Reinforcement Drawings Exemples PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 27

Schedule No.

E (Devprayag)

Sl.no Drawing Title Drawing No.


1 Base Map of Existing Surface Intake Source Transmission Lines in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-001
2 Proposed 25 mm Dia GI Distribution Pipelines from Tehseel Water Tank 60 KL in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-001A
3 Plan & L-Section of Gravity main from Randi Gad Water source to 40 KL CWR @ Dandana Village in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-002
4 Plan & L-Section of Gravity main from Diwani Gad Water source to 60 KL CWR @ Tehseel in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-003
5 Line Diagram of Water Supply Scheme in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-004
6 General Arrangement Drawing for Uttranchal Koop in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-005
7 General Arrangement Drawing for Sluice Valve Chamber (Typical) in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-006
8 Reinforcement Details for Sluice Valve Chamber (Typical) (For 200 mm Thick Cover Slab Panel) in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-007
9 General Arrangement Drawing for Scour Valve Chamber (Typical) in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-008

10 Reinforcement Details for Scour Valve Chamber (Typical) (For 200 mm Thick Cover Slab Panel) in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-009

11 General Arrangement Drawing for Air Valve Chamber (Typical) in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-010

12 Reinforcement Details for Air Valve Chamber (Typical) (For 200 mm Thick Cover Slab Panel) in Devprayag Town UK/UEAP-UJS/WSS/GW/01/DP-G-011

13 Proposed Office Building for UJS in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-012

14 Reinforcement Details of Proposed Office Building for UJS in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-013

15 Proposed Guest House Building for UJS in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-014

16 Layout of proposed Staff Quarters in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-015

17 General Arrangement Drawing for 50 KL Capacity CWR at Gadi Dak Bunglow in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-016

18 Reinforcement Details of 50 KL Capacity CWR at Gadi Dak Bunglow in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-017

19 Reinforcement Details of proposed Staff Quarters in Devprayag UK/UEAP-UJS/WSS/GW/01/DP-G-018


Notes

1. As reported by Jal Sansthan Devprayag, all Existing


water supply pipelines are GI pipelines.

Key to symbols

RT
KU
RAM
RESO ND
Reference drawings

LEGEND
ALAKNANDA RIVER

DRAIN / STREAM / NALA

ROAD

FILTER WATER TANK

EXISTING WATER PIPE LINE

01 22/05/2014 JSN For Tender Purpose only SKB SKS

Rev Date Drawn Description Ch’k’d App’d

Mott MacDonald (P) Ltd.


'' D '' Block, New ISBT Coplex
Haridwar Bypass
Majra, Dehradun
T 0135-2641523
F 0135-2331640
W www.ottac.co

Client

UTTARAKHAND JAL SANSTHAN

Project
UTTRAKHAND EMERGENCY
ASSISTANCE PROJECT (UEAP)

Title
BASE MAP OF EXISTING SURFACE
INTAKE SOURCE TRANSMISSION LINES
IN DEVPRAYAG
Contract Package.UK/UEAP-UJS/WSS/GW/01

Designed S.K.Bhaskar Eng check S.K.Bhaskar


Drawn Jaypal S Negi Coordination S.K.Bhaskar

Dwg check Jaypal S Negi Approved Sanjiva K Sharma


Scale at A1 Status Rev
NTS TEND 01
Drawing Number
UK/UEAP-UJS/WSS/GW/01/DP-G-001
1. As reported by Jal Sansthan Devprayag, all Existing
water supply pipelines are pipelines.

LEGEND
ALAKNANDA RIVER

DRAIN / STREAM / NALA


PROPOSED 25 MMdia
WATER PIPE LINE ROAD

FILTER / WATER TANK

PROPOSED 25 MMdia
WATER PIPE LINE

PROPOSED 25 MMdia
WATER PIPE LINE
PROPOSED 25 MMdia
WATER PIPE LINE

PROPOSED 25 MMdia
WATER PIPE LINE

Rev Date Drawn Description Ch’k’d App’d Title Drawn JSN


Client
01 22/05/2014 JSN For Tender Purpose only SKB SKS PROPOSED 25 MM DIA GI DISTRIBUTION Checked S.K.B
UTTARAKHAND JAL SANSTHAN
PIPELINES FROM TEHSEEL WATER TANK Approved S.K.S
Project
60 KL IN DEVPRAYAG
UTTARAKHAND EMERGENCY Scale at A3
Contract Package No.
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) NTS
UK/UEAP-UJS/WSS/GW/01
D Block F +91 (0)01 3521 31640
Drawing Number Rev Status
New ISBT Complex W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-001A 01 TEND
MS Inlet channel
Gad
iG

