Download as pdf
Download as pdf
You are on page 1of 2
‘consouarTED CONSULTANTS Rel: CIATCCOM267S/CA214/2020 Date: 03tlune/2020 To: Arab Towers Contracting Co. (ATCCO). ‘Yathreb Commercial Complex. Wasfl Al Tal Sti, 11983 P.O. Box (06) 598 Amman 11953 Jordan. Tol 962 6) 5530381, 5537064 Fax :( 962 6) 6533662 ‘nfo@atoco.cam.o ‘atin: Eng. Jamal.Qarain Project: 2675 -Abdall views Project, Plots 7A-a and 7At-b, Abdali Project District Subject: House Eneray Nator We refer to the Contractors letter ref # ATCCO-AV.CA.2020.284 dated 2 April 2020, pertaining to the House Energy Meter in response to Enginoor’s Letier ref. # GAIATCC0/2675ICA272/2020, dated 4" March 2020, please find below the AOR's response where he highlighied that the inquitos raised in the above letter dows not refer to speatc Technical Issues that need to be addressed from AOR’s side, and their stand remain a oftheir ealy replies. Inthe same context AOR weuld tke to draw your kind attention to the following 1. The statements incctd inthe rser diagram "Each FAHU/FCUS willbe provided by the folowing house energy meters by the Operator billed, 1- one meter for chile supply 2- one meter ‘or healing supply” are providing the same meaning of “One House energy meter ‘or child water and ane house energy mote fr heating vill be provided by the operator to very the JDE bil” also "One house energy meter for Clarifiers provided and billed by the operator”, where the fist sentence cals to provide house energy meters by the Operator billed, so not forthe Operator billed as per the Contractor understanding. 2, Centractoris trying tomerge the quantes of wo diferent billed items with diferent tes. togather whichis not accepted ,Our understanding forthe house energy ‘meters listed under BO items as follows, 4. Hom (83/29/30) Is elated for smal sizes meters as extrapolate from the price rate of ths tem 291.5 JDieach, which means that these meters cover the apartments meters and small activated services dietibuled as follows ‘Usparimants meters 1%-230 floor 248X2 = 496 No, welfare facitas 9 collar 11X22 No and Reals & GYM meters in ground floor 11X2= 22 No. Total ‘small meters quantities 620 No, shortage of 4 energy meters within the subject BOO item which calls for 816 no. Xe F +9626 412500 F E inlodgroun-eccom vwgoup-cecom consouareD 0 ‘CONSULTANTS EFQM’ croup =, hem (81/9/51) is elated for large sizes motors as extrapolate from the price Fate ofthis iam 2,580 JDieach, which means that these meters cover the FAHUs, Calor and HEXS from bulding side dstnbuted as folows (FAHU 2k2 = 4 No, Calonifer | No and HEXs trom building side 2no, Total large ‘motors quantities 7 No, shortage of one energy meter within the subject BOO item wtih cals for 6 no, Based on the above; needless to mention that total number of House Energy meters are ‘learly evident in Riser Diagram Drawings despite the deviated numbers inthe relevant | Boa’. ‘The Enginoer hero advise te Contractor to take the proper action related to these Energy meters and aves any further delay Regatds, E inloagroup-eccom | wogroap-eccom PB S076 Arran SS Jon

You might also like