Monthly Progress Report - Template 000

CLIENT NAME
CLIENT LOGO

Agreement No: XXX/XX/XX/XX/XX

Project Title:
EPC Works for XYZ Project

Location: PROJECT TITLE


CA, USA

Client: MONTHLY PROGRESS REPORT


XYZ Company
MPR No.: XX-XX-XX-xxx
Consultant:
XYZ COMPANY Reporting Period: xx-Dec-xx to xx-Dec-xx

Contractor:
XYZ COMPANY

Project Milestone:
Award Date: xx-Feb-xx
CONTRACTOR NAME
Duration: XX Months
Completion: XX-Mar-XX

Project Project Days Remaining Remaining Remaining


Commence Completion Elapsed till Days for Days for Days for
Agreement Value:
XXX Million US$ incl. Date Date Cut-off Milestone-1 Milestone-2 Completion
Approved Variations xx-OCT-xx xx-JAN-xx 122 125 xxx xxx

THIS IS SAMPLE REPORT ONLY, CHANGE, ADD, OR DELETE SECTIONS


CONTRACTOR LOGO OF REPORT ACCORDING TO YOUR PROJECT REQUIREMENT.

Originator/
Description Date Approved by
Reviewer

Issued for Information Mujahid Akhtar XYZ


XX-Jan-XX
Signature

1 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

TABLE OF CONTENT
1. PROJECT INTRODUCTION ............................................................................................................................ 3

2. EXECUTIVE SUMMARY................................................................................................................................ 3

3. PROGRESS & EARNED VALUE ANALYSIS SUMMARY ..................................................................................... 4

4. PROGRESS ANALYSIS .................................................................................................................................. 5

5. KEY ISSUES & CONCERNS ............................................................................................................................ 8

6. OPPERTUNITIES .......................................................................................................................................... 8

7. PROJECT HSE STATISTICS ............................................................................................................................ 8

8. DETAILED PROGRESS OVERVIEW............................................................................................................... 10

A. ENGINEERING ....................................................................................................................................... 13

B. PROCUREMENT INCL. ORDERING, MANUFACTURING AND DELIVERY ..................................................... 22

C. CONSTRUCTION INCL. PRE-COMMISSIONING AND COMMISSIONG ........................................................ 23

D. PROJECT, QUALITY AND CONTRACT MANAGEMENT .............................................................................. 32

9. PROGRESS DELAY ANALYSIS...................................................................................................................... 34

10. CRITICAL PATH...................................................................................................................................... 34

11. ATTACHMENTS: .................................................................................................................................... 35

2 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

1. PROJECT INTRODUCTION
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
If required, and you have PROJECT Schematic Diagram you can include here!

(Fig-1)

2. EXECUTIVE SUMMARY

Description Controlled Caution Critical Remarks

Project Deliverables On-time

HSE/Safety No LTI

Project Schedule Write short top reason for Schedule slippage

Project Cost Within Budget


Give description of top Risk(s) which are to be
Risks / Uncertainties
monitored closely
Write about overall project (schedule, cost, scope,
Overall Project
quality etc.)

Current Progress Cumulative Progress (%)


Remarks / Reasons for Delays
Overview B/L Plan Actual Variance

E – Engineering (15%) 99.00% 95.00% -4.00%


Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your
P – Procurement (45%) 80.00% 70.75% -9.25% Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your
C – Construction (40%) 70.10% 71.00% 0.90% Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here
OVERALL PROGRESS
78.89% 74.49% -4.40%
(100%)
Project Key Milestones
Text Here Your Text Here Your Text Here Your Text Here
Milestone-1 xx-Jan-xx xx-Jan-xx Your Text Here Your Text Here
Text Here Your Text Here Your Text Here Your Text Here
Milestone-2 xx-Feb-xx xx-Feb-xx Your Text Here Your Text Here
Text Here Your Text Here Your Text Here Your Text Here
Milestone-3 xx-Mar-xx xx-Mar-xx Your Text Here Your Text Here