.
adh
era

0 m dia
50
20 mm

m.
Proposed Site for Construction

00 dia
40
18 mm
of 50 KL CWR

Uttranchal
Proposed Site for Construction of
Koop G ad Gadi Dak Bunglow Office Building & 300 KL CWR
ndi
Ra 40 KL C.W.R

sh
Filter Diwani Gad Water Supply Scheme

ike
Randi Gad Water Supply Scheme Tehsil

ish
100mmdia / 700m
115 K.L. al

oR
100mmdia / 125m Kh
Di

C.W.R

T
a
ol
wa
n

H i nd
iG

Tehsil Nagar
To To Sri
ad

15 K.L. 80mmdia
100mmdia / 4000m
To Hindola Khal 40mmdia C.W.R
300m mdia
80m
Dadna Tank e sh 20m
100mmdia / 200m hik mdia
35 K.L. 80m m
Ris 204
To mdia
40mmdia 80m m
250 Filter
270m 40mmdia mdia
80m m mdia Uttranchal
40mmdia / 980m 700m 495 8 0m
mdia 20m Koop
100mmdia / 7850m mdia

ar
80m m
32mmdia 80mmdia 80m 0m 205

ag
780m 2290m 226
20mmdia 25mmdia
50m mdia

ri N
Baha Bazar 805m 65m

S
40 K.L. 20mmdia mdia mdia 20m
100mmdia 100mmdia 80mmdia 80m m 65m m
82m 1000m 200m 90m mdia 896 600

To

ia
65mmdia

d
65m m
6 90
1500m mdia

mm
65m m

65
180
mdia
Tehsil Tank 65m 0m LEGENDS
60 K.L. Baha Bazar 152
Gadhera
40 K.L. Road
C.W.R Existing Pipeline
Proposed Pipeline
Dismantling Pipeline
Uttranchal Koop
CWR
Proposed Site
Filter Units

Rev Date Drawn Description Ch’k’d App’d Title Drawn JSN


Client
01 22/05/2014 JSN For Tender Purpose only SKB SKS Line Diagram of Water Supply Scheme Checked S.K.B
UTTARAKHAND JAL SANSTHAN
in Devprayag Approved S.K.S
Project
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) NTS
D Block F +91 (0)01 3521 31640
Drawing Number Rev Status
New ISBT Complex W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-004 01 TEND
NUTS AND BOLTS RUBBER FLANGE
6MM THICK

MS FLANGE
5MM THICK
Bottom MS Jali 200 200

A A 50 MM dia
50 MM dia
MS ERW PIPE

1250
1250
SCREEN
40 MM dia 40 MM dia

600 600
PLAN
MS ZALI 10 MM

ELEVATION SECTION AT A-A

Bottom MS Jali

MS Jali
10 MM SQ. BARS

RUBBER FLANGE MS FLANGE

Rev Date Drawn Description Ch’k’d App’d Title Drawn JSN


Client
01 22/05/2014 JSN For Tender Purpose only SKB SKS General Arrangement Drawing for Checked SKB
UTTARAKHAND JAL SANSTHAN
Project
Uttranchal Koop in Devprayag Approved S.K.S
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) NTS
D Block F +91 (0)01 3521 31640
Drawing Number Rev Status
New ISBT Complex W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-005 01 TEND
PRECAST REMOVABLE SLABS
GL R.C.C. M20
DIMENSIONS OF SLUICE VALVE CHAMBERS

100 100

SEE NOTE 3

R.C.C. M20
P.C.C. M15

700mm X 700mm X 200mm


(RCC M-20)
Section A
- -

SLUICE VALVE

PUDDLE FLANGE

Plan Cover Slab

1. All dimensions are in millimeter.


LENGTH TO 2. Size of valve chamber may vary as per site condition and as
MATCH AS PER directed by the Engineer.
SITE CONDITION 3. Tail piece to be provided considering the available space
in the chamber.
4. No dimensions shall be scaled from this drawing.
5. All chambers shall be covered with R.C.C. covers designed for
class-A loading as per I.R.C. standards.
6. Sluice valve as per IS:780 for valves up to 300mm
and IS:2906 for above 300mm

A
-
Plan
Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S General Arrangement Drawing for Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
Sluice Valve Chamber(Typical) Approved Sanjiva K Sharma
Project
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-006 01 TEND
b b b
Reinforcement for Trimming
G.L
Size of main

t
RCC Cover Bar 'a' Bar 'b' Bar 'c'
(mm) on B/F on B/F on B/F
Slab Panel
100 1 no. # 8 1 no. # 8 1 no. # 8
150 1 no. # 8 1 no. # 8 1 no. # 8

D 200 1 no. # 8 1 no. # 8 1 no. # 8


Vertical bars
250 Valve Chamber Wall & Base slab Detail
1 no. # 8 1 no. # 8 1 no. # 8
Ld 'a' on B/F
Wall Wall Wall Base Slab
Horizontal bars Size of
Thickness Hight Reinforcement Reinforcement
'c' on B/F Chamber
(mm) (mm) (mm)

Pipe dia+800
Vertical Horizontal II to B II to L
LxB T D
Top & Bottom Top & Bottom
II to B II to L Ld 'b' on B/F 900 x 900 150 Pipe dia+800 #8@200c/c #8@200c/c #8@200c/c #8@200c/c
0 1000 X 1000 150 Pipe dia+800 #8@200c/c #8@200c/c #8@200c/c #8@200c/c
20

