Project Cost: SAR700,000,000

Project Duration: 4 years Client: ARAMCO/SKEC Mar 2011-Oct 2015

 YERP/YASREF Project Yanbu, K.S.A


Interconnecting Pipe System with more than 1200 interfaces to other EPCs.
Project cost SAR800,000,000.00+ [$200,000,000.00+].
Project Duration: 3 years Client: ARAMCO/Sinopec Mar 2011-Aug 2014

 ZEPERELLE MKTG & CONSTRUCTION, Cavite City, Philippines 2005-2011


PROJECT CONSULTANT

 Planned, organized, acted as adviser for and managed the construction of local
government facilities.
 Responsible for preparation of contract documents and handling of procurement
processes. Ensured the feasibility of construction sites in accordance with building code
and city ordinances. Liaised with city officials for permits and requirements.
 Prepared and implemented safety management plans to ensure safety and security at
the workplaces.
 Prepared value engineering analysis for cost-effective project execution and successful
project delivery.

A 30-ft high political billboard along Batangas City highway.


Project cost P450,000.00 [$10,000.00]. Designed and constructed along main
thoroughfare.
Project Duration: 1month Client: Zeperelle Marketing/City of Batangas

 CJCLDS, Quezon City, Philippines 1997-2006


PROJECT SUPERVISOR
 Acting in the capacity of a Resident Engineer for and in behalf of the Owner
 Provided client with advanced managerial and general inspection services from the
planning phase of the projects up to the operation stage to ensure high quality facilities
for end-users.

Key Projects And Accomplishments:

 CJCLDS US-Standard Facilities Luzon Islands, Philippines


Averaging P50,000,000.00 [$1,250,000.00] per project
Project Duration: 9months (Average) Client: CJCLDS 1998-2006

Batangas Billboard Batangas City, Philippines


A 30-ft high political billboard along Batangas City highway.
Project cost P450,000.00 [$10,000.00]. Designed and constructed along main
thoroughfare.
Project Duration: 1month Client: Zeperelle Marketing/City of Batangas

-conditioning Project Goa, Bicol, Philippines

JosePercivalBorja CV Page |2

You might also like