POINT WIRING MEASUREMENT SHEET

WIR : WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2


PRIMARY POINT SECONDARY POINT

SR Location/Zone DESCRIPTION Total No. of Corresp Controlled Remarks


NO. Points No. of Total Length Total Length Corresponding By
Length Breakup Points Detail onding From Length Breakup Points Detail
Points in Mtr SOQ no. in Mtr SOQ No.

1st to 2nd 0.5+2.5+0.8+2.4+21.2+4.3+1.3+2.5+0.5 38


B04-Z-A PDB1/BO4/3/B5
1 ELECTRICAL ROOM 3x4sq.mm wire 4 1 5.4+2.4+0.8+2.5+0.5 12.6 2nd to 3rd 0.5+2.5+1.3+4.3+16.4+0.8+2.5+0.5 30.8 MCB
3rd to 4th 0.5+2.5+0.8+4.2+30+2.8+4.2+0.4+2.5+0.5 50.4
1st to 2nd 0.5+2.5+0.4+2.2+3.8+21.3+5.5+1.2+2.5+0.5 42.4
B04-Z-A PDB1/BO4/3/Y6 2nd to 3rd 0.5+2.5+1.2+5.5+9.2+2.3+5.8+2.3+7+4.2+4+2.5+0.5 49.5
2 4 1 18.6+3.8+2.2+0.4+2.5+0.5 29 MCB
ELECTRICAL ROOM 3x4sq.mm wire
3rd to 4th 0.5+2.5+4+4.2+28.3+3+2.5+0.5 47.5
1st to 2nd 0.5+2.5+0.8+4.8+23.3+5.1+2+1.3+2.5+0.5 45.3
3 B04-Z-A PDB1/BO4/3/Y5 3 1 13.4+4.8+0.8+2.5+0.5 23 MCB
ELECTRICAL ROOM 3x4sq.mm wire 2nd to 3rd 0.5+2.5+1.3+2+5.1+30.5+12+1.3+2.5+0.5 60.2

Checked by Sub-contractor QS Engineer Checked by Samsung C&T QS Engineer Checked by Client (RIL)

NAME: SIGN.: DATE: NAME: SIGN.: DATE: NAME: SIGN. DATE:


POINT WIRING MEASUREMENT SHEET
WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2
PRIMARY POINT SECONDARY POINT

SR Total No. of Corresp Controlled


Location/Zone DESCRIPTION No. of Total Length Total Length Corresponding Remarks
NO. Points Length Breakup Points Detail onding From Length Breakup Points Detail By
Points in Mtr in Mtr SOQ No.
SOQ no.

B04-Z-F PDB1/BO4/2/B2
2 1 1 3.5+2.1+0.5+3.6+2.1+1.3+3.2+0.5 17.8 1st to 2nd 0.5+3.2+1.3+9+1+2.5+0.5 20 MCB
ELECTRICAL ROOM 3x4sq.mm wire

Checked by Sub-contractor QS Engineer Checked by Samsung C&T QS Engineer Checked by Client (RIL)

NAME: SIGN.: DATE: NAME: SIGN.: DATE: NAME: SIGN. DATE:


POINT WIRING MEASUREMENT SHEET
WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2
PRIMARY POINT SECONDARY POINT

SR Location/Zone DESCRIPTION Total No. of Corresp Controlled Remarks


NO. Points No. of Total Length Total Length Corresponding By
Length Breakup Points Detail onding From Length Breakup Points Detail
Points in Mtr SOQ no. in Mtr SOQ No.

B04-Z-Q PDB1/BO4/1A/Y6
1 1 1 0.5+0.4+1+0.5+2.7+2.4+2.5+0.5 11.5 MCB
ELECTRICAL ROOM 3x4sq.mm wire

3 B04-Z-Q PDB1/BO4/1A/B6 2 1 11.5+8+5.4+1+2.5+0.5 29.9 1st to 2nd 0.5+2.5+1+5.4+8+11.5+11.7+14.3+5.7+4.1+0.3+2.5+0.5 70 MCB