100
400 400 1000 x 1000 150 Pipe dia+800 #8@200c/c #8@200c/c #8@200c/c #8@200c/c

b
1250 x 1250 150 Pipe dia+800 #8@200c/c #8@200c/c #8@200c/c #8@200c/c
P.C.C. 1:3:6

200 200
Base slab
75 100 T L T 100 75
TYPICAL TRIMMING DETAIL RCC cover Slab Panel Detail
Section A Size of Nos. of Slab Panel Slab Panel Slab Panel Reinforcement
- - Chamber
0 Slab Panel Size Thickness
20 (L x B ) mm l x b mm t mm. Botttom R/F. Top R/F. Stirrups
# 8 @ 100 C/C
900 X 900 3 nos. 1200 x 400 200 3 nos. # 10 3 nos. # 10
2 Legged Stirrups
# 8 @ 100 C/C
l 1000 X 1000 3 nos. 1300 x 435 200 4 nos. # 12 4 nos. # 10
2 Legged Stirrups
# 8 @ 100 C/C
1000 X 1000 3 nos. 1300 x 435 200 4 nos. # 12 4 nos. # 10
2 Legged Stirrups
3D View of
# 8 @ 100 C/C
Coverslab Panel 1250 x 1250 5 nos. 1550 x 515 200 3 nos. # 20 3 nos. # 12
2 Legged Stirrups

300
300
l X b x t mm Lifting Hooks
Slab Panel Stirrups
Bottom R/f.

T
Top R/f.
Notes :
1. All dimensions are in millimeter and levels are in meters .
horizontal bars
75dia Opening 2. # denotes High strength deformed bar of grade Fe 415
A A
confirming to IS 1786.

l
l

B
B
3. All RCC work shall be done in Concrete grade M-20.
4. Clear cover to main reinforcement for walls/slab = 25 mm.
vertical bars 75dia Opening 5. Min. Lap/Anchorage length shall be 50x dia. of bar.
B B 6. Each Slab Panel will be arranged parallel to shorter
b
dimension of the Chamber. Cover slab Panel designed for
Top R/f.
IRC Class A Load.
# 12 7. Bars to be Bend inside to get min. development length Ld.

T
(50xd)
t

b b b b Stirrups
T L T 8. 0.60 Mt.Shall be the cover from top of pipe.
L Bottom R/f. 9. This Drawing is to be Read in Conjunction With All Other
Relevant Drawing no.
PLAN OF SLUICE VALVE CHAMBER WALL COVER SLAB PANEL LAYOUT SINGLE SLAB PANEL TYP. PLAN SECTION B-B UK/UEAP-UJS/WSS/GW/01/DP-G-006 .

Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S Reinforcement Details for Sluice Valve Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
Chamber(Typical) Approved Sanjiva K Sharma
Project
(For 200 mm Thick Cover Slab Panel)
UTTARAKHAND EMERGENCY Scale at A3
Contract Package No.
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) UK/UEAP-UJS/WSS/GW/01 NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-007 01 TEND
SEMICIRCULAR BEND

PRECAST REMOVABLE SLABS


GL RCC M20
GL DIMENSIONS OF SCOUR VALVE ARRANGEMENT CHAMBERS
SIZE OF VALVE THICKNESS THICKNESS HEIGHT FROM
SIZE OF SIZE OF
MAIN CHAMBER OF RCC WALL L1xB1 OF R.C.C. BASE SLAB
SCOUR
(mm) (mm) (mm) (mm) SLAB TO BOTTOM OF
SEE NOTE 3 VALVE
D (mm) T(mm) TOP SLAB H(mm)
LxB W
RCC M20 100 100 900 x 900 150 1200 x 1200 200 Valve dia+800
DOUBLE FLANGED PIPE
PUDDLE FLANGE

DOUBLE FLANGED
DUCK FOOT BEND

R.C.C. M20
P.C.C. M15
700mm X 700mm X 200mm
(RCC M-20) DOUBLE FLANGED PIPE
SHORT PIECE

SECTION - AA

LENGTH TO MATCH LENGTH TO MATCH


AS PER SITE AS PER SITE
CONDITION CONDITION

A
-
PLAN OF COVER SLAB
SCOUR TEE

NOTE:-
1. All dimensions are in millimeter.
2. Size of valve chamber may vary as per site condition and as
ROADSIDE DRAIN directed by the Engineer.
3. Tail piece to be provided considering the available space
in the chamber.
4. No dimensions shall be scaled from this drawing.
5. All chambers shall be covered with R.C.C. covers designed for
class-A loading as per I.R.C. standards.
6. Sluice valve as per IS:780 for valves up to 300mm
PLAN
Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S General Arrangement Drawing for Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
Scour Valve Chamber (Typical) Approved Sanjiva K Sharma
Project
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-008 01 TEND
b b b

