A.

Basics General A1 Features of PAITON Project PAGE1

PAITON EXPANSION PROJECT

COURSE – A ( BASICS GENERAL )

A1 Features of PAITON Project

TRAINER: Hiroyuki Hattori

MITSUBISHI HEAVY INDUSTRIES, LTD.


MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE2

PROGRAM
A2. Features of PAITON project are...
1. PAITON Project Outline
2. Environmental Features
3. Design Criteria
4. Operating Condition

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE3

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE4

1.1 Project Summary


Ø Project Name
PAITON Ⅲ Expansion Coal Fired Power Plant Project
Ø Plant type
Coal Fired Supercritical Power Plant
Ø Capacity
1×815MWNET (at 100% Rated Load)
Ø Steam Condition at MSV Inlet
24.4 MPa (g) & 538 deg C at MSV Inlet
566 deg C at RSV Inlet
Ø Fuel
Coal (Main fuel)
No.2 Fuel Oil (Start-up)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE5

1.1 Project Summary


BOILER:
MANUFACTURER Mitsubishi Heavy Industries, Ltd.
QUANTITY 1 unit
TYPE Supercritical, sliding pressure
operation, once through boiler,
single reheat cycle
MAIN STEAM FLOW
2,695 t/h (B-MCR)
RATE
STEAM CONDITION
25.8MPa(g) x 542 deg C
(at SH Outlet)
STEAM CONDITION
568 deg C
(at RH Outlet)
Burner Arrangement Circular Corner Firing system

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE6

1.1 Project Summary


STEAM TURBINE:
MANUFACTURER Mitsubishi Heavy Industries,
Ltd.
QUANTITY 1 unit
TYPE Tandem compound quadruple
exhaust condensing reheat
(TC4F-35.4)
RATED OUTPUT 865.9 MW
Steam Condition
24.4 MPa(g) x 538 deg C
at MSV Inlet
Steam Condition
566 deg C
at RSV Inlet
RATED SPEED 3000 min-1
No. OF EXTRACTIONS Eight (8)
GOVERNOR SYSTEM Electronic-Hydraulic System

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE7

1.1 Project Summary


GENERATOR:
MANUFACTURER Mitsubishi Electric Corporation
QUANTITY 1 Unit
TYPE Horizontally mounted cylindrical
rotor, rotating field type
RATED CAPACITY 1,045 MVA
COIL COOLING Rotor: Hydrogen
MEDIUM Stator: Water
RATED VOLTAGE 27 kV
POWER FACTOR 0.85 Lagging / 0.90 Leading
SPEED 3000 min-1
FREQUENCY 50 Hz

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE8

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE9

1.2 Project Location


Ø Project Location : J1. Raya Surabaya-Situbondo Km.
141 Paiton-Probolinggo, INDONESIA

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE10

1.2 Project Location

Nagasaki in Japan

Direct Distance
Approx: 5,000km

PAITON

MHI BUSINESS
Ref. Google earth CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE11

1.2 Project Location

Coal Storage Yard

Unit-7 Unit-5 Unit-1


Unit-3
Unit-8 Unit-6 Unit-2
Unit-9

Ash Disposal GIS


Area Area

MHI BUSINESS
Ref. Google earth CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE12

1.2 Project Location

Unit-8 Unit-7 Unit-6 Unit-5 Unit-2 Unit-1


Unit-3

MHI BUSINESS
Ref. Google earth CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE13

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE14

1.3 Overall Project Schedule


Ø LNTP Effective Date. : 2008/08/04

Duration: 45 months

Ø Operational Acceptance Date. : 2012/04/22

Ø Final Acceptance Date. : 2012/10/22

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE15

1.3 Overall Project Schedule


2009/01/03
YEAR 2009 2010 2011
MONTH 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE16