3 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

3. PROGRESS & EARNED VALUE ANALYSIS SUMMARY

RMN
RMN 5.0%
RMN RMN
25.5%
29.3% 29.0%

Plan: 49.48% Plan: 49.48% Plan: 49.48% Plan: 49.48%

ACT ACT
ACT
70.8% 71.0%
74.5% ACT
95.0%

OVERALL PROJECT E - ENGINEERING P - PROCUREMENT C- CONSTRUCTION


Reporting Month Variance
-4.40% -4.00% -9.25% 0.90%
Last Month Variance
-5.00% -4.25% -9.00% 1.00%

EXPLAIN ABOVE CHARTS FOR EACH PHASE OF PROJECT


Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your

Cost
Schedule Estimated
Budget at Planned Schedule Cost Performance
Earned Actual Cost Performance Cost at
Desciption Completion Value
Value (EV) (AC)
Variance Variance Index
Index Completion
(BAC) (PV) (SV) (CV) (CPI =
(SPI = EV/PV) (EAC)
EV/AC)

ENGINEERING

PROCUREMENT

CONSTRUCTION

OVERALL
PROJECT

Explain Above Table for Each Phase of Project (Either show for Overall Project or for each Phase)
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Your

4 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

PROJECT MONTHLY S-CURVE (with or without EVA) – ADD HERE YOUR PROJECT S-CURVE (Also can add for each phase)

4. PROGRESS ANALYSIS
Current MONTH (%) CUMMULATIVE (%)

DESCRIPTION Wtg. Plan Variance Plan Variance


Actual Actual
Baseline Forecast Baseline Forecast Baseline Forecast Baseline Forecast

E- ENGINEERING 15% 99.00% 98.95% 95.00% -4.00% -3.95%

P-PROCUREMENT 45% 80.00% 79.00% 70.75% -9.25% -8.25%

C-
40% 70.10% 68.10% 71.00% 0.90% 2.90%
CONSTRUCTION

Overall Progress 100% 78.89% 77.63% 74.49% -4.40% -3.15%

Explain above table and provide brief interpretation of progress for the MONTH.
Mention key activities performed during the reporting period below:
ENGINEERING:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

5 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

PROCUREMENT:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

CONSTRUCTION/ COMMISSIONING:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
4.1 MONTHLY Baseline vs Actual Trend

Explain above graphs as per progress on your project. I have given snapshot of few months only.

Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

6 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

4.2 Negative Variance Trend w.r.t. Baseline Plan

Explain above graphs as per progress on your project. I have given snapshot of few months only.

Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
4.3 MONTHLY S-curve (Actual vs Baseline Plan)

Explain above S-Curve as per progress on your project. I have given snapshot of few months only.

7 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

5. KEY ISSUES & CONCERNS

Sr. Impacted Actions Action Action


Key Issues
No. Activities Required By Date

Your Text Here Your Text Your Text Here Your Text
1. Your Text Here Your Text Here CONTRACTOR xx-Jan-17
Here Here

Your Text Here Your Text Your Text Here Your Text
2. Your Text Here Your Text Here CONTRACTOR xx-Jan-17
Here Here

Your Text Here Your Text Your Text Here Your Text
3.
Your Text Here Your Text Here Here CONTRACTOR xx-Jan-17
Here

Your Text Here Your Text


Your Text Here Your Text
4. Your Text Here Your Text Here Here CONTRACTOR xx-Jan-17
Here

Your Text Here Your Text


Your Text Here Your Text
5. Your Text Here Your Text Here Here CLIENT xx-Jan-17
Here

Your Text Here Your Text


Your Text Here Your Text
6. Your Text Here Your Text Here Here CLIENT xx-Jan-17
Here

Your Text Here Your Text


Your Text Here Your Text
7. Your Text Here Your Text Here Here CLIENT xx-Jan-17
Here

6. OPPERTUNITIES
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text
Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

