Project: “Rehabilitation and up-gradation of Kundral to Wazar from km 52+730 to km 99+250 of NH -161A two lane with paved

shoulder in the state of Maharashtra on (EPC) mode.

CLIENT Ministry of Road Transport & Highways ( PWD-NH DIVISION , GOV. MAHARASHTRA)

AUTHORITY'S ENGINEER M/S TPF Engineering Pvt. Ltd.

EPC CONTRACTOR Ajaydeep Construction Pvt. Ltd.

RAPPID MOISTURE METER CALIBRATION


Sample Description: RMM Calibration Date of Calibration :
Proposed Use: For Field Density Next Calibration Date :

A ctual m oisture content


RMM No.:
RMM Reading As per Graph RMM Reading As per Graph
in Moisture Content in Moisture Content
% %
Water RMM
OVEN DRY 0.5 0.69 10.5 10.73
Added Reading in Moisture Content 18 1.0 1.18 11.0 11.23
% % 1.5 1.69 11.5 11.73
1 1.0 1.16 16 2.0 2.19 12.0 12.23
f(x) = 1.00370076 x + 0.18634342
2 1.5 1.73 14 2.5 2.70 12.5 12.73
3 2.5 2.88 3.0 3.20 13.0 13.23
4 3.5 3.87 12 3.5 3.70 13.5 13.74
5 4.5 4.78 10 4.0 4.20 14.0 14.24
6 5.5 5.65 4.5 4.70 14.5 14.74
8
7 7.0 7.06 5.0 5.20 15.0 15.24
8 7.5 7.72 6 5.5 5.71 15.5 15.74
9 9.0 9.06 6.0 6.21 16.0 16.25
4
10 10.0 10.04 6.5 6.71 16.5 16.75
11 11.0 11.04 2 7.0 7.21 17.0 17.25
12 11.5 11.68 7.5 7.71 17.5 17.75
0
13 12.5 12.62 0 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 8.0 8.22 18.0 18.25
14 14.0 14.06 8.5 8.72 18.5 18.75
15 14.5 14.68 9.0 9.22 19.0 19.26
16 15.0 15.76 9.5 9.72 19.5 19.76
RMM READING
17 16.0 16.42 10.0 10.22 20.0 20.26

EPC Contractor Representative Authority's Representative


Project: “Rehabilitation and up-gradation of Kundral to Wazar from km 52+730 to km 99+250 of NH -161A two lane with paved
shoulder in the state of Maharashtra on (EPC) mode.

CLIENT Ministry of Road Transport & Highways ( PWD-NH DIVISION , GOV. MAHARASHTRA)

AUTHORITY'S ENGINEER M/S TPF Engineering Pvt. Ltd.

EPC CONTRACTOR Ajaydeep Construction Pvt. Ltd.

RAPPID MOISTURE METER CALIBRATION


Sample Description: RMM Calibration Date of Calibration :
Proposed Use: For Field Density Next Calibration Date :

A ctual m oisture content


RMM No.:
RMM Reading As per Graph RMM Reading As per Graph
in Moisture Content in Moisture Content
% %
Water RMM
OVEN DRY 0.5 0.75 10.5 10.90
Added Reading in Moisture Content 18 1.0 1.26 11.0 11.41
% % 1.5 1.77 11.5 11.92
1 1.0 1.02 16 2.0 2.27 12.0 12.43
f(x) = 1.01527482 x + 0.24366108
2 1.5 1.94 14 2.5 2.78 12.5 12.93
3 2.5 3.06 3.0 3.29 13.0 13.44
4 3.5 3.94 12 3.5 3.80 13.5 13.95
5 4.5 4.90 10 4.0 4.30 14.0 14.46
6 5.5 6.06 4.5 4.81 14.5 14.97
7 7.0 7.12 8 5.0 5.32 15.0 15.47
8 7.5 7.88 6 5.5 5.83 15.5 15.98
9 9.0 9.08 6.0 6.34 16.0 16.49
10 10.0 10.06 4 6.5 6.84 16.5 17.00
11 11.0 11.04 2 7.0 7.35 17.0 17.50
12 11.5 11.84 7.5 7.85 17.5 18.01
13 12.5 12.96 0 8.0 8.37 18.0 18.52
0 1 2 3 4 5 6 7 8 9 1011 12 13141516
14 14.0 14.22 8.5 8.87 18.5 19.03
15 14.5 15.16 9.0 9.38 19.0 19.53
16 15.0 15.88 9.5 9.89 19.5 20.04
RMM READING
17 16.0 16.72 10.0 10.40 20.0 20.55

