Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

TOLLING, OPERATION, MANTENANCE AND

TRANSFER OF ANKAPALLI TO ANNAVARAM


SECTION (FROM KM 741+255 TO KM 830+525)
OF NH5 (NEW NH-16) IN THE STATE OF ANDHRA PRADESH REPAIR&REHABILITATION REPORT

ROB
@ CHAINAGE KM 808+840 (L.H.S)

ASSET INVENTORY & VISUAL INSPECTION REPORT

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

A. SALIENT DEATAILS OF THE BRIDGE


Location / Chainage KM 808+840 L.H.S
Year of Construction 2004
Name of the Road NH 16 Ankapalli to Annavaram Section
Type of Bridge ROB
Length 48.4 m
Span Arrangement 1 x 18.9 + 1 x 35.6 m (As per Sch-B 1 x 18.79 +1 x 37.03)
Carriageway Width 11.0 m
Deck Width 13.80 m
Skew Yes
Presence of Footpath Yes
Date of inspection 26/10/2019

B. APPROACHES
Condition of Approach Slab Good
Condition of Pavement Surface Good

C. PROTECTIVE WORKS
Quadrant Pitching Not visible covered with dense vegetation.

D. WATERWAY
Any Obstructions? NA

E. FOUNDATION
Type of Foundation Not Visible
Any Settlements? Not visible
Any Erosion / Cavitation? NA
Any Cracking / Disintegration? Not Visible

F. SUBSTRCTURE
DESCRIPTION A1 P1 A2
RCC / Brick/ Stone RCC RCC RCC
Type of Piers & Abutments Wall Trestle Wall
Condition of RCC
Cracking No No No
Leaching No No No
Presence of Weep Holes Yes - Yes
Condition of RE wall Good - Good
Fungus
General - growth -
observed

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

G. BEARINGS & PEDESTALS


Condition of Pedestals Good
Type of Bearings Neoprene

H. SUPERSTRUCTURE
Type of Superstructure RCC & PSC Girder
Span Arrangement 1 x 18.9 + 1 x 35.6 m
Spalling of Concrete No
Cracking No

I. EXPANSION JOINTS
Condition of Expansion Joint Fully clogged
Is Joint Functioning? Yes
Are Joints Clogged? Yes

J. DRAINAGE SPOUTS
Are drainage spouts provided with long Yes
down take pipes extending 500 mm below
slab?

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

Are drainage spouts clogged? Yes

K. HANDRAIL
Are Handrail / Parapet Present Parapet wall on one side & RCC Crash barrier
on another side.
Type of Handrail RCC
Condition of Handrail Good

L. CONDITION STATUS BASED ON FINDINGS OF VISUAL INSPECTION


a) Fungus growth observed on pier caps.
b) Expansion joints are fully clogged.
c) Vegetation observed on returns in abutment location.

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

ROB
@ CHAINAGE KM 808+840(R.H.S)

ASSET INVENTORY & VISUAL INSPECTION REPORT

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES
A. SALIENT DEATAILS OF THE BRIDGE
Location/Chainage KM 808+840 R.H.S
Year of Construction 1970
Name of the Road NH 16 Ankapalli to Annavaram Section
Type of Bridge ROB
Length 50.15 m
Span Arrangement 1 x 16.85 + 1 x 16.0 + 1 x 17.3 m
Carriageway Width 8.50 m
Deck Width 10.8 m
Skew Yes
Presence of Footpath No
Date of inspection 26/10/2019

B. APPROACHES
Condition of Approach Slab Good
Condition of Pavement Surface Good

C. PROTECTIVE WORKS
Quadrant Pitching Covered with fully vegetation
Floor Protection Works NA

D. WATERWAY
Any Obstructions NA

E. FOUNDATION
Type of Foundation Not visible
Any Settlements Not visible
Any Erosion / Cavitation NA
Any Cracking / Disintegration Not Visible

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

F. SUBSTRCTURE
DESCRIPTION A1 P1 P2 A2
RCC / Brick/ Stone RCC RCC RCC RCC
Type of Piers & Abutments Wall Wall Wall Wall
CONDITION OF RCC
Cracking Yes Yes Yes Yes
Leaching No No No No
Presence of Weep Holes Yes - - Yes
Condition of Wing Walls Vegetation growth - - Vegetation growth

G. BEARINGS& PEDESTALS
Condition of Pedestals No Pedestals.
Type of Bearings No Bearing seen.

H. SUPERSTRUCTURE
Type of Superstructure RCC 5- Girder with slab.
Span arrangement 1 x 16.85 + 1 x 16.0 + 1 x 17.3 m
Spalling of Concrete Yes
Cracking No
Reinforcement exposed Yes

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

I. EXPANSION JOINTS
Condition of Expansion Joint Buried under bituminous layers
Is Joint Functioning? Yes
Are Joints clogged? Yes
General Vegetation observed on EJ location

J. DRAINAGE SPOUTS
Are drainage spouts provided with long Yes
down take pipes extending up to 500mm
below slab?
Are drainage spouts clogged? Yes

ANKAPALLI TOLLWAYS PRIVATELIMITED


TOLLING, OPERATION, MANTENANCE AND
TRANSFE R OF ANKAPALLI TO ANNAVARAM ASSET INVENTORY & VISUAL INSPECTION REPORT
SECTION (FROM KM 741+255 TOKM 830+525 )
OF NH5 ( NEW NH-16 ) IN THE STATE OF ANDHRA PRADES

K. HANDRAILS
Are Handrail / Parapet Present Parapet
Type of Parapet RCC
Condition of Parapet Good

L. CONDITION STATUS BASED ON FINDINGS OF VISUAL INSPECTION


a) Expansion joints buried under debris.
b) Footpath planks were damaged.
c) Vegetation observed at abutment cap and pier cap.
d) Vegetation fully covers on quadrant pitching.
e) A1 location weep holes blocked.
f) Previous repairs to construction joints.
g) Leaching observed on deck soffit.
h) Fungus growth observed on Super and substructure.
i) Corroded reinforcement exposed on Super and substructure.
j) Vegetation growth observed in Expansion joint location.