8 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

7. PROJECT HSE STATISTICS


Project XYZ
Sr. No. PROJECT HSE STATISTICS This
Cumulative
Month
1 Total number of employees
2 Man-hours worked
3 Fatalities (death)
4 Fatal accident rate (FAR)
5 Permanent total disabilities (PTD)
6 Permanent partial disabilities (PPD)
7 Lost workday cases (LWDC)
8 Lost time injuries (LTI)
9 Lost time injury frequency rate (LTIFR)
10 Lost workdays (days lost)
11 Severity rate
12 Restricted workday cases (RWC)
13 Restricted workdays
14 Medical treatment cases (MTC)
15 Total recordable cases (TRC)
16 Total recordable cases frequency (TRCF)
17 Total number of vehicles
18 Vehicle incident, category 1 (serious)
19 Cost of vehicle damage ($)
20 Vehicles kilometers driven

21 Vehicle accident frequency rate (VAFR) VAFR

22 Total employees trained (actual)


23 Total training hours
24 Total training hours/employee (average)
25 First aid cases
26 Near misses
27 Fires
28 Property damage or process loss
29 Cost of property damage and process loss including fires ($)
30 HSE meetings conducted
31 HSE inspections carried out
32 Emergency exercises / drills conducted
33 Total road safety violations by IVMS

Change above table as per your project requirement.

9 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

8. DETAILED PROGRESS OVERVIEW

8.1 PROJECT MILESTONE SUMMARY


Milestones Milestones Milestones
Milestones Milestone
Milestone Number of Scheduled Completed Completed
Scheduled Variance
Category Milestones during this during this till
till Date (A) (B-A)
Month Month To-Date (B)
E - Engineering 20 2 1 10 9 -1
P - Procurement 20 2 0 10 9 -1
C - Construction 20 2 1 10 9 -1
Total: 70 7 3 35 31 -4*
*Following milestones have not achieved;
1. Your Text Here Your Text Here
2. Your Text Here Your Text Here
3. Your Text Here Your Text Here
4. Your Text Here Your Text Here
5. Your Text Here Your Text Here
8.2 PROJECT MAJOR MILESTONES

MILESTONES DESCRIPTION BASELINE FORECAST ACTUAL

Your Text Here Your Text Here xx-Oct-xx - xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx - xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx - xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx - xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx - xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

Your Text Here Your Text Here xx-Oct-xx xx-Oct-xx

For detailed Milestones List, Refer ATTACHMENT - PROJECT MILESTONES

10 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

8.3 PROJECT RISKS MATRIX & TOP TEN (10) RISKS

1. PROJECT RISKS MATRIX

4 1 2 6

Consequence
3 1 7 5 2

2 1 5 3

1 2 2

A B C D E
Probability
2. TOP TEN (10) RISKS

Following are major project risks that were identified during workshop conducted on xx-Dec-xx;
Risk Risk
Risk Description (Top Ten) Mitigation Action RAM
Rank No.

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
1 19 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
2 25 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
3 10 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
4 36 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
5 51 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
6 40 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

11 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
7 14 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
8 16 • Your Text Here Your Text Here Your Text D4
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
9 25 • Your Text Here Your Text Here Your Text E3
Text Here
• Your Text Here Your Text Here Your Text

• Your Text Here Your Text Here Your Text


Your Text Here Your Text Here Your
10 46 • Your Text Here Your Text Here Your Text E3
Text Here
• Your Text Here Your Text Here Your Text

Refer ATTACHMENT - PROJECT RISK REGISTER

12 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

8.4 NOC (NO OBJECTION CERTIFICATES) SUMMARY STATUS

NOC Status Activity-1 Activity-2 Activity-3 Activity-4 Activity-5 Activity-6 Activity-7 Total

Total

Default NOC

NOC with conditions

NOC without conditions

Conditions to Issue NOC

Objections

In Progress

No Answer

*Following NOCs’ are critical for the project however have not received.
1. Your Text Here Your Text Here
2. Your Text Here Your Text Here
3. Your Text Here Your Text Here
4. Your Text Here Your Text Here

For details, refer ATTACHMENT XX – NOC REGISTER

8.5 MAJOR ACTIVITIES PERFORMED DURING REPORTING PERIOD

A. ENGINEERING
1. ENGINEERING Progress (%) Summary

Current MONTH (%) CUMMULATIVE (%)

DESCRIPTION Wtg. Plan Variance Plan Variance


Actual Actual
Baseline Forecast Baseline Forecast Baseline Forecast Baseline Forecast

Project
10% 99.00% 98.95% 95.00% -4.00% -3.95%
Management

Detailed
70% 80.00% 79.00% 70.75% -9.25% -8.25%
Engineering

Procurement
15% 70.10% 68.10% 71.00% 0.90% 2.90%
Support

Subcontracting 05% 70.10% 68.10% 71.00% 0.90% 2.90%

E - Engineering 100% 78.89% 77.63% 74.49% -4.40% -3.15%

Amend above table as per your project Work Breakdown Structure (WBS).