EPC Contractor Representative Authority's Representative


Project: “Rehabilitation and up-gradation of Kundral to Wazar from km 52+730 to km 99+250 of NH -161A two lane with paved
shoulder in the state of Maharashtra on (EPC) mode.

CLIENT Ministry of Road Transport & Highways ( PWD-NH DIVISION , GOV. MAHARASHTRA)

AUTHORITY'S ENGINEER M/S TPF Engineering Pvt. Ltd.

EPC CONTRACTOR Ajaydeep Construction Pvt. Ltd.

RAPPID MOISTURE METER CALIBRATION


Sample Description: RMM Calibration Date of Calibration :
Proposed Use: For Field Density Next Calibration Date :

A ctual m oisture content


RMM No.: 3
RMM Reading As per Graph RMM Reading As per Graph
in Moisture Content in Moisture Content
% %
Water RMM
OVEN DRY 0.5 0.77 10.5 10.82
Added Reading in Moisture Content 18 1.0 1.28 11.0 11.33
% % 1.5 1.78 11.5 11.83
1 1.0 1.04 16 2.0 2.28 12.0 12.33
f(x) = 1.00591733 x + 0.271947731
2 1.5 1.88 14 2.5 2.78 12.5 12.83
3 2.5 2.97 3.0 3.29 13.0 13.34
4 3.5 4.02 12 3.5 3.79 13.5 13.84
5 4.5 4.98 10 4.0 4.29 14.0 14.34
6 5.5 6.01 4.5 4.79 14.5 14.84
8
7 7.0 7.18 5.0 5.30 15.0 15.35
8 7.5 7.75 6 5.5 5.80 15.5 15.85
9 9.0 9.00 6.0 6.30 16.0 16.35
4
10 10.0 10.02 6.5 6.80 16.5 16.85
11 11.0 11.10 2 7.0 7.31 17.0 17.36
12 11.5 11.72 7.5 7.81 17.5 17.86
0
13 12.5 12.80 0 1 2 3 4 5 6 7 8 9 1011 12 13 14 15 16 8.0 8.31 18.0 18.36
14 14.0 14.30 8.5 8.81 18.5 18.86
15 14.5 15.00 9.0 9.32 19.0 19.37
16 15.0 15.62 9.5 9.82 19.5 19.87
RMM READING
17 16.0 16.60 10.0 10.32 20.0 20.37

EPC Contractor Representative Authority's Representative


Project: “Rehabilitation and up-gradation of Kundral to Wazar from km 52+730 to km 99+250 of NH
shoulder in the state of Maharashtra on (EPC) mode.

CLIENT Ministry of Road Transport & Highways ( PWD-NH DIVISION , GOV. MAHARASHTRA)

AUTHORITY'S ENGINEER M/S TPF Engineering Pvt. Ltd.

EPC CONTRACTOR Ajaydeep Construction Pvt. Ltd.

RAPPID MOISTURE METER CALIBRATION


Sample Description: RMM Calibration
Proposed Use: For Field Density

A ctual m oisture content

Water RMM
OVEN DRY
Added Reading in Moisture Content 18
% %
1 1.0 1.10 16
2 1.5 1.65
f(x) = 1.00370076 x + 0.18634342
14
3 2.5 2.84
4 3.5 3.88 12
5 4.5 4.78 10
6 5.5 5.70
7 7.0 7.08 8
8 7.5 7.72 6
9 9.0 9.08
10 10.0 10.15 4
11 11.0 11.06 2
12 11.5 11.60
13 12.5 12.62 0
0 1 2 3 4 5 6 7 8 9 10 11 1213 14 15 16
14 14.0 14.10
15 14.5 14.68
16 15.0 15.74
RMM READING
17 16.0 16.42

EPC Contractor Representative Authority's


m 52+730 to km 99+250 of NH -161A two lane with paved
tra on (EPC) mode.