1.3 Overall Project Schedule

YEAR 2009 2010 2011


MONTH 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

2010/01/14
Boiler First
Column Election

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE17

1.3 Overall Project Schedule

YEAR 2009 2010 2011


MONTH 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

2010/06/30
Water Separator
Lifting

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE18

1.3 Overall Project Schedule

YEAR 2009 2010 2011


MONTH 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

2010/12/02
Generator
On Base

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE19

1.3 Overall Project Schedule

YEAR 2009 2010 2011


MONTH 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12

2011/03/31
Power Receiving

2011/09/22
Initial Firing

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE20

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE21

1.4 Project Organization

Ø Major Parties Involved in the Contract:


- “Owner”
P. T. PAITON ENERGY (PE)
- “Contractor”
Mitsui & Co., Ltd. (MBK) And Toa Corporation
- “Equipment Supplier”
Mitsubishi Heavy Industries Ltd. (MHI)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE22

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic Flow Diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE23

Stack

500kvGIS SH RH

BOILER FGD
GTR
(Sea Water
Scrubber)
IPB AH IDF
E P #7,8 Fly
Generator L P IP HP Ash Silo

TURBINE Deaerator
Demi LP
RO FDF #7,8 Coal
Heater
Handling
FGD Condenser
HP
Pump/Mix/Aer Conveyor,
Heater
ation/Disch Crusher
BASIN CP
BFP Coal silo
CPS
Screen Coal Feeder

PAF

Absorber Discharge
CWP Desali P No.2 Fuel oil Tank &
Pump Canal Pulverizer Pump
#7,8

5. Basic Flow Diagram MHI BUSINESS


CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE24

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE25

1.6 Plant Layout

Unit 3 Area

Plot Plan
Overall
(UnitPlot
3 Area)
Plan

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE26

1.6 Plant Layout


Boiler and Turbine

Boiler

Turbine Building

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE27

General Arrangement 1st Floor


Motor Driven
Boiler Feed Water Pump

Condensate Pump

Condenser Turbine Driven


Boiler Feed Water Pump

Condensate Polisher Area

1.6 Plant Layout MHI BUSINESS


CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE28
General Arrangement 1st Floor
Primary Air Fan 3A

Coal Pulverizer

Primary Air Fan 3B

1.6 Plant Layout MHI BUSINESS


CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE29

General Arrangement 1st Floor


Bottom Ash Storage Area

Air Heater 3A
Submerged Scraper Conveyor

Air Heater 3B

1.6 Plant Layout MHI BUSINESS


CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE30

1.6 Plant Layout


Intake System

Discharge Canal

Intake Canal

Circulating Water Pump

Intake Electrical Building & Chlorination Area

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE31

1.6 Plant Layout


Flue Gas System

Induced Draft Fan

Fly Ash Transport Building

FGD Absorber

Electrostatic Precipitator

Stack
FGD/EP/Ash Cont.&Elec.Building

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE32

1.6 Plant Layout


Flue Gas Desulfurization (FGD) System
FGD Discharge Basin
FGD Absorber Pump Basin

FGD Mixing Basin

FGD Aeration Basin

FGD Absorber Pump FGD Absorber


FGD Aeration Blower

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE33

1.6 Plant Layout


Water Treatment System

Potable Water Tank

Condensate Make-Up Tank


Product Water Tank
Permeate Water Tank
Desalination Sea Water Pump
Condensate Storage Tank

Desali & Demi Building

Desalination & Demineralizer Plant Area

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE34

1.6 Plant Layout


Fire Fighting System

Fire Pump Station

Service Water Tank


Sea Water Diesel Driven Fire Pump

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE35

1.6 Plant Layout


Coal and Fuel Oil
Coal Handling Conveyor

Coal Crusher House

Coal Handling Building

No.2 Fuel Oil Feed Pump Area


No.2 Fuel Oil Storage Tank

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE36

1.6 Plant Layout


Electrical System

Generator Transformer

Unit Auxiliary Transformer

Unit Auxiliary Transformer (SPARE)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE37

1.6 Plant Layout


Other Systems

Service Building

Air Compressor Building UNIT 3 Retention Basin

CO2 Storage Tank


H2,O2,N2 Gas Supply House

Emergency Diesel Generator Area

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE38

1.6 Plant Layout

Please see the 3D View.

