Flowchart of CPO: PT Smart TBK Mill Audit Advisory

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

PT SMART Tbk Flowchart of CPO

Mill Audit Advisory (A prediction with OER 24% and Total Oil Loss 1,60%)
tons/hr % %/FFB tons/hr % %/FFB
FFB before Water 28.3085 47.18 47.18 Crude Oil Water 7.0486 30.76 11.75
sterilized Oil 15.2642 25.44 25.44 ex Press Oil 14.6042 63.74 24.34
NOS 16.4273 27.38 27.38 NOS 1.2584 5.49 2.10
TOTAL 60.0000 100.00 100.00 TOTAL 22.9112 100.00 38.19

FFB after Water 18.8196 37.26 31.37 Diluted Water 21.4486 57.49 35.75
sterilized Oil 15.2642 30.22 25.44 Crude Oil Oil 14.6042 39.14 24.34
NOS 16.4273 32.52 27.38 NOS 1.2584 3.37 2.10
TOTAL 50.5112 100.00 84.19 TOTAL 37.3112 100.00 62.19

Empty Bunch Water 7.5245 59.72 12.54 Recycling Fat Oil Water 2.4420 58.14 4.07
Oil 0.2700 2.14 0.45 Oil 1.1220 26.71 1.87
NOS 4.8055 38.14 8.01 NOS 0.6360 15.14 1.06
TOTAL 12.6000 100.00 21.00 TOTAL 4.2000 100.00 7.00

Empty Bunch Water 7.5055 60.00 12.51 Crude Oil Water 23.8906 57.55 39.82
stalk Oil 0.2400 1.92 0.40 Oil 15.7262 37.88 26.21
NOS 4.7636 38.08 7.94 NOS 1.8944 4.56 3.16
TOTAL 12.5091 100.00 20.85 TOTAL 41.5112 100.00 69.19

Fruit Loss Water 0.0191 21.00 0.03 Sludge to Water 23.7600 88.00 39.60
Oil 0.0300 33.00 0.05 Centrifuge Oil 1.3500 5.00 2.25
NOS 0.0418 46.00 0.07 NOS 1.8900 7.00 3.15
TOTAL 0.0909 100.00 0.15 TOTAL 27.0000 100.00 45.00

Loose Fruits Water 11.2951 29.79 18.83 Sludge to Water 21.3180 93.50 35.53
Oil 14.9942 39.55 24.99 Waste Oil 0.2280 1.00 0.38
NOS 11.6219 30.66 19.37 NOS 1.2540 5.50 2.09
TOTAL 37.9112 100.00 63.19 TOTAL 22.8000 100.00 38.00

Fibre Water 3.0000 40.00 5.00 Underflow from Water 10.0320 98.35 16.72
Oil 0.3600 4.80 0.60 Recovery Tank Oil 0.0720 0.71 0.12
NOS 4.1400 55.20 6.90 NOS 0.0960 0.94 0.16
TOTAL 7.5000 100.00 12.50 TOTAL 10.2000 100.00 17.00

Nut Water 1.2465 16.62 2.08 Final Effluent Water 31.3500 95.00 52.25
Oil 0.0300 0.40 0.05 Oil 0.3000 0.91 0.50
NOS 6.2235 82.98 10.37 NOS 1.3500 4.09 2.25
TOTAL 7.5000 100.00 12.50 TOTAL 33.0000 100.00 55.00

Wet Kernel Water 0.7290 18.00 1.22 Oil before Water 0.1306 0.90 0.22
Dry Kernel 3.3210 82.00 5.54 Purifier Oil 14.3762 99.07 23.96
TOTAL 4.0500 100.00 6.75 NOS 0.0044 0.03 0.01
TOTAL 14.5112 100.00 24.19
Shell Water 0.5175 15.00 0.86
Oil 0.0300 0.87 0.05 Oil after Water 0.0723 0.50 0.12
NOS 2.9025 84.13 4.84 Purifier Oil 14.3762 99.49 23.96
TOTAL 3.4500 100.00 5.75 NOS 0.0022 0.01 0.00
TOTAL 14.4507 100.00 24.08
Crude Oil Water 7.0486 30.76 11.75
ex Press (on the next diagram) Oil 14.6042 63.74 24.34 Oil to Storage Water 0.0216 0.15 0.04
NOS 1.2584 5.49 2.10 Oil 14.3762 99.84 23.96
TOTAL 22.9112 100.00 38.19 NOS 0.0022 0.02 0.00
TOTAL 14.4000 100.00 24.00

You might also like