Galan Park and Recreation Project Proposal

Admas University
Department of Accounting and Finance
Assignment of Project Proposal

Title: Galan Park and Recreation Project Proposal

Submitted by: Abdi Olana


ID NO:1102/17
Section: 3DAE6

Submitted to: Mr.


1. Executive Summary/Introduction

Galan Park and recreation will established in the year 2010 EC. by Galan
Private Limited Company. The purpose of the business plan is to assist park
management and staff at Galan Park in making decisions regarding the
management, operation, and development of park resources. This plan
focuses on the financial impacts of management decisions. Information
from this document will be used to inform Galan park management and
Galan legislators of financial impacts at Addis Ababa city.

2. Background of the project

Galan Park was established in 201o, 2 years after the Bureau of Addis
Ababa a built the reservoir as part of the Addis Ababa River and River side
Project. The reservoir is located off of Expressway, next to the city of Galan
(population 500,000), ½ hours east of Addis Ababa City and 2 hours from
Adama, Oromia. Expressway is a main corridor from Addis Ababa to
Adama City. The reservoir has over 23 meters of sandy shoreline and rests
at approximately 1000 feet above sea level. Many of its formations and
geologic features are similar to Lake Langano, but with a shorter “warm
season” limiting peak visitation to the summer months (late June – early
September).
The park provides for a variety of experiences with six campgrounds and
open “boat camping” on many of its shores. Table 1 summarizes the park
facilities and services currently available at the park.

A-2
Galan Park and Recreation Project Proposal

Table 1.—Galan Park facilities and services


Feature/service Description
30 developed campsites for recreational
Mountain View vehicles, tent trailers, or other campers
Campground looking for full hookups. Showers and
flush toilets are provided.
Designated for “tent campers” and is
located on the water’s edge near the
Beach Campground
main entrance and boat launch.
Showers and flush toilets are provided.
A primitive campground that allows
boaters to park their vehicles and boats
Winners Bay
at the water’s edge. Vault toilets and
Campground
community water sources are all that
are provided.
A primitive campground remotely
located on the west side of the reservoir.
This is a popular spot for boaters who
Rabbit Gulch can park their vehicles next to their
boats right on the water. Vault toilets
and community water sources are all
that are provided.
A primitive campground designated for
OHV users. The campground is located
remotely from the main
Knight Hollow
entrance/campground at the northeast
Campground
end of the reservoir. Vault toilets and
community water sources are all that
are provided.
Juniper Point A primitive but very secluded
Campground campground up on a cliff overlooking
the reservoir. Campsites are dispersed
among pinyon and juniper pine trees,
with only vault toilets and community
water.
Currently, OHV trails are limited to
approximately 15 acres within the park,
but talks with the county and other State
OHV trails
agencies are taking place to connect the
park’s trails to an extensive trail system
nearby.
There are many spectacular views along
the reservoir, but limited hiking and
Biking/hiking trails biking trails. Staff is currently working
with the city of Duchesne to link the trail
to downtown.
Because of its vast “sandy” shoreline,
boat camping has become very popular
with boaters along the Wasatch Front.
Boat camping – shoreline
Galan Park is seen by staff as having the
potential to become a “short seasoned”
Lake Langano.
Galan Park is known as a premiere
location for walleye fishing, with
Fishing professional tournaments being held
there every year. Ice fishing is also
becoming more popular.
Wake boarding, water skiing, pleasure
Boating activities boating, and wave runners are very
popular during the summer months.
Accommodates up to 50 people and
Overnight group-use area includes a pavilion, barbecue grills, and
vault toilets.
Showers, restrooms, waste disposal,
Amenities
picnic tables (day use), boat launching.

A-4
Galan Park and Recreation Project Proposal

3. Business Location

Name: Galan Park and recreation PLC

Address:

Region; Addis Ababa


Town; Addis Ababa
Head Office; Bole Subcity
Woreda; 09
Area; Around Goro Timihrt Bet
Mobile; 0921835853/0949074132

Location, site and environmental of Galan Park and Recreation;


 Is central for the for regional’s and any areas
 The current expansion of the town to different direction
 Availability of transport. Since it is the gate way of the town and
around cites so that easy and fast to transport the required material.
 Availability of utilities

4. Duration of the project

The project will stay for three years in its first schedule.