13 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

 Following are the highlights of Engineering activities during the month.

➢ PROCESS
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ HSE
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ QUALITY
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ PIPELINE
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (ROTARY)
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
14 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)
Monthly Progress Report - Template 000

➢ MECHANICAL (STATIC)
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (PACKAGE)
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ INSTRUMENTATION
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ELECTRICAL
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ TELECOM
Documents Issued for IFC / Issued for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issued for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
15 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)
Monthly Progress Report - Template 000

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ OTHER DISCIPLINE
• Add as per your Project.
2. CUMULATIVE DELIVERABLE STATUS SUMMARY (CLASS WISE)

Total Nos IFR IFA Final Issue


Document Class
(Baseline) (Latest) Plan Actual Plan Actual Plan Actual

Class - 1

Class - 2

Class - 3

Class - 4

Total

3. THIS MONTH DELIVERABLE STATUS SUMMARY (CLASS WISE)

Total IFR IFA Final Issue IFC with


Document Class
Hold
Plan Act Plan Act Plan Act Plan Act
Class - 1

Class - 2

Class - 3

Class - 4

Total

4. THIS MONTH CLIENT REVIEW /APPROVAL STATUS SUMMARY (CLASS WISE)


Code
Document Class Total Nos
1 2 3 4 5
Class - 1
Class - 2
Class - 3
Class - 4
Total

5. CUMULATIVE DELEIVRABLE STATUS TILL FIRST ISSUANCE (IFR)


Squad Check
Document Stated Draft Completed IFR
Discipline Completed
Plan Actual Plan Actual Plan Actual Plan Actual
HSE
Instrumentation
Mechanical Package
Mechanical Rotary
Mechanical Static
Pipeline
Piping

16 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

Process
Telecom
Total

6. DELIVERABLES ISSUED DURING THIS MONTH

Discipline IFR IFA IFC with Hold Final Issue Total

HSE
Instrumentation
Mechanical Package
Mechanical Rotary
Mechanical Static
Pipeline
Piping
Process
Total
7. DELIVERABLES RESPONDED DURING THIS MONTH BY CLIENT WITH REVIEW / APPROVAL CODE

IFR – Review Code IFA – Approval Code


Discipline
1 2 3 4 5 Total 1 2 3 4 5 Total
HSE
Instrumentation
Mechanical Package
Mechanical Rotary
Mechanical Static
Pipeline
Piping
Process
Total

8. TECHNICAL QUERY SUMMARY STATUS

Last Month This Month Cumulative


Cumulative
Description
Pending
Received Answered Received Answered Received Answered

TQ

9. CUMULATIVE PROCUREMENT SUPPORT SERVICES SUMMARY STATUS

Submit TBE for


Start Enquiry TBE Approved by Issue Purchase
Enquiry Floated Receive Offers COMPANY
Package Company Order
Description (WBS) Total No. Approval

Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act

Equipment
(Stationary/Roraty)

Bulks Materials

Pipeline/ Flow lines

17 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

Overhead Lines

Total:

10. CUMULATIVE SUBCONTRACTING SUPPORT SERVICES SUMMARY STATUS

Submit TBE for


Start Enquiry TBE Approved by Issued Subcontract
Enquiry Floated Receive Offers COMPANY
Total Package Company Agreement
Description Approval
No.
Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act

Detailed
Engineering
Construction/
Commissioning

Others

Total:

Change above tables as per your project Work Breakdown Structure (WBS).
11. DELIVERABLES ISSUANCE, REVIEW/APPROVAL TRENDS

Briefly explain the above graph.


