Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

D30 continued

CLASSIFICATION TABLE MEASUREMENT DEFINITION RULES COVERAGE RULES SUPPLEMENTARY


RULES INFORMATION I

28 Items extra over 1 Comers 1 Type stated m M18 The length I


interlocking piles mea sured
2 Junctions
for items extra over is the
3 Closures total length
4 Tapers

29 Isolated pile 1 Mass per metre and 1 Total number nr 1 Preliminary piles M19 Separate items are C14 The cost of
extensions cross-sectional size, required for the length of extraction is deemed to
or section reference 2 Raking, inclination
2 Extension length s 3.00m m pile extensions and for be included with piles so
ratio stated
stated the described
3 Extension length > 3.00m 3 To be extracted number of pile extensions
30 Interlocking pile 2 Section modulus and C15 Pile extensions are
extensions 4 Using materials arising deemed to include the
cross-sectional size, or
section reference from cutting off work necessary to attach
stated surplus lengths of the extension to the pile
other piles

31 Cutting off surplus 1 Mass per metre and 1 Isolated piles (nr) m 1 Preliminary piles M20 The length C16 Cutting off surplus
from specified lengths cross-sectional size, measured is the surplus from specified lengths of
or section reference 2 Raking, inclination length of each pile piles is deemed to
stated ratio stated include provision and
filling of working space
2 Section modulus and 2 Interlocking piles (nr) m and disposal
cross-sectional size. or
section reference
stated

32 Cutting interlocking 1 Dimensioned nr


piles to form holes description

33 Delays 1 Rig standing 1 Isolated piles h M21 Delays are only


measured where C17 Delays are deemed
specifically authorised to include associated
2 Interlocking piles labour

34 Pile tests nr
1 Details stated S17 Timing and
details of tests

You might also like