Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

DELHI AIRPORT METRO EXPRESS LINE PROJECT (DAMEL)

Delhi Airport Metro Express Pvt. Ltd.


Contractor's Submission Form
Contract Name BEMS 1000 Series Actual CSF date 24-Dec-09

Contractor name Blue Star Limited Planned CSF date 24-Dec-09

CSF reference No. CSF-BEMS-DWD-BSM-LVL-0002 REV A

Dwarka Depot-Basement level Cable Tray drawings-Electrical


CSF title

CSF Content Description Type of Submission


Plans
Definitive Design
1 Electrical Drawings for DWD Basement level as per the attached "Electrical Drawing List - DWD" ● Detailed Design
Material
Method Statement
Test Procedure
Test Reports
System Assurance Doc
O&M Manuals
Training Doc
As Constructed Doc

Other
Attachment
1 Basement level Cable Tray drawings - DWD (Sheet 1 to 5) ● CADD Drawing
2 Basement level Cross section drawings - DWD ( Sheet 1 to 1) P3 Programme
3 Electrical Drawing List - DWD MS Document
Sample & Catalogue
Other

Submission By : Rajesh Wable Fill in Cell Select cell Auto generate cell
Name : Blue Star
Title : Lead Contractor
Signature :
>
DELHI AIRPORT METRO EXPRESS LINE PROJECT (DAMEL)
Delhi Airport Metro Express Pvt. Ltd.
Contractor's Submission Form
Contract Name BEMS 1000 Series Actual App. date 24-Dec-09

Contractor name Blue Star Limited Planned App. date 24-Dec-09

CSF reference No. CSF-BEMS-DWD-BSM-LVL-0002 REV A

Dwarka Depot-Basement level Cable Tray drawings-Electrical


CSF title

Employer Representative's Approval Sheet Approval status


Approved
1 On review the cable tray layout is found to be generally in order. ● Approved with Comment
2 Please ensure that the cables are laid as per relevent specifications and there is no over crouding of cables on cable tray. Not Approved
3 BSL to submitt CSD showing provision for other services
4 Location of cutout and cable tray should match the cutout / shaft position.Please check the cutout locations at site and modify if required
Follow up action
5 BSL to closely coordinate with PST to ensure that there is no clash and rework. ● No need to resubmit
6 In sheet 4 of 5 location of cable tray has been changed ,please ensure the availability of space as per site conditions. Please resubmit
See below details
Note- This acceptance do not absolve contractor from their contractual obligations/liability

Approved By : Fill in Cell Select cell Auto generate cell


Name : Rajeev jain
Title :
Signature :
>

You might also like