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE39

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE40

1.7 Plant Performance Summary


PLANT PERFORMANCE:
Net Electrical Output 815MW
Net Plant Heat Rate at 100% Load 9,574 kJ/kWh

Conditions;
Circulating Water Temperature 29.2℃
Ambient Air Temperature 25.5℃
Ambient Relative Humidity 79%
Ambient Barometric Pressure 1.0333kg/cm2
Generator Power Factor 0.90

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE41

Contents
1. PAITON Project Outline are...
1.1 Project Summary
1.2 Project Location
1.3 Overall Project Schedule
1.4 Project Organization
1.5 Basic flow diagram
1.6 Plant Layout
1.7 Plant Performance Summary
1.8 Design Concept

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE42

1.8 Design Concept


1. Compliance with Environmental Requirement
2. Enhanced Reliability
3. Enhanced Thermal Efficiency
Ø Supercritical Unit.
4. Easy Operation
Ø Mitsubishi DCS specially customized for Boiler and
Turbine, and PLC control customized for FGD, EP,
and Water treatment etc...
5. Common Utility
Ø Using the Unit-7,8 equipment commonly, such as
waste water treatment system, fly ash silo, coal
receiving system, storage yard and fuel oil storage
tank.
MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE43

PROGRAM
A2. Features of PAITON project are...
1. PAITON Project Outline
2. Environmental Features
3. Design Criteria
4. Operating Condition

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE44

Contents
2. Environmental Features are...
2.1 Overall Plan
2.2 Flue Gas Emissions
2.3 Seawater Discharge

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE45

2.1 Overall Plan

Input Power Plant Output

Coal Electric Power (To PLN)

Air PAITON Flue gas (To Atmosphere)

Sea Water
POWER Waste water (To Unit7&8)

PLANT Ash (To Unit7&8)

Chemical Sea Water (To Sea)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE46

Contents
2. Environmental Features are...
2.1 Overall Plan
2.2 Flue Gas Emissions
2.3 Seawater Discharge

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE47

2.2 Flue Gas Emissions


Ø Flue Gas Emissions from Stack is in accordance with
the Contract Documents requirement.
PAITON PROJECT
Parameter
Guarantee Value (at BMCR)
Particulate Emission 50mg/Nm3
(average value) at 6% O2 dry
SO2 Emission 92.0%
(average value) Minimum SO2 removal efficiency
NOx Emission
(average value, 50% Rated Load 0.097mg/kJ
or above)
CO Emissions 100ppm
(average value) at 6% O2 dry

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE48

2.2 Flue Gas Emissions


Following methods are adopted to meet the strict
emission norm:

Ø Low NOx Combustion Technology


(3 Technologies are explained by next page)
Ø Electrostatic Precipitator (EP) for arresting
particulate.
Ø Seawater Scrubber Process for Flue Gas
Desulfurization (FGD).
Ø 220m High Stack for dispersing the emission
over wide range.

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE49

2.2 Flue Gas Emissions


Low NOx Combustion Technology
Ø (Circular Corner Firing System)
- CCF System
Ø (Mitsubishi Advanced-Pollution Minimum Burner)
- Mitsubishi A-PM Burner
Ø (Mitsubishi Advanced Combustion Technology)
- MACT

High Combustion Efficiency, Low Excess Air

Low NOX Emission


MHI BUSINESS
Ref: Details will be explained at the training of Basic of Boiler. CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE50

