Phase 1: 1 Masonry/Concreting Gravel 3/4 (Gravel Bedding Well Compacted)
Phase 1: 1 Masonry/Concreting Gravel 3/4 (Gravel Bedding Well Compacted)
PHASE 3
4 Painting Works
Epoxy Painting ( Basketball Court lines) Pail 8.00 1,125.00 9,000.00
Read Lead Primer ( Trusses) gal 20.00 525.00 10,500.00
Paint Thinner gal 128.00 520.00 66,560.00
Paint Brush 2" pcs 8.00 65.00 520.00
Paint Brush 4" pcs 4.00 65.00 260.00
Waste Cloth klgs 4.00 85.00 340.00
Painting Labor cost 43,590.00
DIRECT COST 130,770.00
OVERHEAD, CONTIGENCIES AND MISCELLANEOUS (6% OF DIRECT COST) 7,846.20
CONTRACTORS PROFIT ( 10% OF DIRECT COST) 784.62
TAX 12% OF (DC+O.C.M+CP) 16,728.10
Phase 3 Construction Cost 156,128.92
Phase 1 Construction Cost 925,759.25
Phase 2 Construction Cost 309,742.27
Phase 3 Construction Cost 156,128.92
Total Construction Cost 1,391,630.44