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

12. RECEIVED/PENDING DELIVERABLES SUMMARY - COMPANY

Deliverables Due Status Deliverables Pending with Company


Total
Total Over Due in Total
Deliverable Due <1 1-2 3-4 >4
Deliverable Due next 5 Doc.
Received Today Week Week Weeks Weeks
Deliver. Days Pending

18 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

13. RECEIVED/PENDING DELIVERABLES SUMMARY - CONTRACTOR


Total Deliverables Pending with Contractor Document Review Code Status
Deliverable
Total Total
Received <1 1-2 3-4 >4 Code Code Code Code Code
Deliverable Doc.
from Week Week Weeks Weeks 1 2 3 4 5
Company Pending

 Following are the major activities planned for Home Office activities during the next MONTH;

➢ PROCESS
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ HSE
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ QUALITY
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ PIPELINE
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (ROTARY)
19 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)
Monthly Progress Report - Template 000

Documents Issue for IFC / Issue for Implementation


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (STATIC)
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ MECHANICAL (PACKAGE)
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ INSTRUMENTATION
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ELECTRICAL
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
20 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)
Monthly Progress Report - Template 000

➢ TELECOM
Documents Issue for IFC / Issue for Implementation
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Re-IFR/ IFA incorporating company comments
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Documents Issue for Review (IFR)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ OTHER DISCIPLINES
• Add as per your Project.

21 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

B. PROCUREMENT INCL. ORDERING, MANUFACTURING AND DELIVERY


1. PROCUREMENT Progress (%) Summary

Current MONTH (%) CUMMULATIVE (%)

DESCRIPTION Wtg. Plan Variance Plan Variance


Actual Actual
Baseline Forecast Baseline Forecast Baseline Forecast Baseline Forecast

95.00
Equipment 10% 99.00% 98.95% -4.00% -3.95%
%

70.75
Bulks Materials 70% 80.00% 79.00% -9.25% -8.25%
%

Pipeline/ 71.00
15% 70.10% 68.10% 0.90% 2.90%
Flow lines %

71.00
Overhead Lines 05% 70.10% 68.10% 0.90% 2.90%
%

74.49
PROCUREMENT 100% 78.89% 77.63% -4.40% -3.15%
%

Change above table as per your project Work Breakdown Structure (WBS).
 Following are the highlights of Procurement activities during the month;
2. Pre-Order
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

3. Post-Order
Note: I would suggest segregating activtiies e.g. FAT Complete, Ex-Wors Delivery, Received at Local Port,
Received at Site etc. for each WBS element
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines

22 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

4. CUMULATIVE PROCUREMENT SUMMARY STATUS


Submission of
Receive Key Fabrication
Issue Purchase KVD for KVD Approved by Sub-orders are
Vendor documents are
Order COMPANY COMPANY Completed
Description Scope Documents Approved
Approval
Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act
Equipment
(Static/Rotary)
Bulks Materials

Pipeline/ Flow lines

Overhead Lines

Total

Issue Purchase Order Manufacturing Final acceptance EXW FOB delivery Material Receipt at site
Description Scope
Plan For Act Plan For Act Plan For Act Plan For Act Plan For Act
Equipment
(Static/Rotary)
Bulks Materials
Pipeline/ Flow lines
Overhead Lines

Total

Change above table as per your project requirments, Work Breakdown Structure (WBS) and Rule of Credit.
 Following are the highlights of Procurement activities during the month;
5. CRITICAL EQUIPMENT & MATERIALS (Long Lead Items) STATUS
➢ Pumps
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Package Equipment
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ESD Valves
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ DCS System
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Power Skids
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Others
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

 Following major activities are planned for Procurement activities during the next month;

23 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

6. Pre-Order
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

7. Post-Order
Note: I would suggest segregating activtiies e.g. FAT Complete, Ex-Wors Delivery, Received at Local Port,
Received at Site etc. for each WBS element
Equipment (Static/Rotary)
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Bulks Materials
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Pipeline/ Flow lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
Overhead Lines
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

8. CRITICAL EQUIPMENT & MATERIALS (LONG LEAD ITEMS) STATUS


➢ Pumps
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Package Equipment
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ ESD Valves
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ DCS System
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Power Skids
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
➢ Others
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

