MEMORANDUM

Date : 30 October 2018

To : The General Manager, Harare Region


Zimbabwe Electricity Transmission and Distribution Company
(ZETDC)

From : Lafarge Cement Zimbabwe

Subject : Power Interruptions at Lafarge Cement Zimbabwe

The subject of this memorandum is the Power Interruptions experienced by Lafarge Cement
Zimbabwe from January 2018 to present. These have affected operations in the production
of cement and induced additional operational costs.

Below are tables of the power interruptions that have been experienced by Lafarge Cement
Zimbabwe year to date (YTD).

Note: The durations of the power interruptions are based on the feed off and feed on of the
Kiln or Cement Mill 1 when Kiln down.

Power Interruptions January 2018

Clinker Cement
Production lost Loss Loss (ton) Power
Count Date From To time (hrs) (tons) source
1 9/1/2018 1550hrs 1750hrs 2.00 90 104 Coleford
2 10/1/2018 2240hrs 0300hrs 4.33 195 225 Coleford
3 11/1/2018 2335hrs 0030hrs 0.92 41 39 Coleford
116 148 Changed to
4 12/1/2018 1830hrs 2105hrs 2.58 Rhodia
5 15/1/2018 1430hrs 1855hrs 4.42 199 230 Rhodia
6 18/1/2018 0845hrs 1115hrs 2.50 113 130 Rhodia
7 26/1/2018 1005hrs 1205hrs 0.50 23 26 Rhodia
8 27/1/2018 2250hrs 0245hrs 3.92 176 204 Rhodia
9 30/1/2018 0547hrs 0630hrs 0.72 32 38 Rhodia
TOTAL 21.89 985 1,144

Power Interruptions February 2018

Clinker Cement
Production Loss Loss Power
Count Date From To lost time (hrs) (tons) (tons) source
1 21/2/2018 0446hrs 0600hrs 2.00 90 104 Rhodia
2 21/2/2018 0707hrs 0830hrs 1.50 68 78 Rhodia
3 21/2/2018 0855hrs 1400hrs 5.08 229 264 Rhodia
4 25/2/2018 0415hrs 0500hrs 1.00 45 52 Rhodia
5 25/2/2018 0900hrs 1005hrs 1.50 68 78 Rhodia
6 27/2/2018 2128hrs 2235hrs 1.50 68 78 Rhodia
TOTAL 12.58 568 654

Power Interruptions March 2018

Clinker Cement
Production Loss (tons) Loss Power
Count Date From To lost time (hrs) (tons) source
1/3/201 127 147
1 8 1540hrs 1830hrs 2.83 Coleford
4/3/201 79 92
2 8 0830hrs 1015hrs 1.75 Coleford
4/3/201 45 52
3 8 1400hrs 1500hrs 1.00 Rhodia
4/3/201 45 52
4 8 1415hrs 1500hrs 1.00 Rhodia
4/3/201 45 52
5 8 1710hrs 1810hrs 1.00 Rhodia
TOTAL 7.58 341 395

Power Interruptions April 2018

Production Clinker Loss Cement


lost time (tons) Loss Power
Count Date From To (hrs) (tons) source
1 7/4/2018 1745hrs 1930hrs 1.75 79 91 Coleford
2 12/4/2018 0830hrs 1015hrs 1.42 64 74 Coleford
3 13/4/2018 1400hrs 1500hrs 5.45 245 283 Rhodia
4 24/4/2018 1415hrs 1500hrs 1.75 79 91 Rhodia
5 25/4/2018 1710hrs 1810hrs 1.58 71 82 Rhodia
TOTAL 11.95 538 621

Power Interruptions May 2018 (MTD)

Production Clinker Cement


lost time Loss (tons) Loss
Count Date From To (hrs) (tons) Power source
1 4/5/2018 1037hrs 1115hrs 0.63 28 33 Rhodia
2 12/5/2018 0600hrs 0950hrs 3.83 172 199 Rhodia
3 13/5/2018 0645hrs 0900hrs 2.25 101 117 Rhodia
4 14/5/2018 0740hrs 1025hrs 2.75 124 143 Rhodia
5 16/5/2018 1808hrs 2100hrs 2.87 129 149 Rhodia
6 17/5/2018 0610hrs 0930hrs 3.33 150 173 Rhodia
7 18/5/2018 0830hrs 1030hrs 2.00 90 104 Rhodia (Dema)
8 18/5/2018 1720hrs 1800hrs 0.67 30 35 Rhodia (Dema)
9 19/5/2018 1145hrs 1210hrs 0.42 19 22 Rhodia (Dema)
10 19/5/2018 1700hrs 1815hrs 1.25 56 65 Rhodia (Dema)
TOTAL 20.00 899 1,040