5. Beneficieries

 Foreigners which comes across the city for visitation


 Recreation for the youngest and sport area
 Researchers and teachers
 The employees are also our stakeholders
 Entrepreneurs and innovators
 Natural resources sustainability
 Affordable, safe, and accessible recreational activities.
 Provide quality outdoor recreational experiences through camping,
boating, fishing, biking, hiking,
7.General objective
 To assist park management and staff at Galan Park in making
decisions regarding the management, operation, and development of
park resources.
 This proposal will focuses on providing full service with an emphasis on
convenient markets for Galan Park and Recreation, as well as, economic
development for the the company and country.

Specific Objectives
 Increase overnight camping revenue (number of visitors and nights
stayed)

 Increase day-use revenues and visitation

 Increase fishing activities and revenues

Mission, Vision, Values, and Objectives

The mission, vision, values, and objectives of Galan Park are as follows:

Mission
Enhance the quality of life through outdoor recreation, leisure, and
educational experiences.

A-6
Galan Park and Recreation Project Proposal

Vision
Provide quality outdoor recreational experiences through camping,
boating, fishing, biking, hiking, and off-highway vehicle (OHV) trails.

Values
Value meeting customer needs; innovation; clean and well-maintained
facilities; preservation of natural surroundings and resources; affordable,
safe, and accessible recreational activities.

7. Justification of the project

Galan Park is staffed by full-time, seasonal, and volunteer employees.


Table 2 outlines the parks staffing plan. Galan’s competitive edge is its large
water surface area with 23+ meters of shoreline within 2 hours of a major
population area. The area needs to accommodate a broad range of
recreation opportunities to attract users with different expectations. The
mix of uses, associated facilities and management capabilities have to be
financially sound.

Table 2.—Personnel plan

Perio Perio Perio


d d d
(CY0 (CY0 (CY09
Position Primary duties 7)1 8) )

Park  Oversees all operations Jan- Jan- Jan-


Manager  Budgeting and purchasing Dec Dec Dec
ETB58,000  Financial reporting
 Law enforcement
 Boating patrol and emergency
response
 Facility maintenance

 Assists Park Manager with


Park/Waterw administrative duties
ay  Law enforcement Jan- Jan- Jan-
Supervisor  Boating patrol and Dec Dec Dec
ETB45,000 emergency response
 Facility maintenance

 Law enforcement
Park Ranger  Boating patrol and Jan- Jan- Jan-
ETB42,000 emergency response Dec Dec Dec
 Facility maintenance

Deputy Park  Law Enforcement


Jan- Jan- Jan-
Ranger  Boating patrol and
Dec Dec Dec
ETB25,000 emergency response

This is a volunteer position.


Duties include collecting
May- May- May-
Camp Host camping fees and maintaining
Sep Sep Sep
campgrounds, day-use areas,
and restrooms.

Full-time seasonal who


Park Ranger
primarily helps with park Apr- Apr- Apr-
Aide
maintenance and manning the Oct Oct Oct
ETB12,000
entrance station.

Park Ranger Planned to be used to help Apr- Apr-


Aide maintain increased use of Oct Oct
$12,000 Knight Hollow (OHV users) and
Rabbit Gulch depending on

A-8
Galan Park and Recreation Project Proposal

available funding and trail


development.

An additional seasonal to help


Park Ranger maintain expanded
Apr-
Aide campgrounds and facilities.
Oct
ETB12,000 Will be funded with revenue
collections.

1
CY = calendar year.

Galan Park has identified several “partners” or other organizations with a


mutual interest in the parks operation and success. Table 3 specifies
existing and potential partners and their roles in the operation and
improvement of the park.