G.L Valve Chamber Wall & Base slab Detail


Reinforcement for Trimming

t
RCC Cover Wall Wall Wall Base Slab
Size of Size of
Slab Panel Bar 'a' Bar 'b' Bar 'c' Chamber Thickness Hight Reinforcement Reinforcement
main (mm)
on B/F on B/F on B/F (mm) (mm) (mm) II to B II to L
D Vertical Horizontal
Vertical bars D LxB T D Top & Bottom Top & Bottom
300 1 no. # 8 1 no. # 8 1 no. # 8
1250 x 1250 150 Valve dia+800 #8@200c/c #8@200c/c #8@200c/c #8@200c/c
Ld 'a' on B/F
Horizontal bars
'c' on B/F RCC cover Slab Panel Detail
Size of Nos. of Slab Panel Slab Panel Slab Panel Reinforcement
Chamber

Valve dia+800
Slab Panel Size Thickness
II to B II to L 0 (L x B ) mm l x b mm t mm. Botttom R/F. Top R/F. Stirrups
Ld 'b' on B/F
20 # 8 @ 100 C/C
1250 x 1250 5 nos. 1550 x 310 200 3 nos. # 20 3 nos. # 12
2 Legged Stirrups

100
400 400

P.C.C. 1:3:6

200 200
Base slab
75 100T L T 100 75
TYPICAL TRIMMING DETAIL
Section A 0
- -
20

l Notes :
1. All dimensions are in millimeter and levels are in meters .
2. # denotes High strength deformed bar of grade Fe 415
confirming to IS 1786.
3D View of
Coverslab Panel
3. All RCC work shall be done in Concrete grade M-20.
4. Clear cover to main reinforcement for walls/slab = 25 mm.
5. Min. Lap/Anchorage length shall be 50x dia. of bar.

300
300
l X b x t mm Lifting Hooks
Stirrups 6. Each Slab Panel will be arranged parallel to shorter
Slab Panel
dimension of the Chamber. Cover slab Panel designed for
Bottom R/f. IRC Class A Load.

T
7. Bars to be Bend inside to get min. development length Ld.
Top R/f. (50xd)
8. 0.60 Mt.Shall be the cover from top of pipe.
horizontal bars 9. This Drawing is to be Read in Conjunction With All Other
75dia Opening Relevant Drawing no.
A A
UK/UEAP-UJS/WSS/GW/01/DP-G-008.

l
l

B
B
vertical bars 75dia Opening
B B
b
Top R/f.
# 12

T
t

b b b b Stirrups
T L T
L
Bottom R/f.
PLAN OF SCOUR VALVE CHAMBER WALL COVER SLAB PANEL LAYOUT SINGLE SLAB PANEL TYP. PLAN SECTION B-B

Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S Reinforcement Details for Scour Valve Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
Chamber (Typical) Approved Sanjiva K Sharma
Project
(For 200 mm Thick Cover Slab Panel)
UTTARAKHAND EMERGENCY Scale at A3
Contract Package No.
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) UK/UEAP-UJS/WSS/GW/01 NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-009 01 TEND
DIMENSIONS OF AIR VALVE CHAMBERS
HEIGHT FROM
BASE SLAB
TO BOTTOM OF
TOP SLAB H(mm)

Pipe dia+1000
150
150
W

Section AA
- -

W
LENGTH TO
W

MATCH AS
LENGTH TOMATCH PER SITE
AS PERSITE CONDITION CONDITION

A
-

Plan of cover Slab

W
1. All dimensions are in millimeter.
2. Size of valve chamber may vary as per site condition and as
directed by the Engineer.
3. Tail piece to be provided considering the available space
in the chamber.
4. No dimensions shall be scaled from this drawing.
5. All chambers shall be covered with R.C.C. covers designed for
class-A loading as per I.R.C. standards.
6. Wherever required MS cage shall be provided over the
chamber to protect the air valve.
7. Sluice valve as per IS:780 for valves up to 300mm
Plan

Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S General Arrangement Drawing for Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
Air valve Chamber (Typical) Approved Sanjiva K Sharma
Project
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-010 01 TEND
b b b

G.L

t
RCC Cover Valve Chamber Wall & Base slab Detail
Reinforcement for Trimming
Slab Panel Size of Wall Wall Wall Base Slab
Size of Bar 'a' Bar 'b' Bar 'c' Chamber Thickness Hight Reinforcement Reinforcement
main (mm) on B/F on B/F on B/F (mm) (mm) (mm)
D T D Vertical Horizontal II to B II to L
LxB
Vertical bars 300 2 nos. # 8 2 nos. # 8 2 nos. # 8 Top & Bottom Top & Bottom
D 900 x 900 150 Pipe dia+1000 #8@200c/c #8@200c/c #8@200c/c #8@200c/c

Ld 'a' on B/F
Horizontal bars 'c' on B/F

Pipe dia+1000
RCC cover Slab Panel Detail
II to L Size of Nos. of Slab Panel Slab Panel Slab Panel Reinforcement
II to B 'b' on B/F

Ld
Chamber Slab Panel Size Thickness
(L x B ) mm l x b mm t mm. Botttom R/F. Top R/F. Stirrups

100
# 8 @ 100 C/C
900 x 900 3 nos. 1200 x 400 200 3 nos. # 16 3 nos. # 10
400 400 2 Legged Stirrups

P.C.C. 1:3:6

200 200 D Varies According to pipe Dia


Base slab
75 100 T L T 10075

Section A TYPICAL TRIMMING DETAIL


- -
0
20
b

0
20

300
300
l X b x t mm Lifting Hooks l
Stirrups
Slab Panel
Bottom R/f.