24 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

C. CONSTRUCTION INCL. PRE-COMMISSIONING AND COMMISSIONG


1. Construction/Pre-com/Comm. Progress (%) Summary
Current MONTH (%) CUMMULATIVE (%)

DESCRIPTION Wtg. Plan Variance Plan Variance


Base Fore Actual Base Fore Base Fore Actual Base Fore
line cast line cast line cast line cast
Temporary Office &
99.00% 98.95% 95.00% -4.00% -3.95%
Campe Facilities
Procedures &
80.00% 79.00% 70.75% -9.25% -8.25%
Fabrication Drawings
Pre-fabrication /
70.10% 68.10% 71.00% 0.90% 2.90%
Fabrication

Construction Work 70.10% 68.10% 71.00% 0.90% 2.90%

Pre-commissioning 80.00% 79.00% 70.75% -9.25% -8.25%

Commissioning 70.10% 68.10% 71.00% 0.90% 2.90%

As Built, Final Doc. 70.10% 68.10% 71.00% 0.90% 2.90%

C - CONSTRUCTION 100% 78.89% 77.63% 74.49% -4.40% -3.15%

Change above table as per your project Work Breakdown Structure (WBS).
 Following are the highlights of Construction activities during the month;
2. General:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

3. Temporary Office & Site Facilities:


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

4. Procedures & Fabrication Drawings etc.


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

5. Pre-Fabrication / Fabrication (Piping, Steel etc.):


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

25 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

6. Construction Including Mechanical Completion:


Major Construction Commodities & Productivities:

During the
Cumulative Planned
Total Month
Work Item Description UOM Productivity for Next
QTY
Plan Act Plan Act Month

Concrete Works M3
Structural Fabrication MT
Structural Erection MT
Equipment Erection MT
A/G Piping -Fabrication ID
A/G Piping - Erection ID
U/G Piping - Laying ID
Cable Laying - Electrical KM
Cable Laying - Instrumentation KM
Cable Laying - Telecom KM
Pipeline/Flow-line KM
Overheal Lines (132kV) KM
Roads (Gatch) KM
Painting M2
Insulation M2
Others

Change above table and below activities breakdown as per your project scope and WBS.
 Following are the highlights of Construction activities during the month;
Pre-fabrication (Piping/Steel) Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Concreting Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Equipment (Stationary/Rotary) Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

26 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

Road Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Pipeline Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Flow Line Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Electrical Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Instrumentation Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Telecom Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

27 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

Over Head Power Line Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Other Works: (as per your Project Scope & WBS)

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

7. Pre-Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

8. Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

9. As-Built & Final Documentation


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

 Following major activities for Construction are planned during the next month;

Pre-fabrication (Piping/Steel) Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

28 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

Concreting Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Equipment (Stationary/Rotary) Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Road Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Pipeline Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Flow Line Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Electrical Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Instrumentation Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
29 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)
Monthly Progress Report - Template 000

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Telecom Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Over Head Power Line Works:

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

Other Works: (as per your Project Scope & WBS)

• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

10. Pre-Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

11. Commissioning:
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

12. As-Built & Final Documentation


• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here
• Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here Your Text Here

30 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

13. MANPOWER DEPLOYMENT SUMMARY


Last Month This Month Cumulative
Description
Baseline Forecast Actual Baseline Forecast Actual Baseline Forecast Actual

Engineering

Procurement

Construction (Indirect)

Construction (Direct)

Total:

14. CONSTRUCTION EQUIPMENT DEPLOYMENT SUMMARY

Last Month This Month Cumulative


Description
Baseline Forecast Actual Baseline Forecast Actual Baseline Forecast Actual

Civil Works
Mechanical Works
Road Works
OHL Works
Total:

31 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

D. PROJECT, QUALITY AND CONTRACT MANAGEMENT


1. INVOICING STATUS
Total Invoice
Invoice Invoice
Sr. Invoicing VAT Amount Amount incl. Payment
Invoice No. Received Amount
No. Month (AED) VAT Received
Date (US$)
(US$)
1
2
3
4
5
TOTAL