8. Community involvement

Stakeholder analysis is an essential part of developing a useful


Engagement of any project Plan. A common method of stakeholder
analysis is a Stakeholder Matrix. This is where stakeholders are plotted
against two variables. These variables might be plotting the level of ‘stake’
in the outcomes of the project against ‘resources’ of the stakeholder.
Another is the ‘importance’ of the stakeholder against the ‘influence’ of
the stakeholder. There will be stakeholders appearing to have a high
degree of influence on the project, who are also of high importance for its
success. There may also stakeholders of high importance to the success of
the project, but with low influence. It implies that they will require special
initiatives if their interests are to be protected. This implies that the
implementing organization will need to construct good working
relationships with these stakeholders, to ensure an effective coalition of
support for the project. There may be stakeholders that directly or
indirectly influence or influenced by this project but they have low
influence on, or importance to the project objectives. There are many
stakeholders for this projects like
1St These are stakeholders appearing to have a highest degree of
influence on the project, who are also of high importance for its success.
This implies that the implementing organization will need to construct
good working relationships with these stakeholders, to ensure an
effective coalition of support for the project.
Stakeholders under these categories for our project are the following:-
 Manager of the project
 Senior officials
 Sub-cities education Bureau
 Woreda 03 Revenue authority offices
 Shareholders of the project
 Ethiopia education agency
 Ministry of education
 City administration
 Any government bodies
 Employees
 End users are some of them
2nd. Stakeholders of high importance to the success of the project, but
with low influence. This implies that they will require special initiatives
if their interests are to be protected. Stakeholders under this category for
my project include the following sectors:-
 Indigenous people
 All beneficiaries from the new services of this project

3rd. These are stakeholders with high influence, who can therefore affect
the project outcomes, but whose interests are not necessarily aligned
with the overall goals of the project. Stakeholders for this project under
these sectors of stakeholder’s analysis Matrix are the following:-
 financial administrator
 Any expert that exercise over fund disbursements

A-10
Galan Park and Recreation Project Proposal

N.B Stakeholders under this categories are the sources of


significant risk, and uncertainty in the project life cycle .So, they
will need careful monitoring and management.
4th.The stakeholders in this box, with low influence on, or importance to
the project objectives, may require limited monitoring or evaluation, but
are of low priority. Stakeholders under these parts are any stakeholders
that directly or indirectly influence or influenced by this project but not
included under the above Boxes and they have low influence on, or
importance to the project objectives, so we not to worry about them
since they require limited monitoring and evaluation.

Table 3.—Galan Park partners

Partner Potential or existing role

 Governing agency
 Planning and design
Reclamation
 Funding participant for new
development

 Horizontal work - building roads, boat


storage, etc.
 “Vertical” work (i.e., electrical,
National Guard
plumbing) on bathrooms and other
structures being renovated or
constructed

 Partially fund and build walking/biking


City of Duchesne
trail from downtown to park trails

 Work with landowners and other


County of Duchesne agencies to connect Galan Park OHV
trails with other trail systems

Local OHV associations  Work with county and park staff to


connect Galan Park OHV trails with
other trail systems

 Perform fundraising for specific


projects
Friends of Galan Park
 Lobby elected officials for critical issues
and funding

Strengths, Weaknesses, Opportunities, and Threats

Table 4 lists the current strengths and weaknesses of Galan Park as well as
potential opportunities and threats to its operations.

A-12
Galan Park and Recreation Project Proposal

Table 4.—Strengths, weaknesses, opportunities, and threats

Strengths Weaknesses

1. Large water surface area. 1. Short “warm season” – June


through September.
2. 23+ miles of sandy shoreline.
2. Aging facilities.
3. Variety of camping
experiences (primitive, 3. Undersized developed
developed, beach, OHV, etc.). campgrounds. Too small for
newer recreational vehicles.
4. Within 2-hour drive highway
4. Lacking adequate hookups
5. Scenic views and geologic for recreational vehicles.
formations.
5. Limited OHV and
6. Close proximity to city. hiking/biking trails.

7. Located off main highway 6. Lack of on-site boat storage.


between Adama and Addis
Ababa City. 7. Limited staff to cover large
area. Enforcement and
collections issues.