T
Notes :
Top R/f.
horizontal bars 3D View of
1. All dimensions are in millimeter and levels are in meters .
75dia Opening Coverslab Panel 2. # denotes High strength deformed bar of grade Fe 415
B B confirming to IS 1786.

l
l

B
A vertical bars A 3. All RCC work shall be done in Concrete grade M-20.
75dia Opening b 4. Clear cover to main reinforcement for walls/slab = 25 mm.

B
Top R/f. 5. Min. Lap/Anchorage length shall be 50x dia. of bar.
# 12 6. Each Slab Panel will be arranged parallel to shorter
dimension of the Chamber. Cover slab Panel designed for
t

Stirrups

T
IRC Class A Load.
b b b b 7. Bars to be Bend inside to get min. development length Ld.
T L T Bottom R/f.
L (50xd)
8. 0.60Mt.Shall be the cover from top of pipe.
PLAN OF AIR VALVE CHAMBER WALL COVER SLAB PANEL LAYOUT SINGLE SLAB PANEL TYP. PLAN SECTION B-B 9. This Drawing is to be Read in Conjunction With All Other
Relevant Drawing no.
UK/UEAP-UJS/WSS/GW/01/DP-G-010 .

Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S Reinforcement Details For Air valve Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
Chamber (Typical) Approved Sanjiva K Sharma
Project
(For 200 mm Thick Cover Slab Panel)
UTTARAKHAND EMERGENCY Scale at A3
Contract Package No.
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) UK/UEAP-UJS/WSS/GW/01 NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-011 01 TEND
24500

TOILET
1500 x 1000 TOILET TOILET
1500 x 1500 FILE ROOM
1500 x 1500
3000 x 1900

E.E ROOM
MEETING ROOM/
ANTE ROOM 2500 x 3000
COMMON ROOM
2000 x 2000
4000 x 4000
ADMINISTRATIVE ROOM ACCOUNTS ROOM
5000 x 4000 4000 x 4000
FILE ROOM
3000 x 1900
UP

8500
A.E (HQ) ROOM
3000 x 2800
STORE
CONTROL DISPATCH TENDER REVENUE PAYMENT
COUNTER
J.E COUNTER J.E COUNTER COUNTER COUNTER COUNTER COUNTER COUNTER
2500 2000 x 2000
1500 2000 x 2000 2000 x 2000 2000 x 2000 2000 x 2000 2000 x 2000 2000 x 2000 2000 x 2000

2000 WIDE CORRIDOR 2000 WIDE CORRIDOR

2000
PORCH

Notes:
1. All Dimensions are in mm Unless Noted Otherwise.
2. All Plain and Reinforced Concrete shall confirm to IS 456-2000. UP
3. All Structural Work Shall be Carried Out as Per Relevant Indian Standard.
4. All Concrete Shall be Cured as Per IS 456-2000.
5. Laps in Column Shall be Staggered By 1.5xLd.
6. Cover to all reinforcement is 20 mm for slab 30 mm for beam,40mm for column & Footing.
7. All Concrete work shall be done in M20 Grade for slab is M25 Beam & Column. PLAN OF PROPOSED OFFICE BUILDING FOR UTTARAKHAND JAL SANSTHAN IN DEVPRAYAG
8. T indicate for steel (HYSD Fe 415) confirming to IS:1786 (latest issue).
9. Lap length of bars to be 50xd (d=dia of bar) . AREA = 208.25 SQMT.
10. Safe bearing capacity is considered as 80 KN/m at 2.0m below ground level as /given
information. 0 7.5m 15m
11. All Structural Steel Works Should Be of Fy-250. 1:150

Rev Date Drawn Description Ch’k’d App’d Title Drawn JSN


Client
01 22/05/2014 JSN For Tender Purpose only SKB S.K.S Proposed office Building For Checked SKB
UTTARAKHAND JAL SANSTHAN Uttarakhand Jal Sansthan in Devprayag
Project Approved SKS
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) 1 : 150
D Block F +91 (0)01 3521 31640
Drawing Number Rev Status
New ISBT Complex W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-012 01 TEND
Notes
1. All dimensions are in millimeters and all levels are in meters with respect to Mean
A B C D E Sea level unless otherwise stated.
16000 2. Check all center line dimension with respect to general arrangement drawing &
3500 4500 4500 3500 structural drawing before excavation & center line.
EL +4.100

Top of Roof.Slab EL +3.500

EL +2.100

+0.000 +0.00

Front Elevation Key to symbols


1:50

1 2
A B C D E
16000
3500 4500 4500 3500
6000
EL +4.100 EL +4.100

115 Thk. RCC Slab


Top of Roof.Slab EL +3.500 Parapet Wall Top of Roof.Slab EL +3.500 115 Thk. RCC Slab Parapet Wall

Roof Beam (Typ.) Roof Beam (Typ.)


