MONITORING AND EVALUATION OF SEDIMENT CONTROL

STRUCTURE (SABO DAM)

Internship Report

By:
Ricky Priyatmoko
121314317

INTERNATIONAL CIVIL ENGINEERING PROGRAM


DEPARTMENT OF ENGINEERING
UNIVERSITAS ATMA JAYA YOGYAKARTA
2015

i
MONITORING AND EVALUATION OF SEDIMENT CONTROL
STRUCTURE (SABO DAM)

Internship Report

By:
Ricky Priyatmoko
121314317

INTERNATIONAL CIVIL ENGINEERING PROGRAM


DEPARTMENT OF ENGINEERING
UNIVERSITAS ATMA JAYA YOGYAKARTA

ii
2015
APPROVAL
Internship Report
OPERATION AND MAINTENANCE OF SEDIMENT CONTROL
STRUCTURE (SABO DAM)

By:
Ricky Priyatmoko
121314317

Has been checked and approved


Yogyakarta, 3 February 2016

Approved by Supervisor
Head of Civil Engineering Department

J. Januar Sudjati, S.T., M.T. Cita Adiningrum, S.T.

iii
APPROVAL
Internship Report
OPERATION AND MAINTEENANCE OF SEDIMENT CONTROL
STRUCTURE (SABO DAM)

By:
Ricky Priyatmoko
121314317

Has been checked and approved


Yogyakarta, 3 February 2016

Approved by Secretary
Head of Sedimentation Disaster Treatment of
River and Beach Division

Ovi Anton Nugroho, S.Si., M.Eng ( )

iv
ASSISTANCY PAGE
INTERNSHIP REPORT
CIVIL ENGINEERING DEPARTMENT
FACULTY OF ENGINEERING
UNIVERSITAS ATMA JAYA YOGYAKARTA

Name : Ricky Priyatmoko


Supervisor : Cita Adiningrum, S.T.

No Date Material Signature

v
PREFACE

First and foremost, the author would like to say thanks to God for His
blessings so that the writer could prepare and finish this internship report.
This report was arranged as a requirement to complete bachelor degree at Civil
Engineering International Program, Department of Engineering, Universitas Atma
Jaya Yogyakarta.

The reason to do this internship were:


1. To implement and practice the knowledge that obtained in University
2. To gain experience of civil engineering discipline and it implementation in
the real project
3. To fulfill the graduation requirement of bachelor of civil engineering
degree at Universitas Atma Jaya Yogyakarta

This internship report is written from the perspective of the writer for six months,
since August 3rd, 2015 until January 31st, 2016 in the PPK Sedimentation Disaster
Treatment office.

The writer would like to say thank you for:


1. Cita Adiningrum, S.T., as the writer’s internship advisor
2. J. Januar Sudjati, S.T., M.T., as Head of Civil Engineering Department in
Universitas Atma Jaya Yogyakarta
3. Prof. Yoyong Arfiadi, Ir., M.Eng., Ph.D., as the Dean of Engineering
Department in Universitas Atma Jaya Yogyakarta
4. Luky Handoko, S.T., M.Eng., Dr.Eng., as the Coordinator of Civil
Engineering International Program in Universitas Atma Jaya Yogyakarta
5. Ovi Anton Nugroho, S.Si., M.Eng, as the Head of Sedimentation Disaster
Treatment of River and Beach Division

vi
6. All staff of Sedimentation Disaster Treatment of River and Beach Division
7. My parents who always support, praises and give motivation to writer
8. All my friends in Civil Engineering Program and Civil Engineering
International Program.
9. Everyone who helpful during preparation of the report who could not be
mentioned one by one

The writer realized that this report is imperfect, so that the writer welcomed critics
and suggestions in order to make the report became better. The writer hope this
report could be beneficial for the reader.

Yogyakarta, 3 February 2016

Ricky Priyatmoko

vii
CONTENTS

COVER ....................................................................................................... i
LEGALIZATION SHEET .......................................................................... iii
PREFACE ................................................................................................... vi
TABLE OF CONTENT .............................................................................. viii

CHAPTER I: Introduction........................................................................... 1
CHAPTER II: Operation of Sediment Control Structure............................ 8
CHAPTER III: Maintenance of Sediment Control Structure...................... 10
CHAPTER IV: Structure Monitoring.......................................................... 15
CHAPTER V: Emergency Action............................................................... 25
CHAPTER VI: Maintenance Works............................................................ 32
CHAPTER VII: Evaluation of Monitoring Result ...................................... 40
CHAPTER VIII: Conclusion and Recommendation .................................. 47

REFERENCES ............................................................................................ 49
APPENDIX ................................................................................................. 50

viii

You might also like