
99 elastomeric water proofing Sqm. 25.50 875.50 page 49-4
100 Linseed oil paint Ltr. 135 4.05 139.25
101 Brass Lockingset 250-300mm. No. 1,735 52.05 1,787.05 12"
102 Main Polish Kg. 447 13.41 460.61
103 Marble chips 3 mm Cum. 16,380 491.40 16,871.40 38*2560
104 Marble power Kg. 85 2.55 87.55 ktm rate(page 48)
105 Marble tile 15mm Sqm. 3,692 110.76 3,802.76
106 Marble tile 25mm Sqm. 3,838 115.12 3,952.72
107 Micro silica Kg. 289 8.67 297.67 Ktm rate
Mixture Machine (0.20-0.28
494
108 Cum.) Hr 14.82 508.82
109 Mortice lock(Brass) No. 1,030 30.88 1,060.48
Mosquito proof net 18 mess
484
110 good(steel) quality Sqm. 14.50 498.10 w=.90m
111 MS angle Kg. 125 3.74 128.54
112 MS Black pipe 0.75" to 2" dia. Kg. 104 3.12 107.12
113 MS Black pipe(MNB 50-M) no 1,602 48.04 1,649.64
114 MS grill Kg. 166 4.99 171.39
166
115 MS grill 3*20 mm (15 kg/sqm) Kg. 4.99 171.39
MS grill 4.5*20 mm (21.5
166
116 kg/sqm) Kg. 4.99 171.39
MS grill gate 5*20 mm(35
3,900
117 kg/sqm) Sqm. 117.00 4,017.00
MS grill gate 5*25 mm(40
3,900
118 kg/sqm) M. sheet Sqm. 117.00 4,017.00
119 Different size MS plate Kg. 139 4.17 143.27 Ktm rate
10,004
120 MS Spiral Staircase Readymade Rmtr. 300.12 10,304.12 Ktm rate
121 Mud Cum. 416 12.48 428.48
122 Mud tile No. 34 1.02 35.34 previous year
123 Mud tile ridge cover No. 35 1.06 36.42 previous year
M10 Ready Mix Concrete Cum. 10,593 317.79 10,910.79

Prepared By : Checked By : Approved By :


4

Governmentof Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Federal Project Implementation Unit


Janakpurdham, Dhanusha
BASIC LABOUR & MATERIAL RATE
DISTRICT : Dhanusha
M15 Ready Mix Concrete Cum. 11,593 347.79 11,940.79
M20 Ready Mix Concrete Cum. 12,593 377.79 12,970.79
M25 Ready Mix Concrete Cum. 13,097 392.91 13,489.91
M30 Ready Mix Concrete Cum. 14,000 420.00 14,420.00
124 Nutbolt 8 mm. Nos. 187 5.61 192.81 180/10
125 Oxalic acid powder Kg. 120 3.58 123.18
126 Paint brush 100 mm Nos. 240 7.20 247.20 60 per inch
126.1 Parking Tile Sqm. 40 1.20 41.20
127 Pech killas No. 2 0.07 2.41 40,50,60mm avg
128 Petrol Ltr. 111 3.31 113.81 100/1.13
129 Plaster of Paris Kg. 22 0.65 22.49
130 Plastic emulsion paint Ltr. 676 20.28 696.28
Ply wood 12 mm thick Ktm
861
131 commercial Sqm. 25.82 886.62 rate(page25,15)
Ply board 19 mm thick
1,310
132 waterproof Sqm. 39.31 1,349.71
Ply wood 3 mm thick
270
133 commercial Sqm. 8.11 278.51
134 Ply wood 3 mm thick Teak Sqm. 624 18.72 642.72
Ply wood 4 mm thick
328
135 commercial Sqm. 9.82 337.42
136 Ply wood 4 mm thick Teak Sqm. 655 19.65 674.85
Ply wood 6 mm thick water
598
137 proof Sqm. 17.94 615.94
138 Polythine sheet 500 gauge Sqm. 52 1.56 53.56
Porecelain glazed/non glazed
1,071
139 tile Sqm. 32.13 1,103.33
140 Pre-leminated board Sqm. 646 19.36 664.96 6 mm