2. Monthly Accrual

Contract Value Accrual to Date


Category
Latest Cumulative to
Original Cum. Previous For the Month
Forecast Date
Lump Sum Element

Provisional Sum

Optional Sum

TOTAL

3. MANAGEMENT OF CHANGE

Impact Assessment
Description of Variation Originator Issue Date Status
Cost Schedule
(*$1,000) (days)

4. MOC PERFORMANCE EPORT (FOR CLIENT)

Average Time
MoC Process Performance
(days)

Evaluation N/A

Approval / Rejection N/A

32 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

Number of Changes/Variations Number

Submitted
Under evaluation
Waiting for approval
Approved
Rejected
5. INSPECTION STATUS

Total Inspections Notification Scheduled Total Inspections Performed

CONTRACTOR CLIENT CONTRACTOR CLIENT


This This
Cumulative This Month Cumulative This Month Cumulative Cumulative
Month Month

6. NCR & CAR STATUS

Total Last Month This Month Cumulative


Description
Raised Open Close Open Close Open Close

NCR

CAR

Total:

7. CORRESPONDANCE SUMMARY STATUS


Response
Total Letters Response Yet to
Description Received/
Issued Required Response
Issued
COMPANY to Contractor

CONTRACTOR to Company

33 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

9. PROGRESS DELAY ANALYSIS– Major or critical activities if appicable


Baseline Current Month Variance
Delay
Activity Name Early Early Total Total (Finish Mitigation
Start Finish Caused By
Start Finish Float Float Date)

10. CRITICAL PATH (Total Float =<xx Days)

Extract from Primavera or MS Project and Include as Attachment to Report


(Only Include here Key Activities on Critical Path)

34 EPC WORKS FOR XYZ PROJECT Prepared by: Mujahid Akhtar)


Monthly Progress Report - Template 000

YOU CAN ADD OTHER SECTIONS AS PER YOUR PROJECT

11. ATTACHMENTS:
• ATTACHMENT NO. I: Monthly Progress Summary Tables
• ATTACHMENT NO. II: Monthly Project S-Curves
• ATTACHMENT NO. III: Overall Project Milestones
• ATTACHMENT NO. IV: Updated L-III/IV Schedule & Critical Path
• ATTACHMENT NO. V: Next Month Lookahead Schedule
• ATTACHMENT NO. VI: Home Office Deliverable Status
• ATTACHMENT NO. VII: List of Deliverables Issued During the Month
• ATTACHMENT NO. VIII: List of Deliverables Responded with Review/Approval Code by Cleint
• ATTACHMENT NO. IX: List of Deliverables Overdue with Contractor (IFR, IFA & Final)
• ATTACHMENT NO. X: List of Deliverables Overdue/Potential Overdue with Client (IFR, IFA)
• ATTACHMENT NO. XI: List of Deliverables Commented by Client but Not Issued Further
• ATTACHMENT NO. XI: List of Documents Started, Draft Completed but Not Yet Issued
• ATTACHMENT NO. XII: Technical Queries Register
• ATTACHMENT NO. XIII: Procurement Status Register (Detailed Item Wise)
• ATTACHMENT NO. XIV: Variation Control Log
• ATTACHMENT NO. XV: Detailed Correspondance Log
• ATTACHMENT NO. XVI: Project Risk Register (Detailed)
• ATTACHMENT NO. XVII: NOC Register (Detailed)
• ATTACHMENT NO. XVIII: Engineering Workshops Status Register
• ATTACHMENT NO. XX: Major Construction Commodities Curves
• ATTACHMENT NO. XXI: Construction Manpower Deploaymen & Histogram (Plan vs Actual)
• ATTACHMENT NO. XXII: Construction Equipment Deployment & Histogram (Plan vs Actual)
• ATTACHMENT NO. XXIII: Site Instructions Register
• ATTACHMENT NO. XXIV: NCR/CAR Register
• ATTACHMENT NO.XXV: Backlog Analysis - Engineering, Procurement and Construction
• ATTACHMENT NO.XXVI: Project Quality KPI’s Status
• ATTACHMENT NO.XXVII: Project Invoicing Register