2.2 Flue Gas Emissions


Clean
Flue Gas Treatment System; Gas

Treated
Flue Gas
Flue Gas

Dust FGD Stack


E P ABSORBER
SO2
SO2

Coal
Air
Fly Ash SEA
Handling WATER
System
Mixing Basin
Boiler EP FGD STACK

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE51

2.2 Flue Gas Emissions

STACK Boiler
IDF EP

FGD

Location of Boiler and Main BOP MHI BUSINESS


CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE52

2.2 Flue Gas Emissions


Electrostatic Precipitator (EP) ;
MANUFACTURER Mitsubishi Heavy
Industries Mechatronics
Systems, Ltd.
QUANTITY 1 unit
TYPE HORIZONTAL FLOW
DRY TYPE
GAS FLOW RATE 2,698,000 Nm3/h wet
(Performance Coal) (at BMCR condition)
DESIGN FUEL Coal
COLLECTING
98.3%
EFFICIENCY
(at BMCR condition)
(Performance Coal)
OUTLET DUST 50 mg/Nm3
CONCENTRATION (O2=6% Dry)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE53

2.2 Flue Gas Emissions


Electrostatic Precipitator (EP) ;
Trans/
Insulator chamber Rapping
Rectifier
motor

Gas Outlet
Discharge Erectrode Duct

Gas Distribution Plate

Collecting Erectrode

(Photo : Reference plant in Mexico) Hopper

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE54

2.2 Flue Gas Emissions


Flue Gas Desulfurization (FGD) ;

MANUFACTURER Mitsubishi Heavy


Industries, Ltd

QUANTITY 1 unit

TYPE Double Contact Flow


scrubber

DESIGN FUEL Coal

SO2 REMOVAL 92.0 %


EFF.

OUTLET SO2 196 mg/l


(at O2 6% dry)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE55

2.2 Flue Gas Emissions


Flue Gas Desulfurization (FGD) ;

1.8 C-276 B olts


Alloy

(Photo : Reference plant in Saudi Arabia)

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE56

2.2 Flue Gas Emissions


Continuous Emission Monitoring System (CEMS)
Following parameters will be continuously monitored at the
half part of Stack and automatically reported to DCS.

• SO2
DCS
• NOx
• Dust
• CO, CO2
• O2
CEMS
Power Station

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE57

Contents
2. Environmental Features are...
2.1 Overall Plan
2.2 Flue Gas Emissions
2.3 Seawater Discharge

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE58

2.3 Seawater Discharge


SEA WATER DISCHARGE LIMITS.
Parameter Values
(1) Temperature : < 40℃
(2) pH : ≧ 6.0
(3) COD : ≦ 100 mg O2/l
(4) Dissolved Oxygen : ≧ 2.7 O2/l

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE59

PROGRAM
A2. Features of PAITON project are...
1. PAITON Project Outline
2. Environmental Features
3. Design Criteria
4. Operating Condition

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE60

Contents
3. Design Criteria is...
3.1 Applicable Codes and Standards
3.2 Plant Identification

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE61

3.1 Design Codes and Standard


(1) Applicable codes and standards

ØMechanical : ASME, ANSI, ASTM, NFPA, ISO, JIS,


JSME, API, ASHRAE, AISC, AMCA,
AWS, AWWA, OSHA, HEI, TEMA, UL, etc.

ØCivil : ACI, ASCE, AIJ, UBC, etc.

ØI&C Electrical : ANSI, IEC, IEEE, ISA, ICEA, IEC,


JEC, JEAC, NEMA, NEC, etc.

In addition to the above listed standards, Indonesian


standards and Manufacture Standards will also be used.

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE62

Contents
3. Design Criteria is...
3.1 Applicable Codes and Standards
3.2 Plant Identification

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE63

3.2 Plant Identification


(1) Column Numbering Procedure

Priority 1: West to East by number (1,2,3,...)


