The subject of this memorandum is the Power Interruptions experienced by Lafarge Cement
Zimbabwe from January 2018 to present. These have affected operations in the production
of cement and induced additional operational costs.
Below are tables of the power interruptions that have been experienced by Lafarge Cement
Zimbabwe year to date (YTD).
Note: The durations of the power interruptions are based on the feed off and feed on of the
Kiln or Cement Mill 1 when Kiln down.
Clinker Cement
Production lost Loss Loss (ton) Power
Count Date From To time (hrs) (tons) source
1 9/1/2018 1550hrs 1750hrs 2.00 90 104 Coleford
2 10/1/2018 2240hrs 0300hrs 4.33 195 225 Coleford
3 11/1/2018 2335hrs 0030hrs 0.92 41 39 Coleford
116 148 Changed to
4 12/1/2018 1830hrs 2105hrs 2.58 Rhodia
5 15/1/2018 1430hrs 1855hrs 4.42 199 230 Rhodia
6 18/1/2018 0845hrs 1115hrs 2.50 113 130 Rhodia
7 26/1/2018 1005hrs 1205hrs 0.50 23 26 Rhodia
8 27/1/2018 2250hrs 0245hrs 3.92 176 204 Rhodia
9 30/1/2018 0547hrs 0630hrs 0.72 32 38 Rhodia
TOTAL 21.89 985 1,144
Clinker Cement
Production Loss Loss Power
Count Date From To lost time (hrs) (tons) (tons) source
1 21/2/2018 0446hrs 0600hrs 2.00 90 104 Rhodia
2 21/2/2018 0707hrs 0830hrs 1.50 68 78 Rhodia
3 21/2/2018 0855hrs 1400hrs 5.08 229 264 Rhodia
4 25/2/2018 0415hrs 0500hrs 1.00 45 52 Rhodia
5 25/2/2018 0900hrs 1005hrs 1.50 68 78 Rhodia
6 27/2/2018 2128hrs 2235hrs 1.50 68 78 Rhodia
TOTAL 12.58 568 654
Clinker Cement
Production Loss (tons) Loss Power
Count Date From To lost time (hrs) (tons) source
1/3/201 127 147
1 8 1540hrs 1830hrs 2.83 Coleford
4/3/201 79 92
2 8 0830hrs 1015hrs 1.75 Coleford
4/3/201 45 52
3 8 1400hrs 1500hrs 1.00 Rhodia
4/3/201 45 52
4 8 1415hrs 1500hrs 1.00 Rhodia
4/3/201 45 52
5 8 1710hrs 1810hrs 1.00 Rhodia
TOTAL 7.58 341 395
A total of 4,374 tons of Clinker, in potential production, valued at USD512,339 has been lost
since the beginning of the year. To compound the matter, 5,067 tons of Cement valued at
USD896,859 has been lost to power cuts and interruptions during the same period.
Cumulatively, we have lost USD1,409,198 in potential revenue due to power cut induced
Plant stoppages since January 2018. Further losses are expected on the refractory lining of
the Kiln due to thermal shock induced by the heating and cooling cycles due to frequent
power cuts. The anticipated refractory failure is expected to cost no less than USD150,000
to make good.
We request a detailed and technical explanation on why these interruptions occurred and the
actions you are taking to address or to prevent their recurrence.
Tom Konstantopoulos
Maintenance Manager, Lafarge Cement Zimbabwe