This document is a material list for the Riffa 400 kv substation project in Bahrain dated June 21, 2020. It contains 29 items needed for the project including an oil storage tank, oil filter machine, vacuum machine, empty oil barrels, toolboxes, fire extinguishers, desks, chairs, generators, safety equipment and more. The quantities of each item are provided.
This document is a material list for the Riffa 400 kv substation project in Bahrain dated June 21, 2020. It contains 29 items needed for the project including an oil storage tank, oil filter machine, vacuum machine, empty oil barrels, toolboxes, fire extinguishers, desks, chairs, generators, safety equipment and more. The quantities of each item are provided.
This document is a material list for the Riffa 400 kv substation project in Bahrain dated June 21, 2020. It contains 29 items needed for the project including an oil storage tank, oil filter machine, vacuum machine, empty oil barrels, toolboxes, fire extinguishers, desks, chairs, generators, safety equipment and more. The quantities of each item are provided.
SL Description Quantity NO 1 Oil storage Tank 22kl 1 nos 2 Oil filter machine with Hoses 1nos 3 Vacuum Machine with Hoses 1nos 4 Empty oil barrels 10nos 5 Toolbox set 1 set 6 Wooden pellets 10 nos 7 Nitrogen full cylinders 1nos 9 Manual oil pump 1nos 10 3 phase power cable 30 m 11 Fire extinguishers 1 nos 12 Working desk 2 nos 13 Oil tray big 3 nos 14 Roller Chairs 2 nos 15 Oil tray small 2 nos 16 Portacabin 1nos 17 Air conditioner 1nos 18 Refrigerator 1 nos 19 Water dispenser 1 nos 20 Water cans 2 nos 21 Wooden box 1 nos 22 Steel barrier gates 10 no 23 kettle 1 nos 24 Touch up materials 1 set 25 Spill kit 1 nos 26 Visitor chair 1 nos 27 Diesel generator 1 nos 28 Safety sign boards 2 nos 29 Safety harness 6 nos