ELECTRICAL ROOM 3x4sq.mm wire

4 B04-Z-Q PDB1/BO4/1A/B7 2 1 13.2+2+5.7+2.5+0.5 24.9 1st to 2nd 0.5+2.5+5.7+10+1.5+6.8+2.2+0.7+2.5+0.5 34.9 MCB


ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1A/B3
5 2 1 4+3+1.3+2.5+0.5 12.3 1st to 2nd 0.5+2.5+1.3+3+4+2.6+3+0.5 19.4 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1A/R3 1st to 2nd 0.5+2.5+1.85+1.3+6.6+2.5+1.6+2.5+0.5 21.85
6 3 1 1.85+2.5+0.5 5.85 MCB
ELECTRICAL ROOM 3x4sq.mm wire 2nd to 3rd 0.5+2.5+1.6+2.5+25+1.6+2.5+0.5 38.7
B04-Z-Q PDB1/BO4/1A/B2
7 2 1 3+2+0.4+2.5+0.5 9.4 1st to 2nd 0.5+2.5+0.4+2+3+2+1.5+1.3+2.5+0.5 18.2 MCB
ELECTRICAL ROOM 3x4sq.mm wire
1st to 2nd 0.5+2.5+18.1+2+2.5+0.5 28.1
B04-Z-Q PDB1/BO4/1A/R5 3 1 3.6+4.7+11.1+5+2+2.5+0.5 30.4 2nd to 3rd 0.5+2.5+2+2.2+19.7+2.1+2+2.5+0.5 36 MCB
ELECTRICAL ROOM 3x4sq.mm wire

1st to 2nd 0.5+2.5+1.5+2.1+4.7+3+6.8+1+1.8+0.5 26.4


B04-Z-Q PDB1/BO4/1A/B4
2 1 30+7+2+1.5+2.5+0.5 44.5 MCB
ELECTRICAL ROOM 3x4sq.mm wire

B04-Z-Q PDB1/BO4/1A/B5 1st to 2nd 0.5+2.5+1.8+2+13.6+1.8+2.5+0.5 27.2


2 1 26.2+7+2+1.8+2.5+0.5 41 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1A/Y3
1 1 26.2+12.4+27+3.8+1.8+2.5+0.5 75.2 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/B4 1 1 3.3+1.4+2.5+0.5 8.7 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/Y4
1 1 11.1+1.7+0.4+2.5+0.5 17.2 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/R4
1 1 11.1+5.2+2.5+0.4+2.5+0.5 23.2 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/B3 1 1 11.1+6.7+1.3+2.5+0.5 23.1 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/Y3 1 1 11.1+8.1+1.4+0.4+2.5+0.5 25 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/R3
1 1 10.5+5.5+2.1+2.6+2.5+0.5 24.7 MCB
ELECTRICAL ROOM 3x4sq.mm wire
8 B04-Z-Q PDB1/BO4/1/B2
1 1 10.5+4+3+1.2+0.6+2.5+0.5 23.3 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/Y2 1 1 10.5+2.1+2.2+2.5+0.5 18.8 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/R2
ELECTRICAL ROOM 3x4sq.mm wire 1 1 12.6+4+2.5+0.5 20.6 MCB

B04-Z-Q PDB1/BO4/1/Y6 1 1 12.6+2+4.7+1.2+2.5+0.5 24.5 MCB


ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/B1
1 1 12.6+2+6.1+1.6+2+0.5 25.8 MCB
ELECTRICAL ROOM 3x4sq.mm wire
B04-Z-Q PDB1/BO4/1/B5
ELECTRICAL ROOM 3x4sq.mm wire 1 1 6.5+2.8+0.8+2.5+0.5 14.1 MCB

B04-Z-Q PDB1/BO4/1/Y5
ELECTRICAL ROOM 3x4sq.mm wire 1 1 6.5+3.7+2.3+1+2.5+0.5 17.5 MCB

B04-Z-Q PDB1/BO4/1/R5
1 1 6.5+3.7+3.2+1+2.5+0.5 18.4 MCB
ELECTRICAL ROOM 3x4sq.mm wire

Checked by Sub-contractor QS Engineer Checked by Samsung C&T QS Engineer Checked by Client (RIL)
POINT WIRING MEASUREMENT SHEET
WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2
PRIMARY POINT SECONDARY POINT

SR Location/Zone DESCRIPTION Total No. of Corresp Controlled Remarks


NO. Points No. of Total Length Total Length Corresponding By
Length Breakup Points Detail onding From Length Breakup Points Detail
Points in Mtr SOQ no. in Mtr SOQ No.