8. No protected docks/marina.

9. No on-site fuel stations.

Opportunities Threats

1. Growing recreational vehicle 1. Lack of funding for new


market in spite of gas prices. facilities and maintenance
(materials and labor).
2. More retirees traveling.
2. Utility costs.
3. Growing interest in non-
motorized sports. 3. Keeping up with inflation and
rising construction costs.
4. Partners (Reclamation, city,
county, National Guard, etc.) 4. State funding –
with vested interest in unpredictability.
developing park trails and
facilities. 5. Higher gas prices. Out-of-
State travelers not as likely to
5. Potential “Friends” group. travel to the State.

6. Higher gas prices. Incentive


for in-State travelers along
Bishoftu to travel closer to
home. May pickup part of
Bishoftu market.

9. Market Analysis
Galan Park’s primary customers are boaters form the Bishoftu area and
anglers throughout the Addis Ababa and neighboring States. Current
demand is primarily for improved access and regress for boats and
improved facilities (hookups, docks, camping, etc.).

10. Demographics

The makeup of the population that recreates at Galan Park is identified in


table 5.

Table 5.—Summary of demographic information

A-14
Galan Park and Recreation Project Proposal

Demographi Internation
Local State National
c al

50,550,06
Population 1,932,967 106,410,404 7,451,392,455
3

Average age 28.4 28.5 36.4 26.9

ETB74,07
Income ETB47,934 ETB46,242 N/A
8

Male 50.1% 50.1% 49% 50.4%

Female 49.9% 49.9% 51% 49.6%

11. Activities and Community involvement

User Characteristics

The Division of Parks and Recreation has identified the following users
or target markets currently served by the park’s facilities and programs in
table 6.
Table 6._ Galan Park
Customer Description Activities/Characteristics
Water users
Watercraft with 50- Water skiing, wake boarding,
horsepower (hp) or tubing, fishing, pleasure riding
greater engines. primarily day use on
Power
weekends. Tend to have more
boaters
disposable income. Average
investment in equipment is
ETB 30,000.
Motorized boats (under Primarily fisherman—both
Small 50 hp). day users (throughout the
boaters week) and overnighters
(mostly weekends).
Personal Motorized watercraft Pleasure riding, tubing, skiing
watercraft such as wave runners day users and campers,
users and jet skis. primarily on weekends.
Non- Including sailboats, Sailing, canoeing, kayaking
motorized canoes, and kayaks. day users.
boaters
Individuals with high Pleasure fishing and
investment in fishing tournament fishing of all styles
Dedicated
gear/equipment and primarily day use throughout
anglers
high frequency of week, year round.
outings.
Individuals with low to Pleasure fishing primarily day
Casual
moderate investment in use throughout week.
anglers
gear and equipment.
Recreational users
Comfort Individuals, couples, Golfing, hiking, biking, skiing,
campers and families that like the OHV users, boaters. Above-
outdoors but do not average disposable income.
wish to camp and who Require bed, electricity,
do not own or rent a shower, and flushing toilet at a
recreational vehicle. minimum.

A-16
Galan Park and Recreation Project Proposal

They prefer cabins,


yurts, or lodges.
Couples, families who Camping, campfire programs
want hookups and more overnight during both the
Recreation
services. week and weekend. Tend to
al vehicle
stay longer in one area. Often
campers
bring boats and/or OHVs or
other “toys.”
Couples, families, Tent camping, hiking, biking,
individuals wanting a swimming, fishing, boating,
Campers more primitive campfire programs primarily
experience. weekends. Camping on
water’s edge popular.
Family Camping, OHV, boating,
reunions/activities, fishing, socializing—overnight,
church groups, primarily weekends.
Group
corporations, and Minimum requirements are
users
clubs/associations. shade (pavilion), tables,
cooking facilities (e.g., BBQ
grills).
Trail users
Individuals, families, Statewide OHV trail system,
clubs- novice to expert OHV education classes —
OHV
riders. primarily weekends, both day
use and overnight.
Individuals, families, Campers often bring bicycles
clubs- novice to expert (mountain bike style
Mountain
riders. primarily) as a secondary form
biking
of recreation—primarily
weekends.
Sport or Local, State, and Fishing tournaments are
special national organizations. already occurring. Real
events/ potential for water ski or wake
tournamen board tournaments.
t
Market Trends

General trends in outdoor recreation are as follows:

 Greater awareness of value of leisure – overall increased demand for


leisure activities.

