Professional Documents
Culture Documents
CN Lab Assignment-1
CN Lab Assignment-1
CN Lab Assignment-1
Q1. Design and realize a network topology using RIP Routing protocol having 3 [10 marks]
different network series including at least 3 routers and 2 switches.
Q2. Analyze the above network designed for the case if the hop counts are increased [5 marks]
i.e. one or more routers are added up in a route. Show how the topology updates
are made.