Priority 2: South to North by alphabet (A,B,C,…)

Main Column Sub-Column


West- South- West- South-
East North East North
ST & Common 1,2,3,… A,B,C,… 1A,1B, A1,A2,
Building, 2A,… B1,…
Boiler House

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE64

WEST

1
2 1A

TURBINE
3 2A

BOILER
4 3A
SOUTH NORTH

A B C D

EAST MHI BUSINESS


CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE65

3.2 Plant Identification


(2) Project Document Numbering System
• Engineering & Project Document Numbering Conventions
• Engineering Drawing Numbering Conventions
Ø Format ----------- A123 – 12 – 1234.56 – A123

Project Number
Document Type
Engineering or Project
Subject
Sequential Number

Sample: G101-25-1723.09-L070 ( Boiler Manual )


MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE66

3.2 Plant Identification


(2) Project Document Numbering System
• Engineering & Project Document Numbering Conventions
• Engineering Drawing Numbering Conventions
Ø Format ----------- A123 – 12 – 3 AA - AA – A123
Project Number
Drawing Type
Unit
Area / Building
System / Category
Sequential Number
Sample: G101-31-3-05-00-E001 (Plot Plan)
MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE67

3.2 Plant Identification


(3) Mitsubishi Numbering System (MNS)

For example;
03LBA01BR001
Sequential
number

Unit Code System Code Equipment Code


01 : Unit 1 LBA01 : Main steam system BR : Pipe
02 : Unit 2 LCA12 : Condensate system AA : Valve
03 : Unit 3 LAB12 : Feed water system AP : Pump

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE68

Contents
3. Design Criteria is...
3.1 Applicable Codes and Standards
3.2 Plant Identification

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE69

PROGRAM
A2. Features of PAITON project are...
1. PAITON Project Outline
2. Environmental Features
3. Design Criteria
4. Operating Condition

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE70

Contents
4. Operating Condition are...
4.1 Load Conditions
4.2 Load Change Rate
4.3 Start up Time

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE71

4.1 Load Conditions


l Operating Condition
- Base load and variable load operation
- Maximum load for continuous operation : BMCR
- Minimum load for continuous operation : 35% load
100% Load 75% Load 50% Load 35% Load BMCR
ELECTRICAL
POWER
OUTPUT
865.9MW 649.5MW 433.0MW 303.1MW 882.9MW
(GROSS)
MAIN STEAM
FLOW RATE
2,630 t/h 1,918 t/h 1,258 t/h 905 t/h 2695 t/h
Pressure 24.5MPa(g) 18.3MPa(g) 12.3MPa(g) 8.97MPa(g) 25.0MPa(g)
@ MSV INLET
Temperature 538 deg C 538 deg C 538 deg C 538 deg C 538 deg C
@ MSV INLET
Temperature 566 deg C 566 deg C 566 deg C 538 deg C 566 deg C
@ RSV INLET

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE72

Contents
4. Operating Condition are...
4.1 Load Conditions
4.2 Load Change Rate
4.3 Start up Time

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE73

4.2 Load change rate

Load Change Operation during normal operation

Pulverizer
Load Rate
Band operation
100%
100% - 70% 12 MW/min 5
70%
70% - 50% 12 MW/min 4
50%
50% - 35% 8 MW/min 3 35%

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE74

Contents
4. Operating Condition are...
4.1 Load Conditions
4.2 Load Change Rate
4.3 Start up Time

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE75

4.3 Start up time


Start-up period as per each mode

Start-up Mode COLD1 COLD2 WARM HOT


(Shutdown period) (> 150hr) (56~150hr) (8~56hr) (< 8hr)
Start-up period (hour) 13 10.2 6.5 4.2
(*1) (13) (13) (6.7) (4.2)

Light off → Steam Admission 300 300 130 70

Steam Admission → Synchro. 155 50 35 15

Synchro. → Full Load 262 203 162 136

(*1):( )is as per contract specification

MHI BUSINESS
CONFIDENTIAL
A. Basics General A1 Features of PAITON Project PAGE76

A-1 Features of PAITON Project

End

MHI BUSINESS