Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

PMS-KARYAMAS ADNINUSANTARA No.

TSPD-QA/TI/2018/09/09
TECHNICAL SUPPORT & PEOPLE DEVELOPMENT TECHNICAL INFORMATION
Analysis Of Problem

√ DILAKSANAKAN SENDIRI HANYA SEBAGAI INFORMASI

REGION ESTATE WORK ORDER REPORT NO. REPORT DATE STATUS


SINTANG SJNE 21-1-2020 FINISH
(No.TI) ( DD-MM-YY )

UNIT MODEL UNIT CODE NO. COMPONENT NAME TROUBLE DATE (ddmyy)

H I N O 3 0 0 T R U K 2 7 S K S E R L S B E A R I N G 2 0 1 9
CHASSIS NO. COMPONENT MODEL COMPONENT CODE * ACTION DATE (ddmmyy)
2 5 1 0 2 0 1 9
SMR (HM/KM) COMPONENT SERIAL NO. COMPONENT LIFETIME STANDARD LIFETIME OVH FINISH DATE (ddmmyy)
2 3 3 2 9 2 5 1 0 2 0 1 9

PROBLEM
Pedal Kopling keras

MAIN PART CAUSING THE PROBLEM (PART NO.) PART NAME BRAND

FAILURE CODE **
Bent (Bengkok) v Broken (Rusak) Cracked (Retak) Leaking (Kebocoran) Shorted (Koresleting) Worn Abnormal
(Keausan Abnormal)
REPORT SUDAH HARUS DIBUAT MAKSIMAL 2 HARI DARI AWAL BREAKDOWN (UNTUK KEPERLUAN CLAIM)

Blocked (Buntu) Burnt (Terbakar) Dirty (Kotor) Twisted (Melintir) Other :……………………..
Low Power(Kurang Tenaga)

ANALYSIS ( Uraikan detail kerusakan,data pendukung, Root Cause Analysis, LAMPIRKAN Foto & Gambar, Jika tidak mecukupi gunakan Continuation Sheet)

CAUSE **
Mis Assembly (Salah Pemasangan) Bad Material (Material Buruk) Mis Application (Kesalahan Aplikasi) Bad Infrastructire (Infrastruktur Buruk)

Poor Torque (Torsi Lemah) Mis Maintenance (Salah Perawatan) Mis Operation (Kesalahan Operasi) Fatigue Fracture (Patah Lelah)

Bad Welding (Pengelasan Buruk) Mis Adjustment (Salah Penyetelan) Over Loaded (Kelebihan Beban) Out Of Adjustment (Kurang Penyetelan)

Poor Durability (Daya Tahan Lemah) Substandard (Kualitas dibawah standar) Dirty Fuel (Bahan Bakar Kotor) v Othe Masa usia komponen

CORRECTION MADE **
Repair (Perbaikan) v Replace Comp Assy Calibration (Kalibrasi) Warranty Claim Reinforce (Penambahan Material)
Retorque (Pengencangan
Ulang)

Adjust (Penyetelan) Replace Part (Ganti Part) Out Site Repair (Perbaikan Site Modif (Modif Internal) Other :……………………..
Rebuild (Membangun Ulang)
External)

REMARK ** EFFECTIVE REPAIR DURATION


v Finish Not Finish , Due To:……………………………. 4 hours

Prepared By: Approved By:


NIK 1 9 0 3 6 MECH LEVEL CHECKED DATE: APPROVED DATE:

MECHANIC NAME: MUNIR MUSTAQIM CHIEF MECHANIC / SUPERVISOR NAMES R Padang ASSET MANAGER NAME:

SIGN: SIGN: SIGN:

Note :
* Diisi sampai level terendah sesuai ellipse.
** Diberi tanda V untuk option yang dipilih.
REPORT SUDAH HARUS DIBUAT MAKSIMAL 2 HARI DARI A

diisi oleh Group Leader/Supervisor/Planner. Page 1 of 2


`
PMS-KARYAMAS ADNINUSANTARA No. TSD/TI/18/001

REPORT NO.
TECHNICAL SUPPORT & PEOPLE DEVELOPMENT
TECHNICAL INFORMATION
CONTINUATION SHEET
(No.TI)

UNIT MODEL SERIAL NO.

UNIT CODE NO. COMPONENT NAME

ANALYSIS (Penjelasan Tambahan, Data Pendukung, Root Cause Analysis, dan Rekomendasi Preventive Action)
REPORT SUDAH HARUS DIBUAT MAKSIMAL 2 HARI DARI AWAL BREAKDOWN (UNTUK KEPERLUAN CLAIM)

PHOTOGRAPH & DRAWING


REPORT SUDAH HARUS DIBUAT MAKSIMAL 2 HARI DARI AWAL

Page 2 of 2