 Expectation of recreation facilities – more “comfort” oriented.

 Preference for individual or informal activities is increasing. People


are looking for “experiences.”

 Participation by older adults in active recreation and sport has


increased.

 Average age of outdoor recreation participant is increasing (baby


boomers).

 Number of minority participants is increasing (most notably the


Hispanic community).

Table 7 identifies more specific trends in the State by activity as applicable


to Galan Park.

Market Needs/Demands

The following needs and demands have been identified by park staff based
on visitor feedback, trend analysis, and community comments for Galan
Park.

A-18
Galan Park and Recreation Project Proposal

1. More, larger campsites/hookups for recreational vehicles (RVs)

2. Larger or additional boat ramp

3. Additional fish-cleaning stations (improve existing)

4. Added roads and “turn-around” for boat launching

5. Expanded parking for boats and day users

6. Protected docks (breakwater wall/marina)

7. Improve/expand bathrooms and showers


8. Expand “sandy” beach area for day users

9. Fuel station for boats

10. Improved bathrooms/showers at Knight Hollow and Indian Bay

11. More “accessible” water; expand culinary water system

12. Connect OHV trails to system outside of park

13. Improve OHV trails inside park

14. Develop group site for Knight Hollow (OHV users)

15. Add paved and non-paved trails for hiking and biking; link to city
of Duchesne

16. Emphasize partnership with local businesses for food, rentals, and
supplies—no concessionaire

17. Develop comfort camping facilities (i.e., yurts, cabins)


Table 7.——Galan Park market trends

Activity Trend

 Boat registrations in the State are relatively flat –


no growth
 Nationally, 69 million recreational boating
participants
 Boats operated most often in State:
Open motorboat – 34.6%
Personal watercraft – 21.3%
Canoe – 12.5%
Cabin motorboat – 6.8%
Boaters Inflatable – 6.2%
Kayak – 4.8%
 Boat activities (top five):
Cruising using engine – 46.9%
Water skiing, wake boarding, or tubing – 42.6%
Recreational fishing – 42.0%
Swimming or diving off boat – 33.5%
Paddling – 24.7%
 Wake boarding and other water toys overtaking
water ski industry

 50 to 55 percent of boaters use for fishing


 Increase in number of State fishing licenses
 Average 14 outings per year (nationally)
 Participation dropping nationally
 Decreasing in popularity for ages 20 and under
Anglers
 80% are Caucasian
 Cross-over activities include camping, biking,
hiking
 Fishing is the most popular physical activity on a
camping trip

A-20
Galan Park and Recreation Project Proposal

 45 million adults camp at least once a year


 Car camping declining
 Demand for “hookups” increasing
 The typical RV owner is age 49, married, owns a
home, and has an annual household income of
$68,000
 Camping in national parks decreasing
Campers  One in 12 households owns an RV
 Baby boomers (ages 55 to 64) have the highest
ownership rates, and 1 in 10 households in this age
group own at least one RV
 Baby boomers and children desire more amenities
and comfortable accommodations
 In the next 2 years, campers are most interested in
visiting the west (52%) and south (32%)

 Participation is stable nationally


 OHV registrations in State are increasing
Motorized vehicles –
 Participation by Hispanics and African-Americans
summer
is increasing
 Number of outings is increasing

 Number of mountain biking participants has


remained fairly steady
Non-motorized trail
 60 million adults bike at least once a year
users – summer
 Walking continues to be most popular outdoor
activity

12. Financial Analysis (Budget)


Strategies, Work Plan, and Milestones Summary
Table 8 lists the parks strategies, work plans, and milestones and assigns
them to an individual responsible for overseeing the coordination and
funding target dates for calendar years 2008 through 2010.

