PEMBAYARAN PEKERJAAN

LC (LAND CLEARING)

JUMLAH
TGL/BLN HARI PEKERJA HARIAN TOTAL

3/9/2020 Senin 12 Rp 100,000.00 Rp 1,200,000.00

3/10/2020 Selasa 12 Rp 100,000.00 Rp 1,200,000.00

3/11/2020 Rabu 12 Rp 100,000.00 Rp 1,200,000.00

3/12/2020 Kamis 12 Rp 100,000.00 Rp 1,200,000.00

3/13/2020 Jumat 12 Rp 100,000.00 Rp 1,200,000.00

3/14/2020 Sabtu 12 Rp 100,000.00 Rp 1,200,000.00

3/15/2020 Minggu 12 Rp 100,000.00 Rp 1,200,000.00

3/16/2020 Senin 12 Rp 100,000.00 Rp 1,200,000.00

3/17/2020 Selasa 12 Rp 100,000.00 Rp 1,200,000.00

3/18/2020 Rabu 12 Rp 100,000.00 Rp 1,200,000.00

3/19/2020 Kamis 12 Rp 100,000.00 Rp 1,200,000.00

3/20/2020 Jumat 12 Rp 100,000.00 Rp 1,200,000.00

TOTAL Rp 14,400,000.00

CV. SONJAYA PUTRA PT. INECCO WIRA SAKTI HUTAMA

Amang Muhidin Dr. Herning Soetrisno, S.Si, Apt


Direktur General Manager