Monthly Report Revision
Monthly Report Revision
NO
you acknowledge you
have completed the
Direct incident numbers 0 1 0 0 assestment responsibly
both questions.
CTP
Direct TCIR 3 0 0 0
STOP! Guide if you response “Yes” to one or more questions:
If you have COVID-19 signs:
• Seek medical attention and follow the protocols of the Health Minister of Chile.
• Do not entering to GP’s installations until you have the COVID-19 certificate and a new
Direct LTIR 0 2 0 0 COVID-19 test had been negative. Report first to your supervisor.
If you have had “close contact” in the past 14 days with COVID-19 possitive person. Report to
DO NOT ENTER TO GP’s your supervisor and come back to GP installations after 14 days with a COVID-19 negative test
Comments:
- No comments
OPERATIONAL
R-5
R-601
R-51
Resimixer
Formol I
Formol II
Formol III
Comments:
- No comments
1
ENVIRONMENTAL REPORT
Current accumulate vs 2020 plan target waste water
Waste water indicators
1,20
Type of Waste Jan 2020 Feb 2020 Mar 2020 Apr 2020 Total 2020
Accumulate
Salable production 10115 8651 10395 8500 37661
(ton)
Specific W. Water 0,20 0,24 0,21 0,26 0,91 0,60
(m3/ton)
2020 Target (m3/ton) 0,30 0,30 0,30 0,30 1,20
0,30
2019 Value (m3/ton) 0,30 0,30 0,30 0,30 15,60
0,00
Jan 2020 Feb 2020 March 2020 Apr 2020
Solid wastes indicators Current monthly accum (m3/prod. tons)
Max monthly accum. Target (m3/prod. tons)
Type of Waste April waste Percentage
(tons)
Industrial-Not 4 8 %
Dangerous
Solid Resin 0 0 % Industrial-Not Dangerous
8 %
Liq. Resin 1 2 %
Liq. Resin
Dangerous waste 2 %
Domiciliary 0 0 %
27 %
Metal packages 0 0 %
Parapets Sludges
Recycling metals 0 0 %
April 2020 solid 25 %
wastes
Parapets Sludges 12 25 %
Total 48 100 %
Comments:
- No comments
QUALITY REPORT
MONTHLY PQI 2020
Quality Indicators
January 2020
Month First Quality PQI
January 2020 98,95 % 1,05 February 2020
99,55 %
99,30 %
99,05 %
Comments:
98,80 %
- No comments January 2020 February 2020 March 2020 April 2020
2
MAINTENANCE REPORT
Comments:
- No comments
PROJECTS REPORT
Project Indicators
Project Name Ecosys N° Status Completed % Total Budget Budget in
Comments:
- No comments