JSA-Scaffolding Erection & Dismantling Works RV-00
JSA-Scaffolding Erection & Dismantling Works RV-00
JSA-Scaffolding Erection & Dismantling Works RV-00
Facility /
Job Location : Specify Activity to be Assessed: Scaffolding Erection, Dismantling and Alteration Works
Department:
Date: _______________Time: ________ Date: _________________ Time: __________ Date: _______________ Time: _________
POTENTIAL HAZARD CONTROL MEASURE RESPONSIBLE
SR JOB STEPS
(What can cause harm?) (What can be done to prevent it from going wrong?) PERSON
Secure permit and all related documents
Missed information COMPANY LTD.to work. As per GI.2.100
prior
Page 2 of 2
Preparation and between supervisors and Conduct tool box meeting prior to SiteRev-00
Engineer / Job
JOB SAFETY ANALYSIS
activity Document No:
1. compliance to work workers regarding Supervisor / Foreman/
(Scaffolding Erection &Dismantling
All workersWorks)
need to be trained and must
permit requirements safety factors and work Safety Officer/ WPR
instructions have training passport.
REFERENCES GI-2.100, GI-8.001, Hazard Identification Plan, Schedule D, SACSM & Aramco Safety Handbook. RA,
AGC-TR-454 Approved Fall Protection Remove all tripping
Plan (RV-01), hazards
Saudi Aramcofrom the
Construction Safety Manual (CSM):
work area.
Chapter II-2, Scaffolding, Chapter II-5, Fall Protection, Chapter II-6, Concrete Construction
Watch where you are walking.
Proper barricade of the working radius
and install overhead work signage
Slip, Trip signage’s.
Public traffic Assign personnel to control/guide any Site Engineer / Job
Preparation of
2.
working area Pedestrians vehicle. Supervisor / Foreman/
Flagman/spotter to remain vigilant of Safety Officer/ WPR
errant pedestrians and personnel.
Where pedestrian crossings are within
the working area either shut the
pedestrian crossing or make the crossing
safe for pedestrian use.