EL +2.100 EL +2.100
D1 V W2 W2 W2 W2 V

600
Typ. Drawing Room
Reference drawings
D1
D2 D2

150Thk. Grade Slab 150Thk. Grade Slab

900
+0.000 +0.000

Plinth Beam (Typ.) Plinth Beam (Typ.)

Min. 2000mm
Min. 2000mm

Up to Good Soil or
Up to Good Soil or
100mm Thk.
P.C.C. M15

Section B
Section A
1:50 -
1:50 -

0 2.5m 5m
1:50
B
A B C D E P1 22/05/2014 SV For Tender Purpose only SKB SKS
16000
Rev Date Drawn Description Ch’k’d App’d
3500 4500 4500 3500

C2 V C1 W2 W2 C1 W2 W2 C1 V C2
Mott MacDonald
1 D Block
Schedule For Door & Windows Pantry Pantry New ISBT Complex
Toilet Toilet Majra,Dehradun
Quantity
4210 x 600 4210 x 600
Name Size 1400 x 1500 1400 x 1500 India
(Nos.)
T +91 (0)01 3526 41523
D1 Door 1000 x 2100 04 F +91 (0)01 3521 31640
A A
D2 D2 W www.mottmac.com
D2 Door 900 x 2100 02
W1 Window 1200 x 1200 04
W2 Window 900 x 1200 04 Client
V Ventilation 600 x 450 02 UTTARAKHAND JAL SANSTHAN
Project
UTTARAKHAND EMERGENCY
Drawing Room Drawing Room

6000
Bed Room Bed Room ASSISTANCE PROJECT (UEAP)
3505 x 4175 4210 x 5190 4210 x 5190 3505 x 4175

Title
General Arrangement Details of
Proposed Guest House Building for
Uttarakhand Jal Sansthan in Devprayag
D1 D1
Contract Package No.
UK/UEAP-UJS/WSS/GW/01
D1 D1
2 Designed T Purohit Eng check T Purohit
C2 W1 C1 W1 C1 W1 C1 W1 C2 Drawn S Vyas Coordination S.K.Bhaskar
B
Dwg check T Purohit Approved Sanjiva K Sharma
Scale at A1 Status Rev

© Mott MacDonald
As Shown TEND 01
Ground Floor Plan Drawing Number
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties.
1:50
UK/UEAP-UJS/WSS/GW/01/DP-G-014
100mm dia CI SEMI Notes :-
PUDDLE COLLAR CIRCULAR BEND
1. All Dimensions are in MM Unless Otherwise Specified.
2. No Dimension Shall be Scaled from the Drawing.
3. All Vertical down take Pipes are of DI Confirming to IS:8329-2000 and its
Related DI Specials Confirming to IS:9523
MOSQUITO PROOF
COPPER MESH
4. The Piping Details shown in the Drawing is Tentative and it may vary as/ the site Condition
and Alignment of Transmission and Distribution mains.
5. All Drawing Interrelated and shall be Read in Conjunction with one Another.
100mmdia CI 100
FLANGED SPIGOT 6. Valves Fixed on Pipelines Below GL Shall be Provided with Valve Chamber as/ Standard Drawing.
7. Dismantling Joints are Required to be Provided for Valves of Size above 300mm and all Vertical
INLET PIPE
Pipes Shall be Supported by Duck Foot Bends.
CI VENTILATOR WITH COWL
DETAIL - B

DETAIL-A

IPE
LET P

TO
MS IN

DI S
ia

TRIB
150 d
A

UT
EXTRA
CONCRETE REFER DETAIL - B C
L OF WATER TANK

ION
COVER CI VENTILATOR WITH COWL
100mm dia CI VENTILATOR WITH COWL MS FRAME & COVER
REFER DETAIL - B
REFER DETAIL - A
MS LADDER

200

150
1000
MAN HOLE WITH
600 x 600MS DOOR MWL

MM
dia M
DI FLANGED PIPES
MS LADDER
OVER FLOW PIPE 150dia

SP
5000

IPE
PLINTH PROTECTION ALUMINIUM
PCC M15 LADDER
3000

OUTLET PIPEdia200
GL 1000 dia 150 GL
INLET TO P S FOR DISTRIBUTION
100

INLET PIPE dia150


100mm dia CI VENTILATOR
SCOUR PIPE dia150
WITH COWL
REFER DETAIL - B OVER FLOW PIPE dia150
PCC : 1:2:4
600 mm Thick Raft