(Vertical post
3,444
Railing with 40 mm Ø ms pipe 2",Hand rail
141 handrail Rmtr. 103.32 3,547.32 1.5",Horizontal 1")
Railing with sisham wood
-
142 handrail - -
143 Rain seal paint Kg. - - -
Readymade colour concrete tile
I,,bambai,cadbari design floor 28
144 tile(10"x10"x1.5"=40.00rs no 0.82 28.37 previous year
145 Red oxide Paint Ltr. 350 10.50 360.50
146 Red oxide Primer Ltr. 450 13.50 463.50 UD
147 Road roller 8-10 M.T. hr 900 27.00 927.00 UD
148 Road hand roller 1.0 M.T. hr 300 9.00 309.00 UD
149 Rolling Shutter Sqm. 3,900 117.00 4,017.00 315.00 sft
150 Roofing nail Kg. 150 4.50 154.50
151 Rubber bidding -
152 Sand aurhi khola Cum. 1,248 107.25 1,355.25 75.00 tax per
153 Sand crusher(Badahari khola) Cum. 1,560 107.25 1,667.25 75.00 tax per
154 Sand mixed gravel Cum. 1,508 45.24 1,553.24 (450+800)/2
155 Sand paper Nos. 12 0.36 12.36
156 Self Taping Screw 3" Nos. 9 0.25 8.75 previous year
157 Silica cement Kg. 338 10.14 348.14
158 Skilled Nos. 1,034 - 1,034.00

Prepared By : Checked By : Approved By :


5

Governmentof Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Federal Project Implementation Unit


Janakpurdham, Dhanusha
BASIC LABOUR & MATERIAL RATE
DISTRICT : Dhanusha
159 Spartik non glazed tile Sqm. 1,019 30.57 1,049.77
160 Spiral stair case Rmtr. 10,004 300.12 10,304.12 previous year
161 Sprit Ltr. 83 2.49 85.69
162 Square pipe1"x1" Kg. 73 2.19 75.19
73
163 Square rod 12mm Ø solid core Kg. 2.19 75.19
Stainless Steel 50mm dia
Handrail in 2.00m.distance with
50mm dia.vertical post & 3
layer Horizontal 25mm
dia.stainless steel member ,2.5'
to 3' height Railing with Painting
164 & fixing. Rmtr. 4,254 127.60 4,381.20
164A Stainless steel pipe 25 mm Ø Rmtr. 243 7.29 250.29 Ktm rate
165 Stainless steel pipe 30 mm Ø Rmtr. 310 9.30 319.30 Ktm rate
166 Stainless steel pipe 38 mm Ø Rmtr. 376 11.28 387.28 Ktm rate
167 Stone block Cum. 2,444 73.32 2,517.32 100.00 tax
168 Stone bond Cum. 2,080 62.40 2,142.40 100.00 tax
169 Sub engineer Nos. 960 - 960.00
170 Sunmica board Sqm. 478 14.35 492.75 8*4=32.00sqft
171 Super plasticiser Ltr. - - -
2,288
172 Surkhee Cum. 68.64 2,356.64
173 Tarfelt Sqm. 146 4.36 149.96 2200/18
174 Tarpaintain oil Ltr. 135 4.05 139.25
175 Terrazo tile 20 mm thick Sqm. 718 21.52 739.12
176 Teak ply 12mm Sqm. 1,050 31.50 1,081.50
177 TOR/TMT reinforcement bar M.T. 89,000 2,670.00 91,670.00 (70+72+73)/3
178 Towerbolt 100 mm No. 60 1.80 61.80
179 Towerbolt 150 mm No. 100 3.00 103.00
180 Towerbolt 300 mm No. 180 5.40 185.40
181 U-nail Nos. 2 0.05 1.84 125/70
182 Unskilled Nos. 715 - 715.00
1,716
183 UPVC roofing sheet 3 mm thick Sqm. 51.48 1,767.48
UPVC roofing sheet ridge
1,925
184 cover Rmtr. 57.75 1,982.75 previous year
185 Varnish paint Ltr. 338 10.14 348.14
186 Vibrator Hour 286 8.58 294.58
187 W.P.Compound Kg. 104 3.12 107.12
188 Water Ltr. 0 0.01 0.40
189 Water proof cement paint Kg. 88 2.65 91.05 asian
190 Water pump Hour 343 10.29 353.49 5 H.P.
191 Weather proof paint Kg. 830 24.90 854.90
192 Weather proof primer Kg. 450 13.50 463.50
193 White cement M.T. 57,200 1,716.00 58,916.00 40kg/ bag
194 White lime Kg. 23 0.69 23.69 5kg/ bag
195 Wood Gamhair Cum. 62,508 1,875.22 64,382.77 previous year
196 Wood Local Cum. 57,200 1,716.00 58,916.00 35.31*1000
197 Wood preservative paint Ltr. 364 10.92 374.92
198 Wood Sal Cum. 223,080 6,692.40 229,772.40 35.31*4000
199 Wood Sisham Cum. 121,264 3,637.92 124,901.92 35.31*1500
200 Wooden listies ½" Rmtr. 8 0.22 7.86

