S-01

NOTES
1,750
1,688
5,238 3,000
3,550 1,688 1,250 2,000 2,000 2,000
52,062
2,000 70,368 2,000 2,000
18,306 9,868
13,118
3,250
7,317
11,341 2,049
10,073
23,034
41,334 2,000
55,500
2,000 37,200 2,000 2,000 1. All dimensions to be checked from the plan but
3,550 6,272 6,010 4,530 5,954 6,410 7,255 3,631 18,306 9,868 3,250 4,000 3,317 8,024 2,049 23,034 4,344 6,610 2,000 9,186 2,000 4,606 7,694 4,542 6,519
not to measured.

1,129

2,500
2.All reinforced concrete works will be in

3,000

3,000

3,399
examination

accordance with the Structural Engineers details.

1,910
600 600
laboratory

600

7,200 300
3. All walls below 9" thick to be reinforced with
examination
examination examination examination
examination examination
lab office

hoop iron at every alternate course.

6,066
15,500 canteen

4 All sanitary works to be carried out under MHO


12,500

12,500
11,261

rules and fregulations.

1,303
ACCIDENT AND EMERGENCY

3,5512,500
waiting bay

office
laboratory 5. D.P.C to be 3-ply bituminous felt laid under all

2,800
examination examination examination examination
lab
walls.
6. Drains passing under buildings or drive ways to

35,500
5,000

5,000

be of cast iron encased in concrete.

7,157
OUTPATIENT

7. Minimum depth of foundations to be not less


12,079

12,079
2,222

2,222

than 1200mm. Actual depth to be determined on

17,500
security
2,500

2,500

4,075
site.
office
radiology
recovery room recovery room
pre operation room

8. All doors and windows as per schedule, kitchen


2,358

2,358

600
accounts pharmacy

E-02
pharmacy store
radiology
fittings and bathrooms to details.
2,500 2,642

2,642

lab operating room

9. Concrete strip foundations to be reinforced with


2,578 7,721

7,721
2,500

radiology operation room


pre operation room operation room

office 3no.ms bar links at 300mm c/c 1:3:6 concrete


2,578
E-01

2,700
reception mix.

18,249
lobby discharge office

10. Heavy duty polythene anti-termite treatment to


5,434

5,434

5,234
be provided under ground floor slab.
9,900

9,900

9,500
11. Waste and soil pipes to be in ducts and bends
S-02 S-02 to have cleaning eyes with external access.
4,466

4,466

4,566
12. Windows to have pc cill, built-in pelmet box
with pv timber board and burglar proofing.
2,500

2,500

2,500
3,687
radiology

13. Interior cornice and skirting to be standard


LAUNDRY
6,508
2,500

2,500

pre operation room ict department


radiology

2,415
type(cedar).
examination examination
OFFICE

7,200
2,500

2,500

office equipment and central supply storage


office

14. All fittings, iron mongery e.t.c to be approved

2,519
2,500 15,300

2,692

office
2,500

2,500

records store
before fixing.

2,619
15. Plinth levels to be minimum 300mm fro

2,200
2,500

2,800 300
RECORDS
LAUNDRY

2,196
6,100

pre operation room operation room OFFICE


ict department

proposed parking level or existing ground level.


nursery nursery
2,800

2,800

16. Staircase thread 250mm. riser 150mm and

600 7,171 600


operation room

landing 1000mm.

35,565
5,000
4,700
4,700
4,700
4,700

17. All dimensions are in linear millimeters


18. Roof pitch is 200
2,500

2,500

2,500
3,503

2,079

600 600
2,500

2,500

2,500
recovery room discharge office
delivery room delivery room delivery room
2,500 15,300 2,612

office supply store conference conference

2,500 1,947
conference
600

conference hall hall


hall hall
NURSE AREA

2,500
2,200 2,800

2,800

office
1,498

1,508
2,200

Revision History

2,547
4,254 2,833
2,500

2,500
delivery room
delivery room NURSE AREA
delivery room recovery room recovery room

4,478
2,840

2,840

2,765
RevID ChID Change Name Date

2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
3,352 3,037 4,591 7,274 6,689 6,622 6,756 4,097 1,948 18,239 30,507 17,872 162 2,851 2,000 10,474 2,000 6,919 5,383 8,088 5,566 2,000 9,220300
1 1,700 300
78,606 9,868 300 9,900 300 8,091 2,048 17,872 162 300 28,900 300 7,700 300 7,700 300 9,700 300 2,700
78,606 30,507 17,872 162 60,501

S-01
4.638 40.000
2.826 12.200 19.700 29.700 39.700 49.700 59.700 59.950
56.950
4.950 14.950 34.950 44.950 54.950

2.251
34.800

office

2.499
32.600

examination
examination examination examination

2.499
30.100

2.499
27.600

2.499
lab lab
25.100

PROJECT
radiology
radiology

2.388
22.600

nurse area
PROPOSED RESIDENTIAL HOUSES
(APARTMENT)
20.106

5.110
2.499
15.100

operation room

2.499
operation room
12.578

pre operation room recovery room recovery room

2.499
10.078

9.778

2.499
Drawing Name
7.578

operation room

operation room

GROUND FLOOR PLAN, TYPICAL FLOOR

2.499
5.078

pre operation room Sterile processing and instrument storage

PLAN,SITE PLAN AND ROOF PLAN

2.748
2.578
E-01

lobby
0.300

S-02 S-02 Designed by


Date

2.251
01/2018
James Mwirigi
34.700

office

2.499
32.500

examination examination

denntal treatment

2.499
30.000

denntal treatment

2.499
27.500

2.499
25.000

Date
waiting area
equipment room
supplies
sterlization

2.384
22.500

denntal treatment 08/2018


19.994

Checked by

5.363
Mr. Edward Mbugua
Mr. Harrison Wachira

2.251
15.000

imaging x ray

2.499
12.495

2.499
10.000

2.499
cancer center
7.500

Drawing Scale

2.499
5.000

chemotherapy

1:100, 1:200

2.813
2.500

4.688 0.300 4.700 30.000 10.000 10.200 2.000 3.000


3.000 12.250 19.750 29.700 39.750 49.750 59.750