Estimasi Cadangan Minerba: PPSDM Geominerba 10 Juni 2020
Estimasi Cadangan Minerba: PPSDM Geominerba 10 Juni 2020
PPSDM Geominerba
10 Juni 2020
Andre Alis
• S1 (Mining Engineering ITB) 1982 -1988, MBA (SBM ITB) 2018 - 2020
• 1988 – 1993, KPC (No. peg. 59), Mine Planning Engineer, etc.
• 1993 – 1995, Vietmindo (anthracite, North Vietnam), Development Manager
• 1995 - now, Independent Consultant/ Adviser - Mining Engineering & Business
• 1997 – 2004, Business Development & Project Management (Palm oil Refinery
project, Oil& Gas Facility construction, etc.)
• 2005 – now, Adviser/ Facilitator - Mining Competency Development
Facilitator - various Mine Planning related activities, KCMI Code, etc.
• 2006 - now, Lecturer – Teknik Tambang Trisakti (MTT 6219 Mining Project Development)
• 2007 - now, Audit Committee dan Risk Oversight Committee - Mining Companies
• Professional Membership :
• PERHAPI (1992 - ), (Mar 2016 – Mar 2019) Chairman for CP Committee PERHAPI
• IKAI (2007 -, CACP No 1009), PII (2006 - , IPM No 2-14-00-000036-00), (2019 - :
Member of SOMP – Society of Mining Professor, No. 5019)
• 2008 – now, Competency Assessor, BNSP, No. reg. MET.000.001648 2008 A
• 2012 – now, CPI Coal Reserves Reporting, No. reg. 9200467.009
• 2019 – now, Learning Propensity Assessment Device (LPAD), Assessor No. reg. 53417
Agenda
Prolog
A. Dasar Estimasi Cadangan Minerba
Primary
1 7.670 0,007 3.225 0,003
Gold
7 Manganese 15 6,3 4 3
Ferro and Associates : Fe, Nickel, Cobalt, Chromit , Mangan,
Molibdenum, Titanium 8 Zinc 625 7,3 6 0,8
Precious Metal : Gold, Silver, Platinum 9 Tin 449 2,1 801 0,4
Base Metal : Zinc, Copper, Tin, Lead, Mercury 10 Silver 13.755 0,8 3.253 0,0
Light and Rare metal : Bauxite, Monasit Source : Geology Agency, MEMR, 2013
Ref Internet
download
(?)why
tidak semua mineral
dirancang
untuk di-eksploitasi
(?)Why
Ada mineral
yang ditinggal?
Ilustrasi Konsep Keekonomian Tambang #)
Yang dirancang
untuk di-eksploitasi
@ final pit limit design
= Cadangan
Adapted from
Porter’s ref. Juan Camus, 2011
value chain model
(1985)
Ilustrasi Kegiatan Penambangan
(Bagian Produksi dari Proses Mining Value Chain)
Pproduk,
point of sale
Revenue
match
cost
Ref. ptfi.co.id
Ilustrasi Kegiatan Penambangan #)
(Bagian Produksi dari Proses Mining Value Chain)
Pproduk,
point of sale
Revenue
match
cost
Ref. Website
(Hustrulid, 2013)
Ore : A natural aggregation of
one or more solid minerals that
can be mined, processed and
Further Elaboration: sold at a profit
(?)How to
ensure, layak
Teknik + Sosial-Enviro
&
Ekonomis
Cadangan Miner-ba =
Indikator keekonomian
Prospek/ Proyek Tambang
(?) 2. How
(?)1. How Menentukan
Me-model-kan & Batas-tambang
menentukan or
batas-Sumberdaya Meng-Estimasi
or cadangan
Meng-Estimasi
Sumberdaya
w/ Implementasi
w/ Resources Metodologi
modelling & Mine Planning
estimation (Economically
(RPEEE) Mineable)
a measure of a measure of
mineralization recoverable ore
2. SKKNI
(~ standar kompetensi pelaku pelaporan)
1. SKKNI No. 98/ 2019 … pelaporan hasil eksplorasi
2. SKKNI No. 88/2019 … pelaporan sumberdaya
3. SKKNI No. 40/2019 … pelaporan cadangan
Apa yang dilaporkan?
Estimasi & Klasifikasi:
Tonase; and
Kadar atau kualitas
#) Kerangka Kerja Pelaporan HE – S/d – C/d
Akurasi tinggi,
dasar pembiayaan
Triple-Bottom-Line komersialisasi proyek
Eksplorasi
bertahap
NO-Go
Kegiatan Eksplorasi dan
Go Feasibility Study,
menghasilkan:
Feasibility Study Laporan Hasil Eksplorasi
(Tech., Enviro. & Econ). Laporan Sumberdaya
Laporan Cadangan
NO-Go
Go Cadangan Terbukti
Commercial
? Apakah semua
“tanah kosong,
berprospek miner-ba”
menjadi Ref. Mineral Ed, BC, Canada
tambang komersial (modified)
Exploration Success Ratio
S/d C/d
• ‘Eksplorasi-2’ Go NO-Go
Study NO-Go
• Feasibility study
• Project financing Go NO-Go
Go
(Next Tahap)
Go Project development
Money
Mulut
tambang
• BV = Block value in $ ? ?
• P = Commodity price in $ per recovered metal unit
• S = “Selling cost” in $ per recovered metal unit
• R = overall metal recovery (fraction)
• G = block grade
• H = “Process cost” in $ per ore tonne
• O = Ore tonnes
• M = “Mining cost” in $ per rock tonne
• T = Rock tonnes
Nilai jualan
di
Mulut tambang
Ongkos s/d
di
Mulut Tambang
adjust. Elkington 2019
What are Metodologi dan Praktik ? #)
dapat di-representasi
• Methodology (metodologi) Dengan Flowchart
(Bristish Dictionary)
the system of methods and principles used in a particular discipline
Go Go
NO-Go
NO-Go
Financial
Engineerig NO-Go NO-Go
NO-Go
Go Go Go
Komersial
Kelemahan Cadangan = tonase & kualitas, minerba bagian Adapt. fr. Lufi Rachmad, 2017,
calon CPI sumberdaya yang economically mineable ref SNI 4726, fig 3/ SNI 5015, fig 2
Cadangan
Pengukuran Kelayakan Ekonomis Tambang
(Kerangka Corporate Finance) #)
• Parameter dasar
• Net Present Value (NPV) What is the basis?
DCF method
• Internal Rate of Return (IRR) Projected
• Payback Period (PB) Non-DCF method Cash Flow
Economically
mineable, IF
• IRR > criteria/
• NPV > 0
Smith, 2010
Mining Sequence Vs Projected Cashflow
Economically
Mineable
(maybe)
Cadangan
Tidak terwujud
Consequences
• Tingkat produksi
• Cut-off grade / Stripping ratio
• Mining sequence berubah, dll