L.M. Design and Address: 459 Legaspi St.

,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

PLANS and DRAWINGS

PERSPECTIVE

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

PLANS and DRAWINGS

FLOOR PLAN
Ground Floor Plan, Second Floor Plan, Second Floor Framing Plan, and Roof
Framing Plan.

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

PLANS and DRAWINGS

ELEVATIONS
Front Elevation, Rear Elevation,
and Right Side Elevation.

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

PLANS and DRAWINGS

STRUCTURAL DETAILS
AND SPECIFICATIONS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

BASIS OF DESIGN

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

DESIGN OF

PURLINS,SAGRODS
& TIERODS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

LOADINGS AND ANALYSIS


OF

TRUSS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

DESIGN OF

TRUSS MEMBERS
Top Chord, Bottom Chord, Diagonal Web,
and Vertical Web Members

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

FRAME ANALYSIS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

DESIGN OF

BEAMS AND
GIRDERS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

DESIGN OF

COLUMN

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

DESIGN OF

COLUMN
BASE PLATE

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

DESIGN OF

CONNECTIONS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

APPENDICES

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

ACKNOWLEDGEMENT

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

APPENDICES:

 Association of Structural Engineers of the Philippines, Steel


Handbooks / Manual
 National Structural Code of the Philippines 2010 (NSCP)
 ASTM Standards for Lip C purlins, Angular Section, Wide Flange
Sections.
 AutoCAD 2016
 MDSolids 4.0
 Microsoft Excel 2013
 STRIAN - Structural Analyser

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL DETAILS AND SPECIFICATIONS

 Load Combinations:
o Deadload + Liveload + Windload (Suction)
o 0.6 Deadload + Windload (Suction)
o Deadload + Liveload (Most Critical) - Basis of Design

 All Structural Steel are used with A36 Steel Specification (except
purlins):
o Fy = 248MPa
o Steel types and sizes may vary depending on the computed sizes
o For purlins use Light gage Lip-C Purlins of Fy=170MPa.

 Load Considered
o Gravity Loads / Deadloads (NSCP)
 Roof Cover
 Roof Liveload
 Self-weight of steel sections
 Ceiling Load
 Slab Weight (thickness = 100mm)

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,

 Floor Finishes
 Frame Walls
 Frame Partition
 Miscellaneous
 Wall Weight

o Wind loads (UBC)


 Windward
 Leeward
o Liveloads
 Roof Liveload
 School Building Live Load (NSCP)
 Steel Plates and Connections
o Fc’=21MPa
o Steel Gusset Plate of 10mm thickness (thickness may vary)
o Electrode E60XX of Fu=415MPa , Fu = 60ksi

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

SOFTWARE USED IN TRUSS ANALYSIS

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

MOMENT DISTRIBUTION METHOD IN FRAMES


USING MICROSOFT EXCEL 2013 AND
STRIAN - STRUCTURAL ANALYSER

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

FOR FRAME C:

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

FOR FRAME 3:

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

CONTENTS
PLANS AND DRAWINGS

1. Perspective
2. Floor Plan
2.1 Ground Floor Plan
2.2 Second Floor Plan
2.3 Second Floor Framing Plan
2.4 Roof framing Plan
3. Elevations
3.1 Front Elevation
3.2 Rear Elevation
3.3 Right Side Elevation

4. Structural Details and Specifications

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

STRUCTURAL ANALYSIS AND DESIGN

1. Basis of Design
2. Design of Purlins, Sagrods and Tierods
3. Loadings and Analysis of Truss
4. Design of Top Chord
5. Design of Bottom Chord
6. Design of Web Members
7. Frame Analysis
8. Design of Beam and Girders
9. Design of Column
10. Design of Base Plate
11. Design of Connections
12. Appendices
13. Acknowledgement

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

ACKNOWLEDGEMENT

First of all, I want to express my gratitude to my instructor, Engineer


Edgardo S. Cruz, for his guidance, patience, and support to us throughout the
design project of this course. Thank you for being an excellent educator!
To my parents, for the opportunity that they have given me, their
endless amounts of love, and support. Words are really not enough to express my
heartfelt thanks to both of you.
Also, I want to thank all my dear friends who helped me while I was
making this project, especially to Janna whom had answered all the endless
questions I have asked her, and to Marion whom assisted me in making the
AutoCAD files. You two are really one of a kind!
Lastly, I want to thank God the Father Almighty who made all things
possible.

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
L.M. Design and Address: 459 Legaspi St.,
Intramuros, Manila
Development Corporation
Contact no. : (+63)915 424 8859

2-STOREY SCHOOL ENGR. LOUIS BRIAN JANUARY - MARCH


PROJECT ANGELOU V. MIRANDA 2017
CABIAO, NUEVA ECIJA
PROJECT TITLE/ LOCATION STRUCTURAL ENGINEER DESIGN DURATION
MAPUA INSTITUTE OF TECHNOLOGY
School of Civil, Environmental, and Geological Engineering

DESIGN PROJECT IN CE134P


STEEL DESIGN

2 - STOREY SCHOOL BUILDING


IN CABIAO, NUEVA ECIJA

Submitted by:
MIRANDA, LOUIS BRIAN ANGELOU V.
2013108108
CE134P – A2

Submitted to:
ENGR. EDGARDO S. CRUZ

MARCH 14, 2017

You might also like