Nr The main of risks Owner of risk Reason/Cause Likelihood Impact Level of risk Mitigation strategy

Computer modelling
Lack of an acceptance Project purpose is
1 Investor 0-20% Low
of design proposals not defined
Conflict among Investor/
2 20-40% Medium
designing supervisor
Verification test to ensure
dimensions of all
Inadequate knowledge
3 Investor 0-20% Low components are within
about subject of design
tolerance levels for each
patient
Schedule
Acceptance of
4 Investor 40-70% High Keep the
unrealistic deadlines
Workshop
5 Waste of Materials Investor 20-40% Medium
The injuries in the Risk assessment study in
6 Inverstor 0-20% Low
workshop Poirier,
Budget
Inadequate budget for
7 Investor 20-40% Medium
material preparation

Identify harzards:

Mechanical

Biological

By function:

By component:
Nr The main of risks Owner of risk Likelihood Impact Mitigation strategy
Computer modelling
Verification test to ensure
Lack of an acceptance of design dimensions of all components are
1 Investor 0-20% Low
proposals within tolerance levels for each
patient
2 Conflict among designing Investor/ supervisor 20-40% Medium
Inadequate knowledge about Literature review needed, define the
3 Investor 0-20% Low
subject of design scope in detail
Schedule
Acceptance of unrealistic Build up the implementation plan
4 Investor 40-70% High
deadlines and set milestones in each stage
Workshop
Risk assessment study, workshop
6 The injuries in the workshop Investor 0-20% Medium
training in prior.