JAP006-D73/COM/D21/2165

CONTRACT - JAP006-D73
132/11kV PALM,JUMEIRAH S/S (4 Nos)

11kV SWITCHGEAR VT CALCULATION

A) General Data : -

i) System Voltage , kV = 11kV

ii) System Fault current , If = 25 kA for 3 Sec.

iii) VT manufacturer = M/s. Tesar, Italy


(for S/S J1 & J2)

M/s. Risho, Japan


(for S/S J3 & J4)

B) Lead Resistance Calculation ( R L ) : -

The lead length from VT secondary to relay = 5 Meters

2.5 Sq.mm Cable

From Manufacturer's table ,

With a size of 2.5 Sq.mm cable the lead = 7.41 Ohms/kM


resistance at 200C
= 0.00741 Ohms/Meter

Temperature co-efficient of resistance ( a 20 ) = 0.00393

Lead Resistance , RL at 750C = R20 [ 1 + a 20 ( T2 - T1 ) ]

For 5 Meters , R20 = 0.03705 Ohms

Therefore RL at 750C = 0.045 Ohms


JAP006-D73/COM/D21/2165
I) 11kV - IDT Incomer Circuits : -

VT Ratio = 11kV 110V


3 3

Class of accuracy = Class 0.5

Vector Group = Y - Y

Rated Burden = 30 VA

Actual Burden On VT Secondary : -

1) Secondary ( Y - Y ) :

1.1) VT Monitoring relay - MVAP 22 = 6.35 VA

1.2) Power Factor Control Relay - NOVAR 315 = 7 VA

1.3) KWhr - Prometer = 2 VA

1.4) BCU - REF 545 = 0.5 VA

Total Burden = 15.85 VA

1.5) Lead Burden :

The secondary current / phase based on the above VA burden .

IVT = Connected VA Burden / Phase


110V / 3

= 15.85
110V / 3

= 0.250

Hence lead burden = 2 x IVT2x RL

= 2 x 0.25 2 x 0.045
= 0.006 VA

Hence total connected burden = 15.85 + 0.006 = 15.856 VA

Required burden = 15.856 VA


Burden provided by the manufacturer = 30 VA

Hence VT Burden is adequate


JAP006-D73/COM/D21/2165
II ) 11kV - Outgoing Feeder Circuits With Metering : -

VT Ratio = 11kV 110V


3 3

Class of accuracy = Class 0.5

Vector Group = Y - Y

Rated Burden = 30 VA

Actual Burden On VT Secondary : -

1) Secondary ( Y - Y ) :

1.1) VT Monitoring relay - MVAP 22 = 6.35 VA

1.2) KWhr - Prometer = 2 VA

1.3) BCU - REF 545 = 0.5 VA

Total Burden = 8.85 VA

1.4) Lead Burden :

The secondary current / phase based on the above VA burden .

IVT = Connected VA Burden / Phase


110V / 3

= 8.85
110V / 3

= 0.139

Hence lead burden = 2 x IVT2 x RL

= 2 x 0.139 2 x 0.045
= 0.002 VA

Hence total connected burden = 8.85 + 0.002 = 8.852 VA

Required burden = 8.852 VA


Burden provided by the manufacturer = 30 VA

Hence VT Burden is adequate


JAP006-D73/COM/D21/2165
III ) 11kV - Capacitor Bank Feeders : -

VT Ratio = 11kV 110V


3 3

Class of accuracy = Class 0.5

Vector Group = Y - Y

Rated Burden = 30 VA

Actual Burden On VT Secondary : -

1) Secondary ( Y - Y ) :

1.1) VT Monitoring relay - MVAP 22 = 6.35 VA

1.2) Over Voltage & Under Voltage = 0.2 VA


relay - 7RW600

1.3) BCU - REF 545 = 0.5 VA

Total Burden = 7.05 VA

1.4) Lead Burden :

The secondary current / phase based on the above VA burden .

IVT = Connected VA Burden / Phase


110V / 3

= 7.05
110V / 3

= 0.111

Hence lead burden = 2 x IVT2 x RL

= 2 x 0.111 2 x 0.045
= 0.001 VA

Hence total connected burden = 7.05 + 0.001


= 7.051 VA

Required burden = 7.051 VA


Burden provided by the manufacturer = 30 VA
Hence VT Burden is adequate JAP006-D73/COM/D21/2165
JAP006-D73/COM/D21/2165
IV ) 11kV - Bus section : - [ Bus VT 1 , 2 & 3 ]

VT Ratio = 11kV 110V


3 3

Class of accuracy = Class 0.5

Vector Group = Y - Y

Rated Burden = 30 VA

Actual Burden On VT Secondary : -

1) Secondary ( Y - Y ) :

1.1) VT Monitoring relay - MVAP 22 = 6.35 VA

1.2) BCU - REF 545 = 6 VA ( 12 x 0.5 )


( For outgoing feeders without metering )

1.3) BCU - REF 545 = 0.5 VA

Total Burden = 12.85 VA

1.4) Lead Burden :

The secondary current / phase based on the above VA burden .

IVT = Connected VA Burden / Phase


110V / 3

= 12.85
110V / 3

= 0.202

Hence lead burden = 2 x IVT2 x RL

= 2 x 0.2022 x 0.045
= 0.004 VA

Hence total connected burden = 12.85 + 0.004 = 12.854 VA

Required burden = 12.854 VA


Burden provided by the manufacturer = 30 VA

Hence VT Burden is adequate