150 dia MS SCOUR PIPE


150 dia MS
SECTION AT A-A
P.F
OVERFLOW PIPE

SECTIONAL PLAN
Rev Date Drawn Description Ch’k’d App’d Title Drawn Jaypal S Negi
Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S General Arrangement Drawing for Checked S.K.Bhaskar
UTTARAKHAND JAL SANSTHAN
50 KL Capacity CWR at Gadi Dak Approved Sanjiva K Sharma
Project
Bunglow in Devprayag
UTTARAKHAND EMERGENCY Contract Package No. Scale at A3
Mott MacDonald T +91(0)01 3526 41523 ASSISTANCE PROJECT (UEAP) UK/UEAP-UJS/WSS/GW/01 NTS
D Block F +91 (0)01 352643832
New ISBT Complex Drawing Number Rev Status
W www.mottmac.com
Majra,Dehradun UK/UEAP-UJS/WSS/GW/01/DP-G-016 01 TEND
Notes
1. All dimensions are in millimeters and all levels are in meters with respect to Mean
150 600 150 150 Sea level unless otherwise stated.
2. Check all dimension with respect to general arrangement drawing & structural
a drawing before excavation & center line.
di

.)
2-10T 3. Clear covers to all reinforcement for different elements are as per following:

yp
80 Foundation - 50mm
VC VC

(T
3-12T
VB1 on both faces 2L-8T @ 100 c/c Wall & Slab - 40mm

150
4. T indicate TOR Steel (HYSD Fe 415) Confirming to IS-1786 (Latest Revision).
5. Grade of concrete M20.
D D 6. Stripping time for centering & shuttering shall be as per IS - 456 : 2000 Cl. 11.3.

250
600 7. Lap length of bars to be 40xd (d=dia of bar) wherever necessary.

600
VB1
VB1
Bar Diameter Lap / Anchorage Lengths (mm)
2-10T (mm) Vertical Horizontal
3-12T 8 350 350
VB1 RC DETAILS OF VB1 10 400 400

150
Scale 1:10 12 500 500

Ld
VC VC 16 650 650

(Typ.)
20 800 800
25 1000 1000
2-10T
8. All Concrete Shall be cured as per IS:456-2000 & & IS:3370-2009.
Section C 2L-8T @ 100 c/c
Details at Openings in Top Dome 9. Not more than 50% bars shall be lapped at any section.
1:20 - Scale 1:20 10. All P.C.C work shall be in M15.
11. Soil bearing capacity is considered as 100 KN/m² at 1.5m depth from ground

150
level.
1300
12. This drawings is to be read in conjunction with all other relevant

0
10T @ 300 C/C 2-10T drawings.No.UEAP-UK/UEAP-UJS/WSS/GW/01/DP-G-016

10

150
Radial bars at bottom 150
1500mm long from 8T @ 150 C/C 2
face to outer edge Top & Bottom in MESH Form

325
1
RC DETAILS OF VB2 Key to symbols
VB2 Scale 1:10
150
200 600 200
150

600
C VC VC C

2L-8T @ 100 c/c

150

250
4-12T
VB1

100
RC DETAILS OF VC
Section B Section D
A A Scale 1:10
1:20 - 1:20 -

1300
80 Th
k.

Reference drawings
VB2

100
300 Thk. 8T @ 250 C/C
1200mm from
Face of TRB
B B
8T @ 200 C/C Radial Bars measured at

VB2
VB2

1300
inner face of TRB curtail alternate bars
+3.20 for 5.0m Dia where spacing reduces to 125mm C/C,
200 +4.20 for 6.0m Dia continue bars upto 300mm Radius.
VB2
250 5000 250
10

250
0T

250 250
hk
.

Bottom Foundation Details 4-T10


Scale 1 :50 Plan at Top Level Rc details of ventilator roof slab Top Ring Beam
250x250
Scale 1:20 Scale 1:20

0 0.5m 1m
1:10

0 1m 2m
1:20
8T @ 150 C/C
0 2.5m 5m
1:50
150
8T @ 200 C/C Radial Bars measured at
inner face of TRB curtail alternate bars
8T @ 200 C/C where spacing reduces to 125mm C/C, 01 22/05/2014 SV For Tender Purpose only SKB SKS
8T @ 200 C/C upto 1200 8T @ 200 C/C upto 1200 8T @ 150 C/C
1200 from form face of TRB continue bars upto 300mm Radius. form face of TRB 150 Rev Date Drawn Description Ch’k’d App’d
face of TRB
1200
Mott MacDonald (DSC-1)
8T @ 150 C/C 'D' Block, New ISBT Complex
Haridwar Bypass
1200 Majra, Dehradun
India
T 0135-2641523
F 0135-2643832
250Thk. RCC Wall W www.mottmac.com

Client
UTTARAKHAND JAL SANSTHAN
GL
A A A A
Project

1200
8T @ 150 C/C UTTARAKHAND EMERGENCY
300
Bothways
8T @ 150 C/C ASSISTANCE PROJECT (UEAP)
1200 Corner Bars
300
+0.350
8T @ 300 C/C 1500mm Long
Title
Radial Bars at Bottom
Reinforcement Details of 50 KL Capacity Clear
100

8T @ 150 C/C in
MESH Form at Water Reservoir of 5.0 m Dia. at Gadi Dak Bunlow
+0.00
Top & Bottom
in Devprayag
1500
300

Contract Package No.