Financial Improvements

The division staff evaluates potential projects, programs, events, etc., using
return on investment (ROI) (the ratio of money gained or lost on an
investment relative to the amount of money invested) and payback period
as its methods to measure the acceptability of each project. For long-term
capital projects, internal rate of return (IRR) (the annualized effective
compounded return rate which can be earned on the invested capital, i.e.,
the yield on the investment) and/or net present value (NPV) measures the
excess or shortfall of cash flows, in present value (PV) terms, once
financing charges are met. By definition, NPV = present value of net cash
flows methods are used. As a standard of acceptability, project ROI must
meet or exceed the current State Treasurers money market fund. Capital
project IRR uses a hurdle rate of 3 percent and payback period of 30 years,
or the estimated life of the structure/facility, whichever is less.

A-22
Galan Park and Recreation Project Proposal

Table 8.—Strategies, work plans, and milestones


Capital Mileston
improvem es
ent (target
strategy Work plan date) Assigned to Funding
Renovate the 08/2010 Park Manager; Reclamation/St
Mountain View Reclamation ate matching
complex with 12 Rep.; Project funds
full hookup Manager,
camp units, Division of Coast Guard
expanded boat Facilities and fund
ramp and Construction
expanded boat Management Boating fund
parking, boat (DFCM); and
storage for National Guard OHV fund
30 boats, 4 08/2010 volunteers
enclosed Capital budget
pavilions, 21
new park cabins,
2 acres of beach Park Manager;
Develop
development, Reclamation
and
and 4 restrooms Rep.; Project
construct
with showers Manager,
key
DFCM; and
facilities
Renovate Indian National Guard
Bay, Rabbit volunteers
Gulch, Juniper
Point, Knight
Hollow, and
Strawberry River
above and below
with 150 rural
camp units, 21
rural picnic
units, 1 group
area, and 3 rural
developed boat
ramps and
parking

A-24
Galan Park and Recreation Project Proposal

Mileston
es
Marketing (target
strategy Work plan date) Assigned to Funding
Radio 10/2010- Marketing Park budget
advertising 05/2010 Team, Park
Manager
01/2010- Marketing
Television 04/2010 Marketing budget
advertising Team, Park
08/2010- Manager
Division 05/2010 County
sponsored Theater Marketing Tourism Board
advertising advertising 08/2010- Team, Park
/ 05/2011 Manager
promotions
Newspaper 10/2010- Marketing
advertising 05/2011 Team, Park
Manager

Brochures Marketing
Team, Park
Manager
Mileston
Special es
event (target
strategy Work plan date) Assigned to Funding
Establish 06/2010- Park Manager, Private
partnership with 04/2011 Marketing sponsors
agencies, clubs, Team
associations, and
promoters 06/2010
Enter into Promoter Marketing
agreement Schedule 01/2011- budget
for a tournament days 04/2011 Marketing
fishing Team, fishing
derby at Advertise 06/2010- associations, County
Galan Park tournament 06/2011 and tourism Tourism Board

Park Manager,
Enter into Establish 06/2010 Marketing
agreement partnership with Team
for half agencies, clubs, 01/2011-
triathlon associations, and 06/2011
based at promoters Promoter
Galan Park
Schedule Marketing
tournament days Team,
Triathlon
Advertise Groups, and
tournament tourism

It should be noted, however, that certain projects may be accepted even if


the minimum criteria are not met based on such factors such as
environmental justice, safety, resource protection, heritage preservation,
or division objectives.

This contains the detailed summary of the different projects considered by


division staff. Table 9 is a summary of the financial summary of the
selected alternative, and table 10 is a financial summary comparison of the
current and proposed plan.

