DESCRIPTIONS OF CHECK LIST

Note : A - Installation ( Construction )


B - Pre-commissioning / Commissioning

Sr. System
File No. Descriptions
No. No.
1 B-0001A 01 n-Butyl Lithium Concentration Tank
2 B-0001B 01 n-Butyl Lithium Concentration Tank
3 B-0002A 02 Hexane System
4 B-0002B 02 Hexane System
5 B-0003A 03 Mixing System
6 B-0003B 03 Mixing System
7 B-0004A 04 Blowdown Tank System
8 B-0004B 04 Blowdown Tank System
9 B-0005A 05 Condensate Tank System
10 B-0005B 05 Condensate Tank System
11 B-0015A 06 Rinsing Tank System
12 B-0015B 06 Rinsing Tank System
13 F-0003A-A 07 Filter Area
14 F-0003A-B 07 Filter Area
15 F-0003B-A 08 Filter Area
16 F-0003B-B 08 Filter Area
17 F-0006A-A 09 Rinsing Filter Area
18 F-0006A-B 09 Rinsing Filter Area
19 F-0006B-A 10 Rinsing Filter Area
20 F-0006B-B 10 Rinsing Filter Area
21 W-0002A 11 Heat Exchanger
22 W-0002B 11 Heat Exchanger
23 E-0017A 12 Fire Fighting System
24 E-0017B 12 Fire Fighting System
25 S-0019A 13 Safety Shower and Eye bath
26 S-0019B 13 Safety Shower and Eye bath
27 RV-0020A 14 Pressure Relief Valve
28 RV-0020B 14 Pressure Relief Valve
29 PI-0021A 15 System Piping Installation
30 PI-0021B 15 System Piping Installation
31 PP-0022A 16 Piping Painting
32 PIN-0023A 17 Insulation of Piping
33 PC-0024A 18 Piping Cleanliness
34 PFT-0025A 19 Piping Flushing & Testing
35 TEC-0026A 20 Test Equipment & Calibration
36 P-0002A 21 Pump Installation
37 P-0003A 22 Pump Installation
38 P-0008A 23 Pump Installation
39 P-0009A 24 Pump Installation
40 P-0010A-A 25 Pump Installation
Sr. System
File No. Descriptions
No. No.
41 P-0010B-A 26 Pump Installation
42 C-0000A 27 Cylinder