ON , GOV. MAHARASHTRA)

ALIBRATION
Date of Calibration :
Next Calibration Date :
RMM No.: 1
RMM Reading As per Graph RMM Reading As per Graph
in Moisture Content in Moisture Content
% %
0.5 0.68 10.5 10.71
1.0 1.18 11.0 11.21
1.5 1.69 11.5 11.72
2.0 2.19 12.0 12.22
2.5 2.69 12.5 12.72
3.0 3.19 13.0 13.22
3.5 3.69 13.5 13.72
4.0 4.19 14.0 14.22
4.5 4.69 14.5 14.72
5.0 5.20 15.0 15.23
5.5 5.70 15.5 15.73
6.0 6.20 16.0 16.23
6.5 6.70 16.5 16.73
7.0 7.20 17.0 17.23
7.5 7.70 17.5 17.73
8.0 8.21 18.0 18.24
8.5 8.71 18.5 18.74
9.0 9.21 19.0 19.24
9.5 9.71 19.5 19.74
10.0 10.21 20.0 20.24

Authority's Representative
Project: “Rehabilitation and up-gradation of Kundral to Wazar from km 52+730 to km 99+250 of NH
shoulder in the state of Maharashtra on (EPC) mode.

CLIENT Ministry of Road Transport & Highways ( PWD-NH DIVISION , GOV. MAHARASHTRA)

AUTHORITY'S ENGINEER M/S TPF Engineering Pvt. Ltd.

EPC CONTRACTOR Ajaydeep Construction Pvt. Ltd.

RAPPID MOISTURE METER CALIBRATION


Sample Description: RMM Calibration
Proposed Use: For Field Density

A ctual m oisture content

Water RMM
OVEN DRY
Added Reading in Moisture Content 18
% %
1 1.0 1.10 16
2 1.5 1.65
f(x) = 1.00370076 x + 0.18634342
14
3 2.5 2.84
4 3.5 3.88 12
5 4.5 4.78 10
6 5.5 5.70
7 7.0 7.08 8
8 7.5 7.72 6
9 9.0 9.08
10 10.0 10.15 4
11 11.0 11.06 2
12 11.5 11.60
13 12.5 12.62 0
0 1 2 3 4 5 6 7 8 9 10 11 1213 14 15 16
14 14.0 14.10
15 14.5 14.68
16 15.0 15.74
RMM READING
17 16.0 16.42

EPC Contractor Representative Authority's


m 52+730 to km 99+250 of NH -161A two lane with paved
tra on (EPC) mode.

ON , GOV. MAHARASHTRA)

ALIBRATION
Date of Calibration :
Next Calibration Date :
RMM No.: 1
RMM Reading As per Graph RMM Reading As per Graph
in Moisture Content in Moisture Content
% %
0.5 0.68 10.5 10.71
1.0 1.18 11.0 11.21
1.5 1.69 11.5 11.72
2.0 2.19 12.0 12.22
2.5 2.69 12.5 12.72
3.0 3.19 13.0 13.22
3.5 3.69 13.5 13.72
4.0 4.19 14.0 14.22
4.5 4.69 14.5 14.72
5.0 5.20 15.0 15.23
5.5 5.70 15.5 15.73
6.0 6.20 16.0 16.23
6.5 6.70 16.5 16.73
7.0 7.20 17.0 17.23
7.5 7.70 17.5 17.73
8.0 8.21 18.0 18.24
8.5 8.71 18.5 18.74
9.0 9.21 19.0 19.24
9.5 9.71 19.5 19.74
10.0 10.21 20.0 20.24

Authority's Representative