NAME: SIGN.: DATE: NAME: SIGN.: DATE: NAME: SIGN. DATE:


POINT WIRING MEASUREMENT SHEET
WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2
PRIMARY POINT SECONDARY POINT

SR Location/Zone DESCRIPTION Total No. of Corresp Controlled Remarks


NO. Points No. of Total Length Total Length Corresponding By
Length Breakup Points Detail onding From Length Breakup Points Detail
Points in Mtr SOQ no. in Mtr SOQ No.

Checked by Sub-contractor QS Engineer Checked by Samsung C&T QS Engineer Checked by Client (RIL)

NAME: SIGN.: DATE: NAME: SIGN.: DATE: NAME: SIGN. DATE:


POINT WIRING MEASUREMENT SHEET
WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2
PRIMARY POINT SECONDARY POINT

SR Location/Zone DESCRIPTION Total No. of Corresp Controlled Remarks


NO. Points No. of Total Length Total Length Corresponding By
Length Breakup Points Detail onding From Length Breakup Points Detail
Points in Mtr SOQ no. in Mtr SOQ No.

B04-Z-J PDB1/BO4/7/B5
1 ELECTRICAL ROOM 3x4sq.mm wire 2 1 1st to 2nd 0.5+2.5+0.8+2.2+6+7.2+24.7+1.6+2.5+0.5 50.5 MCB

Checked by Sub-contractor QS Engineer Checked by Samsung C&T QS Engineer Checked by Client (RIL)

NAME: SIGN.: DATE: NAME: SIGN.: DATE: NAME: SIGN. DATE:


POINT WIRING MEASUREMENT SHEET
WIR :10107-G189-PRE-CO000-2415 DRAWING REFERENCE NO:-10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-3/6016-2
PRIMARY POINT SECONDARY POINT

SR Location/Zone DESCRIPTION Total No. of Corresp Controlled Remarks


NO. Points No. of Total Length Total Length Corresponding By
Length Breakup Points Detail onding From Length Breakup Points Detail
Points in Mtr SOQ no. in Mtr SOQ No.

B04-Z-K PDB1/BO4/6/B7
1 ELECTRICAL ROOM 3x4sq.mm wire 1 1 1.2+2.5+0.5 5.2 MCB

Checked by Sub-contractor QS Engineer Checked by Samsung C&T QS Engineer Checked by Client (RIL)

NAME: SIGN.: DATE: NAME: SIGN.: DATE: NAME: SIGN. DATE:


DAICEC Project

MEASUREMENT SHEET

10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-
Drawing No: 3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-
Inspection Date: 3/6016-2
Level : B4 WIR No: 10107-G189-PRE-CO000-2415
Zone : ALL ZONE
Total length
Item No. Description Wiring Circuit Length (mtrs) (mtrs)

PDB1/BO4/3/B5
1 3 Nos. x 4 Sqmm Wire For Circuit in Raceway 3x4sq.mm wire 2+0.5+4.2+0.7+6.4 14.8

PDB1/BO4/3/Y6
2 3x4sq.mm wire 2+0.5+4.2+0.7+8.3 16.7

PDB1/BO4/3/Y5
3 3x4sq.mm wire 2+0.5+4.2+0.7+30+5 43.4
PDB1/BO4/2/B2
6 3x4sq.mm wire 2+0.5+1.2+0.7 5.4
PDB1/BO4/1A/Y6 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
7 3x4sq.mm wire 8+14.7+15+30+15.7+4.3+5.8 108.4
2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
PDB1/BO4/1A/B6
8 3x4sq.mm wire 8+14.7+15+30+15.7+4.3+5.8+15.5+ 144.4
1.5+0.7+15.3+3
PDB1/BO4/1A/B7 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
9 3x4sq.mm wire 8+14.7+15+26 78.6

10 PDB1/BO4/1A/B3 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4. 68.8


3x4sq.mm wire 8+9.2+5.7+30+1
PDB1/BO4/1A/R3
11 3x4sq.mm wire 2+0.5+1.7+0.7+5+4.5+24.5+5.2 45.1

1 PDB1/BO4/1A/B2 2+0.5+1.7+0.7+5+30+5.5+28.4+29. 104.5


3x4sq.mm wire 7

Checked by Sub-Contractor QS Engineer:


……………………………………………………………………………………………………………………………………………………………………………………………

NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….

