Below: 1 1 TH Before RT N T I R Ike To
Below: 1 1 TH Before RT N T I R Ike To
Below: 1 1 TH Before RT N T I R Ike To
4 Breaking out existing 1 Rock ffi3 1 Extra over any types ol 05 Rock is any material
materials excavating irrespective of which is of such size or
2 Concrete position that it can only be
~ depth
3 Reinforced concrete m2 removed by wedges, special
5 Breaking out existing hard plant or explosives
pavings, thickness stated 4 Brickwork, blockwork or
stonework
5 Coated macadamor
asphalt
6 Working space allowance 1 Reduce levels, basements m2 M7 Working space is 06 8ackfilling with special C2 Additional earthwork S3 Details of backfilling
to excavations and the like measured where the face of materials occurs where support, disposal, backfilling, with special materials
the excavation is < 600 mm selected or treated work below ground water
2 Pits from the face of formwork, excavated materials or level and breaking out are
3 Trenches rendering, tanking or imported materials are used deemed to be included
4 Pile caps and ground protective walls
beams between piles MS The area measured is
calculated by multiplying the
girth of the formwork,
rendering, tanking or
protective walls by the depth
of excavation below the
commencing level of the
excavation