Subject: House Eneray Nator
We refer to the Contractors letter ref # ATCCO-AV.CA.2020.284 dated 2 April 2020,
pertaining to the House Energy Meter in response to Enginoor’s Letier ref. #
GAIATCC0/2675ICA272/2020, dated 4" March 2020, please find below the AOR's
response where he highlighied that the inquitos raised in the above letter dows not refer
to speatc Technical Issues that need to be addressed from AOR’s side, and their stand
remain a oftheir ealy replies.
Inthe same context AOR weuld tke to draw your kind attention to the following
1. The statements incctd inthe rser diagram "Each FAHU/FCUS willbe provided by
the folowing house energy meters by the Operator billed, 1- one meter for chile
supply 2- one meter ‘or healing supply” are providing the same meaning of “One
House energy meter ‘or child water and ane house energy mote fr heating vill
be provided by the operator to very the JDE bil” also "One house energy meter
for Clarifiers provided and billed by the operator”, where the fist sentence cals to
provide house energy meters by the Operator billed, so not forthe Operator billed
as per the Contractor understanding.
2, Centractoris trying tomerge the quantes of wo diferent billed items with diferent
tes. togather whichis not accepted ,Our understanding forthe house energy
‘meters listed under BO items as follows,
4. Hom (83/29/30) Is elated for smal sizes meters as extrapolate from the
price rate of ths tem 291.5 JDieach, which means that these meters cover
the apartments meters and small activated services dietibuled as follows
‘Usparimants meters 1%-230 floor 248X2 = 496 No, welfare facitas 9 collar
11X22 No and Reals & GYM meters in ground floor 11X2= 22 No. Total
‘small meters quantities 620 No, shortage of 4 energy meters within the
subject BOO item which calls for 816 no.
Xe
F +9626 412500 F
E inlodgroun-eccom
vwgoup-cecomconsouareD 0
‘CONSULTANTS EFQM’
croup =,
hem (81/9/51) is elated for large sizes motors as extrapolate from the price
Fate ofthis iam 2,580 JDieach, which means that these meters cover the
FAHUs, Calor and HEXS from bulding side dstnbuted as folows (FAHU
2k2 = 4 No, Calonifer | No and HEXs trom building side 2no, Total large
‘motors quantities 7 No, shortage of one energy meter within the subject
BOO item wtih cals for 6 no,
Based on the above; needless to mention that total number of House Energy meters are
‘learly evident in Riser Diagram Drawings despite the deviated numbers inthe relevant |
Boa’.
‘The Enginoer hero advise te Contractor to take the proper action related to these Energy
meters and aves any further delay