DESCRIPTIONS OF CHECK LIST

Note : A - Installation ( Construction )

Sr. System
File No. Descriptions
No. No.
1 B-0001A 01 n-Butyl Lithium Concentration Tank
2 B-0002A 02 Hexane System
3 B-0003A 03 Mixing System
4 B-0004A 04 Blowdown Tank System
5 B-0005A 05 Condensate Tank System
6 B-0015A 06 Rinsing Tank System
7 F-0003A-A 07 Filter Area
8 F-0003B-A 08 Filter Area
9 F-0006A-A 09 Rinsing Filter Area
10 F-0006B-A 10 Rinsing Filter Area
11 W-0002A 11 Heat Exchanger
12 E-0017A 12 Fire Fighting System
13 S-0019A 13 Safety Shower and Eye bath
14 RV-0020A 14 Pressure Relief Valve
15 PI-0021A 15 System Piping Installation
16 PP-0022A 16 Piping Painting
17 PIN-0023A 17 Insulation of Piping
18 PC-0024A 18 Piping Cleanliness
19 PFT-0025A 19 Piping Flushing & Testing
20 TEC-0026A 20 Test Equipment & Calibration
21 P-0002A 21 Pump Installation
22 P-0003A 22 Pump Installation
23 P-0008A 23 Pump Installation
24 P-0009A 24 Pump Installation
25 P-0010A-A 25 Pump Installation
26 P-0010B-A 26 Pump Installation
27 C-0000A 27 Cylinder