UK/UEAP-UJS/WSS/GW/01
PCC (M15) Designed N Chauhan Eng check N Chauhan
250 5000 250 250 5000 250 100 250 250 5000dia
100

Drawn S Vyas Coordination S.K.Bhaskar

Dome Plan Top Dome Plan Bottom Section Dwg check N Chauhan Approved S.K Sharma
A
Scale 1 :50 Scale 1 :50 Scale at A1 Status Rev
1:20 -
© Mott MacDonald
As Shown TEND 01
Drawing Number
This document is issued for the party which commissioned it and for specific purposes connected with the captioned project only. It should not be relied upon by any other party or used for any other purpose.
We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. UK/UEAP-UJS/WSS/GW/01/DP-G-017
P:\Drawings\UEASP\Tender\Devprayag\UEAP-329385-RAWS01DP-G-017.dwg May 24, 2014 - 5:36PM NEG56927
10000

3775 2450 3775 C1 C1 C1 C1

2-T25 (THR)
1000 1000 1000 1000

C1 / F1 C1 / F2 C1 / F2 C1 / F1
2-T20 2-T16 2-T16 2-T20
2-T16 2-T16

1500 1500
2-T20 (THR) 2-T20 (THR)

S1 S1

4005
2950
All Beams 300 x 450 mm
Stirrups Dia T8 T8 T8 T8 T8 T8 T8 T8 T8
S1
Spacing 100 150 100 150 150 100 150 150 100

Nos 9 Rest 9 9 Rest 9 9 Rest 9


C1 / F2 C1 / F3 C1 / F3 C1 / F2
All Plinth Beams & Beams
(300 x 450)
Slab Reinforcement :
1 - T8 @ 150 C/C Both Ways
2 - T8 @ 150 C/C Negative Steel

10000
10000
ick

S1
Th

S1

2885
00

S1
15

Foundation Details
Steel Reinforcement T8 @ 100 C/C
Footing
Bf x Lf PCC Size T t
Mark Bf Lf
C1 / F2 C1 / F3 C1 / F3 C1 / F2 F1 2300 x 2450 2500 x 2650 T10 @ 150 c/c T10 @ 150 c/c 450 150
F2 2430 x 2580 2630 x 2780 T10 @ 150 c/c T10 @ 150 c/c 450 150 Reinforcement Detail
F3 2830 x 2980 3030 x 3180 T10 @ 150 c/c T10 @ 150 c/c 450 150
of Stair Case

Column Schedule
S1

3110
S1 S1 2ND to Roof 4-T16+ 4-T12
Notes:
1st to Second 4-T16+ 4-T16 1. This Drawing is to be Read in Conjunction With All Other Relevant Drawing No.
From Foundation 8-T20 UK/UEAP-UJS/WSS/GW/02-G-015 .
2. All Dimensions are in mm Unless Noted Otherwise.
C1 / F1 to First Floor 3. All Plain and Reinforced Concrete shall confirm to IS 456-2000.
C1 / F2 C1 / F2 C1 / F1 4. All Structural Work Shall be Carried Out as Per Relevant Indian Standard.
5. All Concrete Shall be Cured as Per IS 456-2000.
6. Striping Time for Centering and Shuttering Shall be as Per IS 456-2000.
7. Laps in Column Shall be Staggered By 1.5xLd.
3850 2375 3775
8. Cover to all reinforcement is 20 mm for slab 30 mm for beam,40mm for column & Footing.
9. All Concrete work shall be done in M20 Grade for slab is M25 Beam & Column.
S1 :Slab 125 mm Thick 10000 10. T indicate for steel (HYSD Fe 415) confirming to IS:1786 (latest issue).
11. Lap length of bars to be 50xd (d=dia of bar) .
12. Safe bearing capacity is considered as 80 KN/m at 2.0m below ground level as /given information.
Structural Layout at Typical Floor Level 13. All Structural Steel Works Should Be of Fy-250.

Rev Date Drawn Description Ch’k’d App’d Title Drawn J.S.N


Client
01 22/05/2014 JSN For Tender Purpose only S.K.B S.K.S Reinforcement Detail of Proposed Checked S.K.B
UTTARAKHAND JAL SANSTHAN
Staff Quarters in Devprayag Approved S.K.S
Project
Contract Package No.
UTTARAKHAND EMERGENCY Scale at A3
UK/UEAP-UJS/WSS/GW/01
T +91-135-264123 ASSISTANCE PROJECT (UEAP) NTS
F +91-135-2134640
Drawing Number Status Rev
W www.mottmac.com
UK/UEAP-UJS/WSS/GW/01/DP-G-018 TEND 01
P:\Drawings\UEASP\Tender\Devprayag\UEAP-329385-RAWS01DP-G-018.dwg May 24, 2014 - 5:25PM NEG56927