A Preliminaries/General conditions
INFORMATION PROVIDED MEASUREMENT RULES DEFINITION RULES COVERAGE RULES SUPPLEMENTARY
INFORMATION
Pl Location drawings as defined in General Rule 5.1 01 A fixed charge is for C1 Wor1<s of a temporary
work the cost of which is to nature are deemed to include
P2 Information to facilitate visiting site and addresses where drawings or other information additional to that required by these rules
or other listed information may be inspected
be considered as rates, fees and charges
independent of duration related thereto in Sections
A36, A41, A42, and A44
02 A time related charge is
tor work the cost of which is
CLASSIFICATION TABLE to be considered as
dependent on duration

A1OProject particulars

1 Project particulars t Name, nature and location item


2 Names and addresses of
Employer and Consultants

A11 Tender and contract documents

1 Documents 1 List of drawings/other 1 Used for bill of quantities item


documents 2 To be used for contract

A12 The site/Existing buildings

1 The site/Existing buildings 1 Site boundaries item


2 Existing buildings on or
adjacent to the site
3 Existing mains/services
4 Others. details stated

A13 Description of the Works

1 Description of the wor1< 1 Elements of each new item


building

2 Dimensions and shape 1 Plan area and perimeter M1 Given only when the
relating to each building at each floor level equivalent information is not
2 Heights between floors indicated on the drawings
provided
3 Total height

3 Details of related wor1< by


others