GROUND FLOORING
I. INPUT DATA II. CONCRETE TAKEOFF
Designation SOG Volume [cu m] 19.60
Length [m] 14 Cement [bag] 176.40
Width [m] 14 Sand [cu m] 9.80
Thickness [m] 0.10 Gravel [cu m] 19.60
Class A
MF for Cement 9.00
MF for Sand 0.50 III. STEEL BAR TAKEOFF
MF for Gravel 1.00 Temp Bar Perp-L [pcs] 216.00
Perpendicular to L: Temp Bar Perp-W [pcs] 216.00
Length of Temp Bar [m] 15
No of Temp Bar [pcs] 72 TOTAL BAR [pcs] 432.00
Dia of Temp Bar [mm] 10
Commercial Length [m] 6 Tie Wire [kg] 29.34
Perpendicular to W:
Length of Temp Bar [m] 15
No of Temp Bar [pcs] 72
Dia of Temp Bar [mm] 10
Commercial Length [m] 6
No of Items 1