Power Interruptions June 2018

Production Clinker Loss Cement


lost time (tons) Loss Power
Count Date From To (hrs) (tons) source
1 13/6/2018 1115 1200 0.75 34 39 Rhodia
2 16/6/2018 1520 1600 0.67 30 35 Rhodia
3 16/6/2018 1750 2050 3.00 135 156 Rhodia
4 17/6/2018 1805 2000 0.92 41 48 Rhodia
5 18/6/2018 1900 2030 1.50 68 78 Rhodia
6 20/6/2018 1030 1145 1.25 56 65 Rhodia
7 22/6/2018 0737 1135 3.95 178 205 Rhodia
8 24/6/2018 0930 1050 1.33 60 69 Rhodia
9 26/6/2018 0915 1130 2.25 101 117 Rhodia
10 26/6/2018 1800 1950 1.83 83 95 Rhodia
11 27/6/2018 1620 1830 2.17 98 113 Rhodia
12 28/6/2018 1910 2015 1.08 49 56 Rhodia
TOTAL 15.50 933 1,076

Power Interruptions July 2018

Count Date From To Productio Descriptio Power source


n lost n
time (hrs)
1 2/7/2018 1020hrs 1230hrs 2.17 Power Dip Rhodia
2 3/7/2018 1020hrs 1230hrs 2.17 Power Dip Rhodia
3 4/7/2018 0700hrs 0930hrs  2.50 Power Dip Rhodia
4 7/7/2018 1135hrs 1230hrs 0.92 Power Dip Rhodia
5 21/7/201 1100hrs 1200hrs 1.00 External Rhodia
8 Power
Failure
6 25/7/201 1250hrs 1550hrs 3.00 Power Dip Rhodia
8
7 29/7/201 1835hrs 1950hrs 1.25 Power Dip Rhodia
8
8 29/7/201 2000hrs 0300hrs 7.00 High Rhodia
8 Voltage
TOTAL 20.01    

Power Interruptions August 2018

Coun Date From To Productio Description Power


t n lost time source
(hrs)
1 25/8/2018 1540hrs 1725hrs 1.75 External Power Rhodia
Failure
2 28/8/2018 1420hrs 1500hrs 0.67 Power dip Rhodia
TOTAL 2.42    

Power Interruptions September 2018

Coun Date From To Production Description Power


t lost time source
(hrs)
1 7/9/2018 0000hr 0315hrs 3.25 Rhodia supply down, Rhodia
s connected to
Coleford
2 11/9/201 1800hr 1945hrs 1.45 Low voltage Coleford
8 s
3 12/9/201 1100hr 1140hrs 1.67 Power dip Coleford
8 s
4 22/9/201 0100hr 0250hrs 1.83 Overvoltage, Coleford
8 s Seniors s/S tx trip
             
             
TOTAL 8.20    

Power Interruptions October 2018

Coun Date From To Production Description Power


t lost time source
(hrs)
1 14/10/201 1400hr 1900hrs 5.00 Power dip and Coleford
8 s warm up
2 15/10/201 1345hr 2000hrs 6.25 Dema 132kV fault Coleford
8 s
3 16/10/201 0335hr 0805hrs 4.50 Dema 132kV fault Coleford
8 s
4 16/10/201 0815hr 0920hrs 1.08 Dema 132kV fault Coleford
8 s
5 16/10/201 1915hr 2315hrs 4.00 Dema 132kV fault Coleford
8 s
6 18/10/201 1450hr 1600hrs 1.17 132/33kV T2 fault Coleford
8 s
7 23/10/201 1135hr 1145hrs 1.00 Switchover to Coleford
8 s Rhodia
8 27/10/201 1025hr 1225hrs 2.00 Switchover to Rhodia
8 s Coleford for major
maintenance
9 27/10/201 1735hr 1840hrs 1.08 Switchover to Coleford
8 s Rhodia after
maintenance
10 30/10/201 1500hr 1530hrs 0.50 Power failure Rhodia
8 s
TOTAL 26.58    

A total of 4,374 tons of Clinker, in potential production, valued at USD512,339 has been lost
since the beginning of the year. To compound the matter, 5,067 tons of Cement valued at
USD896,859 has been lost to power cuts and interruptions during the same period.

Cumulatively, we have lost USD1,409,198 in potential revenue due to power cut induced
Plant stoppages since January 2018. Further losses are expected on the refractory lining of
the Kiln due to thermal shock induced by the heating and cooling cycles due to frequent
power cuts. The anticipated refractory failure is expected to cost no less than USD150,000
to make good.

We request a detailed and technical explanation on why these interruptions occurred and the
actions you are taking to address or to prevent their recurrence.

Tom Konstantopoulos
Maintenance Manager, Lafarge Cement Zimbabwe