A B C C' D E F G H

123'-5"

8'-11" 14'-2" 16'-9" 18'-1" 17'-7" 12'-9" 13'-9" 12'-9" 8'-7"

123'-6"
10'-1"

10'
1
PB PB PB L/3 L/3
1-12Ø(Ext.) 2-12Ø (CONT) 1-12Ø(Ext.)

2
PB PB PB

1'
PB

PB
PB

PB
Ø8mm@8"c/c ties

L/5 L/5
23'

1-12Ø(Ext.)
RR RR RR RR L
2-12Ø(CONT)

PB
PB
PB

PB
LONGITUDINAL VIEW OF PLINTH BEAM

27'-3"
RR RR RR RR 9"
2-Ø12mm TOP

1-Ø12mm EXTRA BAR


3
PB PB PB
9'-4"
74'-8"

PB
8'-9"

PB

PB

PB
Ø8mm@8"c/c

1'
.
ties

4 PB PB PB PB PB
4'
PB
1-Ø12mm EXTRA BAR

8'-9"
PB
PB
PB
2-Ø12mm

PB
9" 6'-9" 9" 3'-5"
TYPICAL CROSS SECTION OF PLINTH BEAM
PB

PB
PB

PB

5
PB PB PB
23'

RR RR RR RR 1'

2'
PB
PB
PB

PB

26'
PB PB PB
6 RR RR RR RR RR PILLAR PLAN

1'
9'-10"

10'-1"

PLINTH
12'-3"

PB PB PB
7
25'

3'
16'-11"
13'-1"
P.C.C BED
1:4:8

6"
RR PILLAR SECTION
IMPORTANT NOTE:
1. THIS DRAWING IS UNDER COPY RIGHT OF STRUCTURAL ENGINEER.
2. ALL DRAWINGS ARE SUBJECT TO SANCTION FROM CONCERNED AUTHORITIES.
3. ANY DISCREPANCY IN THE DRAWING SHOULD BE IMMEDIATELY NOTICE TO THE
STRUCTURAL ENGINEER. PROJECT TITLE: PROPOSED RESIDENTIAL BUILDING AT MADHURAWADA NOTES :
4. ALL WORKS TO BE CARRIED OUT STRICTLY AS PER DRAWINGS. 1. ALL DIMENSIONS ARE IN FEETS AND INCHS
5. STRUCTURAL ENGINEER WILL BE NOT BE RESPONSIBLE FOR INCORRECT BAD OR DEFECTIVE PROPOSED 40'-0" WIDE ROAD CLIENT: SUDHEER GARU
2. GRADE OF CONCRETE - M25
3. GRADE OF STEEL - Fe500
WORK.
6. THE DESIGNS ARE VALID ONLY WHEN PROPER CONSTRUCTION AND PRACTICE AND QUALITY DRAWING TITLE: PLINTH BEAM LAYOUT AND REINFORCEMENT DETAILS 4. SBC OF SOIL CONSIDERED - 15t/m2
CONTROL ARE IMPLEMENTED IN THE SITE. 5. STRUCTURE IS DESIGNED FOR S+G+4
7. IF THE SOIL STRATA IN THE SITE ARE OBSERVED TO BE DIFFERENT FROM THOSE MENTIONED
I THE SOIL REPORT THE SAME SHOULD BROUGHT TO THE NOTICE OF
PLINTH BEAM LAYOUT REV: DESCRIPTION: BY: DATE:
6. CLEAR COVER FOR FOOTINGS - 2"
7. CLEAR COVER FOR COLUMNS - 1 1/2"
8. CLEAR COVER FOR BEAMS - 1"
8. THE STRUCTURAL ENGINEER IMMEDIATELY FOR SUGGESTING MODIFICATION.
9. CLEAR COVER FOR SLABS - 34"
9.THE PROVISION MADE IN IS 456 2000,SP 34 AND OTHER RELEVANT CODES SHALL BE STRICTLY
ADHERED TO DURING EXECUTION.
PROJECT NO S-SP-1111/1112-03,04 ARCHITECT: STRUCTURAL ENGINEER:
10. ALL THE DIMENSIONS, LEVELS, ALIGNMENTS AND REINFORCEMENT BARS ETC. ARE TO BE
VERIFIED BEFORE THE CONCRETE IS PLACED FOR THE RCC MEMBERS. DRAWING NO 4 REV R0
11. LAP LENGTH IS EQUAL TO DEVELOPMENT LENGTH (Ld) WHEREVER LAPS ARE NEEDED. LAPS DEALT BY MURTHY DRAWN BY SBL PRO
SHALL BE STAGGERED AND NOT MORE THAN 50% AT ANY LOCATION.
CHECKED BY STRUCTURES
12. MIX PROPORTION HAVE TO BE CONFIRMED WITH STRUCTURAL ENGINEER BEFORE SCALE: N.T.S MURTHY
CONCRETING AND TO BE STRICTLY FOLLOWED.
13. STRUCTURAL ENGINEER HAS TO VERIFY AT EVERY STAGE BEFORE CONCRETING
DATE: 03-12-2019 IMPACT architects H.NO. 50-1-48/1,
A S R NAGAR
SEETHAMMADHARA,
VISAKHAPATNAM-530013.
This drawing is copyright and may not be copied without prior written consent. Phone: 9573249259
Email:prostructuresvizag@gmail.com
The contractor shall verify all dimensions on site before commencing any work
or shop drawing. Any discrepancies occurring in this drawing must be referred
to the Structural consultants before the commencement of any work.