Monitoring and Evaluation of Sediment Control Structure (Sabo Dam)
Monitoring and Evaluation of Sediment Control Structure (Sabo Dam)
Internship Report
By:
Ricky Priyatmoko
121314317
i
MONITORING AND EVALUATION OF SEDIMENT CONTROL
STRUCTURE (SABO DAM)
Internship Report
By:
Ricky Priyatmoko
121314317
ii
2015
APPROVAL
Internship Report
OPERATION AND MAINTENANCE OF SEDIMENT CONTROL
STRUCTURE (SABO DAM)
By:
Ricky Priyatmoko
121314317
Approved by Supervisor
Head of Civil Engineering Department
iii
APPROVAL
Internship Report
OPERATION AND MAINTEENANCE OF SEDIMENT CONTROL
STRUCTURE (SABO DAM)
By:
Ricky Priyatmoko
121314317
Approved by Secretary
Head of Sedimentation Disaster Treatment of
River and Beach Division
iv
ASSISTANCY PAGE
INTERNSHIP REPORT
CIVIL ENGINEERING DEPARTMENT
FACULTY OF ENGINEERING
UNIVERSITAS ATMA JAYA YOGYAKARTA
v
PREFACE
First and foremost, the author would like to say thanks to God for His
blessings so that the writer could prepare and finish this internship report.
This report was arranged as a requirement to complete bachelor degree at Civil
Engineering International Program, Department of Engineering, Universitas Atma
Jaya Yogyakarta.
This internship report is written from the perspective of the writer for six months,
since August 3rd, 2015 until January 31st, 2016 in the PPK Sedimentation Disaster
Treatment office.
vi
6. All staff of Sedimentation Disaster Treatment of River and Beach Division
7. My parents who always support, praises and give motivation to writer
8. All my friends in Civil Engineering Program and Civil Engineering
International Program.
9. Everyone who helpful during preparation of the report who could not be
mentioned one by one
The writer realized that this report is imperfect, so that the writer welcomed critics
and suggestions in order to make the report became better. The writer hope this
report could be beneficial for the reader.
Ricky Priyatmoko
vii
CONTENTS
COVER ....................................................................................................... i
LEGALIZATION SHEET .......................................................................... iii
PREFACE ................................................................................................... vi
TABLE OF CONTENT .............................................................................. viii
CHAPTER I: Introduction........................................................................... 1
CHAPTER II: Operation of Sediment Control Structure............................ 8
CHAPTER III: Maintenance of Sediment Control Structure...................... 10
CHAPTER IV: Structure Monitoring.......................................................... 15
CHAPTER V: Emergency Action............................................................... 25
CHAPTER VI: Maintenance Works............................................................ 32
CHAPTER VII: Evaluation of Monitoring Result ...................................... 40
CHAPTER VIII: Conclusion and Recommendation .................................. 47
REFERENCES ............................................................................................ 49
APPENDIX ................................................................................................. 50
viii