Checked by Samsung C&T QS Engineer:


……………………………………………………………………………………………………………………………………………………………………………………………
NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….
Checked by Client (RIL) :
……………………………………………………………………………………………………………………………………………………………………………………………
NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….
DAICEC Project

MEASUREMENT SHEET

10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-
Drawing No: 3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-
Inspection Date: 3/6016-2
Level : B4 WIR No: 10107-G189-PRE-CO000-2415
Zone : ALL ZONE
Total length
Item No. Description Wiring Circuit Length (mtrs) (mtrs)

PDB1/BO4/1A/R5
13 3x4sq.mm wire 2+0.5+1.7+0.7+5+30+5.5+30+24.2 100.6

PDB1/BO4/1A/B4
14 3x4sq.mm wire 2+0.5+1.7+0.7+5+30+5.5+30+12.2 88.6

PDB1/BO4/1A/B5 2+0.5+1.7+0.7+5+30+5.5+30+30+3.
15 3x4sq.mm wire 6 110
PDB1/BO4/1A/Y3 2+0.5+1.7+0.7+5+30+5.5+30+30+3.
16 3x4sq.mm wire 6 110
PDB1/BO4/1/B4
17 3x4sq.mm wire 2+0.5+1.7+0.7+3.7+0.8+0.6+4.1 15.1
PDB1/BO4/1/Y4
18 3x4sq.mm wire 2+0.5+1.7+0.7+3.7+0.8+0.6+4.1 15.1

PDB1/BO4/1/R4
19 3x4sq.mm wire 2+0.5+1.7+0.7+3.7+0.8+0.6+4.1 15.1

PDB1/BO4/1/B3
20 3x4sq.mm wire 2+0.5+1.7+0.7+3.7+0.8+0.6+4.1 15.1

PDB1/BO4/1/Y3
21 3x4sq.mm wire 2+0.5+1.7+3.7+.8+0.6+4.1 14.4

PDB1/BO4/1/R3 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
22 3x4sq.mm wire 6+14.8+30+4.8 72.3
2+0.5+1.7+3.7+0.8+0.6+7.1+4.6+14
23 PDB1/BO4/1/B2 71.6
3x4sq.mm wire .8+30+4.8

Checked by Sub-Contractor QS Engineer:


……………………………………………………………………………………………………………………………………………………………………………………………

NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….

Checked by Samsung C&T QS Engineer:


……………………………………………………………………………………………………………………………………………………………………………………………
NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….
Checked by Client (RIL) :
……………………………………………………………………………………………………………………………………………………………………………………………
NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….
DAICEC Project

MEASUREMENT SHEET

Drawing No: 10107-E039-PRE-BSB04-6001-3/6002-3/6003-4/6004-3/6005-2/6006-


3/6007-3/6008-3/6009-3/6010-3/6011-2/6012-3/6013-3/6014-2/6015-
Inspection Date: 3/6016-2
Level : B4 WIR No: 10107-G189-PRE-CO000-2415
Zone : ALL ZONE
Total length
Item No. Description Wiring Circuit Length (mtrs)
(mtrs)

PDB1/BO4/1/Y2 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
24 3x4sq.mm wire 6+14.8+30+4.8 72.3

PDB1/BO4/1/R2 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
25 3x4sq.mm wire 6+14.8+30+4.8+4.5 76.8

PDB1/BO4/1/Y6 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4.
26 76.8
3x4sq.mm wire 6+14.8+30+4.8+4.5
27 PDB1/BO4/1/B1 2+0.5+1.7+0.7+3.7+0.8+0.6+7.1+4. 76.8
3x4sq.mm wire 6+14.8+30+4.8+4.5
PDB1/BO4/1/B5
28 3x4sq.mm wire 2+0.5+1.7+0.7+2 7.9
PDB1/BO4/1/Y5
29 3x4sq.mm wire 2+0.5+1.7+0.7+2 7.9

PDB1/BO4/1/R5
30 3x4sq.mm wire 2+0.5+1.7+0.7+2 7.9

31 PDB1/B04/7/B5 2+0.7+1.2 4.9


PDB1/BO4/6/B7
32 3x4sq.mm wire 3+0.7+1.8+1.5+6.2+19.2 32.4

Checked by Sub-Contractor QS Engineer:


……………………………………………………………………………………………………………………………………………………………………………………………

NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….

Checked by Samsung C&T QS Engineer:


……………………………………………………………………………………………………………………………………………………………………………………………
NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….
Checked by Client (RIL) :
……………………………………………………………………………………………………………………………………………………………………………………………
NAME…………………………………………………………..SIGN……………………...………………….DATE:………………………………………………….

You might also like