Prepared By : Checked By : Approved By :


6

Governmentof Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction

Federal Project Implementation Unit


Janakpurdham, Dhanusha
BASIC LABOUR & MATERIAL RATE
DISTRICT : Dhanusha
201 Wooden listies ¾" Rmtr. 14 0.42 14.62
202 Wooden listies 1" Rmtr. 16 0.49 16.87
203 Wooden listies 1½" Rmtr. 26 0.78 27.04
204 white putting Kg. 60 1.80 61.80 Ktm rate
25 mm thick roofing tile butta
plaster in cement sand (1:4) 623
205 work Sqm. 18.69 641.69 Ktm rate

Prepared By : Checked By : Approved By :


7

Governmentof Nepal
Ministry of Urban Development
ment of Urban Development & Building Construction

Project Implementation Unit


Janakpurdham, Dhanusha
SIC LABOUR & MATERIAL RATE
F / Y : 2076/077

District Rate Code

27-KHA
26-KHA
27-KHA
26-KA
27-KHA
26-KHA
27-kha
26-kha
27-ga
26-ga
152
67.00
66.00
UD-13-01

74
48
47
UD-09-19
31
167
156
65

Cons.m-3

UD-28-10
Cons.m-12
UD-27-02
70
71
UD-14-07

61-ga

63-ga

UD-14-03

UD-14-05

UD-14-02

UD-14-02

61-gha

Prepared By : Checked By : Approved By :


8

Governmentof Nepal
Ministry of Urban Development
ment of Urban Development & Building Construction

Project Implementation Unit


Janakpurdham, Dhanusha
SIC LABOUR & MATERIAL RATE
F / Y : 2076/077

61-nga
UD-14-07

165
78
68
69
2072-2073
52
138

185

149
150
42
76
159
149
23
211-i
SI-06-17
62

62
93
28-kha

63-Kha

63-Kha
44-i
44-ii
44-iii
44-Ii
63-ga

110-ka
110-kha
110-gha
144
24
136
146

Prepared By : Checked By : Approved By :


9

Governmentof Nepal
Ministry of Urban Development
ment of Urban Development & Building Construction

Project Implementation Unit


Janakpurdham, Dhanusha
SIC LABOUR & MATERIAL RATE
F / Y : 2076/077
39
Worker D-1
36-ka
36-kha
36-gha
35

16-i
16-ii
16-iii



33

64
73
32

Ktm rate
158
Ktm rate(page40)
119
117

126
127

18
41
58-ii
54
255
Udayapur rate
49
49-ka

49--kha

51

51
page4

2075-2076
14
68
69

Prepared By : Checked By : Approved By :


10

Governmentof Nepal
Ministry of Urban Development
ment of Urban Development & Building Construction

Project Implementation Unit


Janakpurdham, Dhanusha
SIC LABOUR & MATERIAL RATE
F / Y : 2076/077

33
118.00
UD-27-24

34
08/05/2073
160
154

112-ga

111-ka
113-ka
111-kha
113-kha
112-ka
183
122
Ktm rate

Udayapur

gaighat
UD-27-14
UD-24-58
UDAYAPUR

50
UD-15-14

cons.m-2
cons.m-1
24
UD-27-25
SI-21-21
189
3

Prepared By : Checked By : Approved By :


11

Governmentof Nepal
Ministry of Urban Development
ment of Urban Development & Building Construction

Project Implementation Unit


Janakpurdham, Dhanusha
SIC LABOUR & MATERIAL RATE
F / Y : 2076/077
124
Ktm rate
166
UD-05-10
UD-05-09

215

20
21
24
79
187
C0NS.M.-6
185
120
121
UD-17-17
29-30
UD-11-06
UD-11-06
UD-11-06
UD-05-04
Worker D-1
196-i

SI-21-26
155
19
116
15
151
14
UD-27-30

147
148
siraha
84
149
81
82
114-ka

Prepared By : Checked By : Approved By :


12

Governmentof Nepal
Ministry of Urban Development
ment of Urban Development & Building Construction

Project Implementation Unit


Janakpurdham, Dhanusha
SIC LABOUR & MATERIAL RATE
F / Y : 2076/077
114-kha
114-ga
114-gha

Prepared By : Checked By : Approved By :

You might also like