A-26
Galan Park and Recreation Project Proposal

Table 9.—Financial summary of proposed plan

Investment Initial
summary Net cash investmen
strategy flow t Paybac ROI IRR NPV2
description (ETB) (ETB) k1 (%) (%) (ETB)

Mountain View ETB239,1 ETB4,666,0 20 5.13 3.04 ETB145,0


Alternative 2 60 00 00

Winners Bay 26,310 579,000 22 4.54 2.13 (50,000)

Rabbit Gulch 25,300 434,000 17 5.83 4.07 75,000

Juniper Point 16,450 278,000 17 5.92 4.19 53,000

Knight Hollow 10,825 194,000 18 5.58 3.71 24,000

Strawberry River (165) 38,000 -230 -0.43 -0.43 (41,000)


Above

Strawberry River 125 43,000 344 0.29 -11.65 (40,000)


Below

Special events 2,950 3,000 1 98.33 —

Marketing — 6,000 0 0.00 0.00 (6,000)

TOTAL ETB320,9 ETB6,241,0 19 ETB160,0


55 00 00
1
Payback is in years.
2
Based on a 2-year life (except for special events and marketing).

Assuming all the projects listed above are implemented, park staff
estimates a net annual increase of ETB 403,200 in revenue over the current
plan. Tables 10-12 summarize the financial differences between the
current and proposed plan.

13. Management of the project


 Owners
 General Manager
 Administrate and finance department
 Production departments
 Administration and personnel section
 Finance section
 Input supply section
 Sales Section

14. Success Monitoring

The performance measures in table 13 will be used to monitor and


measure the success of the implementation of the above-mentioned
strategies.

Table 10.—Comparison of current and proposed plan


Proposed Net
Current plan
Financial summary plan difference
(ETB)
(ETB) (ETB)
 CAPITAL ETB4,859,0 ETB6,235,0 ETB1,376,000
EXPENDITURES 00 00
OPERATING COSTS      
Total incremental 68,250 181,750 113,500
labor
Operating 4,970 88,890 83,920
supplies/maintenance
Utilities 10,425 23,725 13,300

A-28
Galan Park and Recreation Project Proposal

Other costs 2,250 9,600 7,350


Overhead 17,200 60,800 43,600
Total incremental 103,095 364,765 261,670
costs
REVENUE      
Total incremental 282,520 685,720 403,200
revenue
INVESTMENT ANALYSIS      
Net cash flow 179,425 320,955 141,530
Initial investment 4,859,000 6,235,000 1,376,000
Payback (years) 27 19  
Net present value (1,305,000) 166,000 1,471,000
(NPV)
BREAK-EVEN ANALYSIS      
Break-even revenue ETB347,567 ETB677,636 ETB330,070

Table 11.—Summary of annual funding sources


Current Proposed Net effect
Revenue type (ETB) (ETB) ETB
General funds 103,095 364,765 261,670
10% of total incremental
28,252 68,572 40,320
revenue
Federal funds 0 0 0
Grants 0 0 0
Restricted funds (law
86,300 86,300 0
enforcement)
Other funding sources 250 250 0
TOTAL REVENUES 217,897 519,887 301,990

Table 12.—Summary of annual expenses


Current Proposed Net effect
Expense type (ETB) (ETB) (ETB)
Wages and benefits 183,052 336,872 153,820
Operating supplies/maintenance 4,970 88,890 83,920
Utilities 10,425 23,725 13,300
Other costs
2,250 9,600 7,350
(contractor/professional services)
Overhead 17,200 60,800 43,600
TOTAL EXPENSES 217,897 519,887 301,990

Table 13.—Performance measures


Measure Target score
Goal Action item description or range
Meet or exceed Promote new facilities Match or exceed Maintain or
projected visitor as they are brought on projected exceed
use levels line revenues projected use
identified for for 3 years
camping, cabins, Grand opening
pavilions, boating, campaigns
and day use
Organize and hold Establish partnership Schedule and Hold an
a fishing derby with agencies, clubs, follow through event each
associations, and on a fishing year for
promoters derby 3 years

A-30
Galan Park and Recreation Project Proposal

Organize and hold Establish partnership Schedule and Hold an


a half triathlon with agencies, clubs, follow through event each
associations, and on a triathlon year for
promoters 3 years