Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRESENTATION SHEET ON COMMERCIAL TERMS

S.NO PARTICULARS COMMERCIALS NOTES

A Financials Terms
License Fee (Rs. Per sq. ft per month on the
A1 90/- GST, as applicable
GLA) - bareshell premises

Interest Free Refundable Security Deposit 3 months at the time of signing of Term Sheet
A2 9
(License Fee Deposit) in Months 6 months at time of signing License Agreement

30 days from the date of termination of agreement or


A3 Refund of Security Deposit -
expiry of the License term, which ever is earlier
Maintenance Charges During Office Hours Indicative Maintenance Charges are INR 19 +
A4 Cost + 20%
(Rs per sq. ft per month on the GLA) Chilled Water Charges psf/month
Interest Free Refundable Maintenance Deposit 9 months at the time of signing of Maintenance
A5 9
(months) Agreement
at Rs 4500/- per KVA of power load supplied to the
A6 Bulk electricity Deposit (Refundable) As supplied to the License Premises
Licensee.
Maintenance Charges After Office Hours
A7 Cost + 20% -
(Rs. per hour)
A8 %age of escalation 15%
Escalation on License Fee, Indicative CAM, Car
Parking Charges and Security Deposits
A9 Escalation after period (years) 3

A10 Property Taxes To be borne solely by the Licensee as applicable As per Actuals

A11 Car Parking and Costs 1 per 1,000 sft of GLA @ INR. 5,000 per slot per month GST, as applicable

A12 Additional Car Parking Subject to availability @ INR. 7,000 per slot per month GST, as applicable

B Non Financial Terms

B1 Duration of License term (years) 9 -

B2 Termination/Renewal Notice period (months) 6 post Lock-in


Penalty on vacation within lock-in period will be to
B3 Lock in period (months) 36 pay License Fee, car parking charges and CAM for
unexpired lock-in term
B4 Type of Agreement License Agreement -

Licensed Premises will be handed over for fit-outs


B5 Handover for Fit-outs after signing of License Agreement, Maintenance &
Service Agreement & Indemnity Bond

B6 License Commencement date From the Date of Signing the License Agreement -

During fit-out period, water and electricity at actuals


B7 License Fee Commencement date 60 days from License Commencement date will be charged along with any direct expenses, as
requested.
C Others Terms
3rd to 5th Floor
C1 GLA on which License Fee is payable (sq.ft.) 77,700 sq. ft.
Tower - 3
Office Hour Timings 8.00 AM - 8.00 PM, Monday to Friday National and Public Holidays are not considered as
C2
(Applicable to car-parks too) 8.00 AM - 2.00 PM Saturday Normal Business Hours
At the designated spaces earmarked in the Building
C3 Signage Location -
Directory and in the lobby of the respective floors.

C4 Billing Cycle Monthly -

NOTE :
The validity of these terms and conditions is till 15th November, 2019 and subject to availability of premises.
One time Misc. charges for meter deposit and maintenance: Rs.50,000 (approx.) plus taxes if any
Floor plans with sqft areas are annexured below.

You might also like