WANZA CONSULTING ENGINEERS SDN BHD

CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

TABLE OF CONTENT

2.0 Project Background ......................................................................................................... 2

2.1 Description of Project.................................................................................................. 2

2.2 List of Project Stakeholders ........................................................................................ 3

2.3 Estimated Cost and Project Duration .......................................................................... 3

3.0 Location Of Project and Key plan .................................................................................. 4

4.0 Scope of Project .............................................................................................................. 6

5.0 Design Criteria ................................................................................................................ 6

5.1 Code of Practice .......................................................................................................... 7

5.2 Materials and Loading ................................................................................................. 7

6.0 Software .......................................................................................................................... 9

7.0 Work Program ................................................................................................................. 9

8.0 References ..................................................................................................................... 10

1
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

2.0 PROJECT BRIEFING

2.1 Description of Project

The purpose building is a 4 storey that consist of 5 classrooms for each floor.
Starting from ground floor until third floor at the same in term of architecture
design. Dimension for each classroom is 7500mm x 9000mm. Each floor has 2
stairs to connect from one floor to others floor. Each floor level has one
washroom and the dimension for washroom is 7500mm x 3000mm.

GROUND FLOOR FIRST FLOOR SECOND FLOOR,


THIRD FLOOR
5 Classroom 5 Classroom
1 Toilet 1 Toilet
2 Stairs 2 Stair
1 Corridor 1 Corridor

2
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

2.2 List of Project Stakeholders

Client Metrasia Construction Sdn. Bhd.


9A, Jln Flora 2, 83300 Batu Pahat, Johor

Architect Prolling Sage Sdn Bhd


12A, Jalan Kundang 3a, Taman Bukit Pasir, 83300 Batu
Pahat, Johor

Town planner Z & S Venture Sdn. Bhd.


Jalan Menteri 12, Commercial Park, 83300 Batu Pahat, Johor

C & S Engineers Wanza Consulting Engineers Sdn Bhd.


33-1, Jalan Wangsa Delima 5 (Jalan 2/2F), Pusat Bandar
Wangsa Maju (KLSC) Seksyen 5, 53300 Kuala Lumpur.

M&E Engineers Perunding TAG Sdn. Bhd.


No 3 & 4, Jalan Peraga, Kampung Pegawai, 83300 Batu
Pahat, Johor

Quantity surveyor Jurukur T & T Sdn. Bhd.


No 13, Jalan Timah Hitam, Kampung Kenangan Dato Onn,
83300 Batu Pahat, Johor

2.3 Estimated Cost and Project Duration

Estimated Project Cost RM 32,124,000


Estimated Project Duration Time 14 Weeks (3 Months and 2 Weeks)

3
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

3.0 LOCATION OF PROJECT AND KEY PLAN

This project is located Tanjung Labuh, 83300 Batu Pahat, Johor. The site is located along
Jalan Batu Pahat-Kluang. It lies south-east of Batu Pahat town, north-west of Ayer Hitam
and west of Yong Peng. The total area of the site is 20 hectares. The nearest city from
Tanjung Labuh is Batu Pahat. The estimated distance from the site to the town is about
5.20 km.

Figure 2 : Location Plan

4
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

Figure 3 : Key Plan

5
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

4.0 SCOPE OF PROJECT

Metrasia Construction Sdn. Bhd. has proposed to build a 4 storey Cluster School at Pura
Kencana, Johor. Wanza Consulting Engineers Sdn. Bhd as a C&S engineers work
together with architecture team to design, monitor and check the construction on each
step of the construction of 4 storey building. Starting from ground floor until fourth floor
at the same in term of architecture design. Dimension for each classroom is 7500mm x
9000mm. The whole completion of the project will be done in 4 months (February 2020
to May 2020).

5.0 DESIGN CRITERIA

5.1 Code of Practice

 Malaysian Standard MS EN documents on Design Structures:


 MS EN 1990 – Eurocode – Basis of Structural Design
 Ms EN 1991 – Eurocode 1 – Actions on Structures
 MS EN 1992 – Eurocode 2 – Design of Concrete Structures
 MS EN 1997 – Eurocode 7 – Geotechnical Design

 Malaysian National Annexes Documents to Eurocodes:


 MS EN 1990:2010 – Malaysia National Annex to Eurocode
 MS EN 1991-1-1: 2010 – Malaysia National Annex to Eurocode 1: General
Actions – Densities, Self-weight, Imposed Loads For Buildings
 MS EN 1992-1-1: 2010 – Malaysia National Annex to Eurocode 2: Design
of Concrete Structure – Part 1-1: General Rules for Building Structures

6
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

 MS EN 1997-1: 2012 – Malaysia National Annex to Eurocode 7:


Geotechnical Design – Part 1: General Rules
 Uniform Buildings By Laws (UBBL) – Which had its latest amendments
approved in 2012 – custodian of the UBBL in the Ministry of Housing &
local Government. Implementers are the local authorities.

5.2 Code of Practice

Items Specification References


Design Life 50 Years Table NA:MS EN
1990:00 2010
National Annex
Exposure Class XC1 (Dry or permanently wet Table 4.1 MS EN
 Concrete inside 1992-1-1-1:2010
building with low air
humidity.
 Concrete permanently
submerged in water.
Fire Resistance R 60 (1 hour) Table 5.8 EN 1992-
 Minimum slab 1-2
thickness for fire
resistance = 80mm
 Minimum width beam
= 120mm
Characteristic strength of 30 N/mm2 Table F.1 EN 206
concrete, fck
Characteristic strength of 500 N/mm2
steel, fyk

7
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

Unit weight of reinforced 25 kN/m3 Table A.1 EN 1991-


concrete 1

Concrete Cover Cnom = Cmin + ΔCdev Table 4.2


Table 4.4 N
Cl 4.4.1.2
Cl 4.4.13
Cl 4.4.1.1 (2)
Permanent Load, gk BS EN 1991-1-

3
Reinforced 25 kN/m 1:2002
Concrete
 Brickwork 2.40 kN/m2 EN 1991-1-1:2002
 Plaster Skim Coat 0.05 kN/m2 (E)

 Services 0.30 kN/m2

 Tile ceramic floor 1.00 kN/m2

 Suspended ceiling 0.15 kN/m2

Variable load, qk 2.00 kN/m2 BS EN1991-1-


1:2002
EN 1991-1-1:2002
Soil bearing capacity 200 kN/mm2 Specified by:
At 2m depth. Geotech
Engineering Sdn.
Bhd.
Structural factor of safety 1.35 for permanent action, Gk Table A1.2B : EN
1.5 for variable action, Qk 1990

8
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

6.0 SOFTWARE

The software that had been used in this project is:

i AutoCad
Draw the shape of structure in flexible features found in AutoCad design and
documentation software, one of the world’s leading 2D and 3D CAD tools.

ii Esteem (Version x 9.0)


Esteem is a total integrated solution computer program that offers the complete
package in reinforced concrete design

7.0 WORK PROGRAM

9
WANZA CONSULTING ENGINEERS SDN BHD
CADANGAN MEMBINA DAN MENYIAPKAN SEKOLAH CLUSTER 4 TINGKAT DI TANJUNG LABUH, 83300
BATU PAHAT, JOHOR

8.0 REFERENCES

[1] Eurocode 0: Basic of structural design


[2] Eurocode 1: Actions on structures
[3] Eurocode 2: Design of concrete structures
[4] British Standard, Structural use of concrete BS8110:1985
[5] Uniform Building By-Laws 2012 and Malaysian Standards MS 1183:2015